Controls Trainer Development

Updates & Changelog

Controls Trainer is actively developed. This page highlights new training features, important improvements, and user-facing fixes as the platform evolves.

Current release v4.33 Last updated November 15, 2026
v4.33

Level 1: Full Lockout Steps, Fairer Test, Clearer Locked Levels

Build cl-batch268

New

Level 1's lockout now has the steps a real lockout needs: tell the operator and everyone affected before you shut down, try to start the machine after your lock and tag are on (nothing may move), and read the panel's arc-flash label and put on the PPE it names before you test for voltage. Readings count only after these.

Improved

Level 1's zero-energy test now covers every conductor phase to phase and phase to ground: Q1's load side to PE, and the 120 V control power (L to N and L to PE at the 24 V supply's input), as well as the 24 V supply. 15 readings in all.

New

Opening Levels 3 to 10 without access now shows what the level teaches and the ways in: pass Levels 1 and 2 for 30 days free, the Individual plan, or a free company pilot. Logging in from there takes you straight to the level.

Improved

The 15-question tests on Levels 1 and 2 show the choices in a new order on every attempt, and each answer is checked on our server.

Fixed

With the tutorial open, you can scroll the page again: it no longer jumps back to the highlighted section. On Level 1, once the wiring is finished, the lockout panel stays usable while the tutorial is on the program cards, so you can restore power when the page asks you to.

v4.32

Levels 1 and 2: Free 30 Days, Write Your Own Rung, Easier Wiring

Builds cl-batch266 to cl-batch267

New

Pass Levels 1 and 2 on a free account and all ten levels are yours free for 30 days (once per person, with a confirmed email and time really spent on both levels). The card you see after passing either level now says so, and when your pass unlocks the 30 days it says that too, with a Start Level 3 button. The sign-up page and the email confirmation page mention it as well.

New

When you pass Level 1, a card under the pump shows what comes next: Level 2, Troubleshooting, which is free.

New

Level 1 has an optional bonus in Step 3: Build the motor rung yourself. It clears rung 2 so you can write the start/stop logic with the seal-in, then checks your rung by testing it: Start runs the motor, it stays sealed in, and Stop, the E-Stop and an overload trip each stop it without a restart. Put the supplied program back at any time. It does not change how Level 1 is passed.

Improved

Level 1 wiring: after you tap the first end of the next guided wire, the page scrolls the other end into view if it is off screen and marks it "Connect here". Press Esc to cancel a half-made wire.

Improved

Level 2 now asks the same two questions as Level 1 before your lockout can come off: tools removed, covers and guards closed; and everyone clear of the machine and notified. The boxes pulse until both are ticked.

Improved

Long background notes on Levels 1 and 2 are now in closed sections you can open when you want them (What this lesson does and does not show, What each rung does, Panel ratings and technical notes, All readings). The safety lines stay visible, and Level 1 has a short visible line on how to operate the panel buttons.

Fixed

On laptop-width windows, the lockout cards on Levels 1 and 2 no longer cut off Q1's text or draw the green Done over the step names.

Fixed

A signed-in Level 2 pass no longer jumps to the certificate page after a moment: you stay on the level, where the review and 15-question test open and the next-level card shows.

Fixed

Level 1's Step 5 restore list matches today's lockout steps, and the messages on Levels 1 and 2, the sign-up page and the email confirmation page no longer say the certificate is issued the moment your email is confirmed: it follows once you pass the level's 15-question test. That includes the message a brand-new account sees after passing Level 1.

v4.31

Level 2: No Spoilers, and the Way to Level 3

Build cl-batch265

Fixed

The troubleshooting walkthrough no longer gives away the answer. Its second part, which plays once you verify zero energy, now stops before the failed part is picked in the replace list. On a computer, the rest of it (the repair and the restart) plays after you have replaced the part yourself. Watch troubleshooting walkthrough still plays the whole video.

New

When you pass Level 2, a card under Check completion shows what comes next: Level 3, Automatic Pump Control. If your account includes it, the card opens Level 3; if not, it shows the Individual plan ($25 a month, billed $299 yearly).

Fixed

The next-step hint no longer covers the green CLICK TO START JOB button when the page opens. It appears once you start the job or scroll down to the panel, and after a guest pass it stops asking you to press Check completion.

v4.30

Levels 1 and 2: Review and 15-Question Test

Builds cl-batch260 to cl-batch263

New

After you pass Level 1 or Level 2, a review goes over what each step taught, followed by a 15-question multiple-choice test. 12 correct answers pass. The review opens once the supervisor's closing video has finished.

New

The Level 1 and Level 2 certificates are now issued when you pass the test. Your level pass still counts as soon as you finish the level, and certificates issued before this change are not affected. A guest's test score is kept and saved when they log in or create an account.

New

Company plans: test scores appear in the Level 1 and Level 2 cells of the skills matrix and in its CSV export.

Improved

The Share your accomplishment box on the certificate page is now highlighted, so it is easy to find.

v4.29

Levels 1 and 2: Brighter Highlights and Lockout Fixes

Builds cl-batch258 to cl-batch261

Improved

The pulsing highlight on the next terminal is brighter on Levels 1 and 2, on every screen size. On phones and tablets, the meter's dial settings are larger and easier to read.

Fixed

Level 2: Confirm completed verification can be pressed as soon as every reading is recorded. Before, it could stay greyed out.

Improved

Level 2's zero-energy test checks each phase to ground on its own, at the line side and at the work point: 15 readings instead of 11.

Improved

Level 1: once you start wiring, power cannot be restored until the wiring is complete and free of faults.

Improved

Level 1's tutorial waits until the work-order briefing has ended or been skipped, and steps aside while a briefing plays.

Improved

When it is time to remove your lockout on Levels 1, 4, 5, 6, 7, 8 and 10, the Before restoring power box pulses until both of its boxes are ticked, then your tag pulses.

v4.28

Community Forum

Builds cl-batch254 and cl-batch256

New

A community forum is open, with six categories: Site Feedback & Ideas, PLC & Programming, Electrical & Wiring, Troubleshooting & Repair, Maintenance & Mechanical, and Careers & Engineering. Anyone can read it. Posting needs a free account with a confirmed email, and a member's first post is reviewed before it appears.

Improved

The forum is linked from the site footer and from My Training.

v4.27

Levels 1 and 2: Lock Out the Master, Test with a Real Meter

Builds cl-batch245 to cl-batch251

New

Verify zero energy now uses the Level 2 Fluke 87V. The meter sits on the left and each device appears beside it, one at a time, with its real terminals: turn the dial, then place the red and black probes. Level 1 shows the proving unit, main disconnect Q1, the PE terminals and the 24 V supply; Level 2 shows its own disconnect, the overload, the PE bar and the supply. A reading only counts in the function that can prove that circuit dead: V AC for the 480 V circuits, V DC for the 24 V supply.

Improved

The lockout point is now the master disconnect, the fused safety switch that feeds the panel, as in a real plant. With only the panel's own disconnect open, its line terminals stay live (OSHA 1910.333, and OSHA's interpretation of July 28, 2006). Your hasp, padlock and DANGER tag go through the master's lockplate, and the meter is proved on a Fluke PRV240 proving unit before and after the tests, with Q1's line side tested dead.

Improved

Step 1 now turns the panel's main disconnect Q1 OFF before the master: an orderly shutdown that breaks the load first (OSHA 1910.147(d)(2), NFPA 70E). Q1's handle shows OFF in the pictures. When you restore power, the master goes back ON first, then Q1.

Improved

Level 2 on a phone follows the same order: Q1 OFF, master OFF, lock and tag, then the meter is proved on the proving unit.

Improved

The four lockout buttons on Levels 1 and 2 are now a checklist that ticks itself as you work the real devices: click Q1's own switch (in the lockout card or on the panel) to turn it OFF, click the master's handle, then take a hasp, padlock and DANGER tag from the lockout station. Each line says where to do the next step. To restore power, click your tag, then your padlock on the master, push the master back ON, then turn Q1 ON.

Improved

The device for each step now pulses, one at a time: Q1 (in the lockout card and on the panel), then the master, then the lockout station (the whole station pulses, with the hasp, padlock or DANGER tag to take next), and on the way back the tag and padlock on the master, the master and Q1.

Fixed

Level 1: the master disconnect turns back ON when you click it again, as long as your lock is not on it.

Fixed

Turning the master back ON in the middle of the lockout (Q1 already OFF) no longer asks you to turn Q1 back ON: the master pulses and the message says the lockout is not finished. Q1 comes next only when you are restoring power.

v4.26

Wire Numbers on Every Panel

Build cl-batch210

New

Levels 1, 3, 4, 5, 6 and 7 now show a printed wire-number sleeve at both ends of every conductor, the way a real panel is built. The numbers follow Level 2's scheme: 101 and up for the power wiring, X1, 1 and X2 for 120 V control power, +24 and 0V for the DC rails, 10 and up for PLC inputs, 20 and up for outputs, and PE for protective earth.

Improved

On Levels 1, 3 and 4, a wire you land gets its sleeve as soon as it matches a conductor on the print, on any free screw of a bridged strip. On Levels 5 and 6 the factory power wiring is numbered; the control wiring you design yourself stays unnumbered, because it is not on the print. On Level 7 the factory power and ground wiring is numbered too, and labelling your own wires from drawing L3-001 is still your job.

Improved

Each level's print now shows the same wire numbers as its panel.

New

Every print (Levels 1 to 8 and 10) now ends with a Wire list: one row per conductor with its wire number, where it runs from and to, and what it does, plus its color where the panel color-codes it and its size where the panel states one. On Levels 5 and 6 it lists the factory wiring; on Levels 7, 8 and 10 it follows the level's own wire schedule (L3-001, L8-001, L10-001) row for row.

v4.25

Level 6: Panel Power Print

Build cl-batch201

New

Level 6 has a Panel power print button in the wiring step. It shows the factory-wired power section: the 480 V feed and motor branch, the control transformer, the rack and 24 V supplies and the grounding. Designing the control circuit is the lesson itself, so it stays off the print.

v4.24

Level 8: Open the Loop Print

Build cl-batch201

New

Level 8 has an Open the print (L8-001) button beside the wiring tools. It shows both 4-20 mA loops, the level transmitter LT-101 into the analog input and the analog output to the valve positioner FV-101, with wire numbers 801 to 810 and the single-point cable shield.

v4.23

Level 7: Open Drawing L3-001 as a Print

Build cl-batch201

New

Level 7 has an Open the print (L3-001) button in the wiring toolbar. Drawing L3-001 Rev G opens as four sheets: power and grounding, the 24 V buses and the safety relay circuit, the PLC inputs and network, and the parts and I/O lists, with every wire number from the wire schedule.

v4.22

Level 5: Panel Power Print

Build cl-batch200

New

Level 5 has a Panel power print button in the wiring step. It shows the control panel's factory wiring: the 120 V feed through the disconnect and fuse, the rack and 24 V supplies, the 24 V distribution and the grounding.

New

Choosing and wiring the field devices, the stop chain and the I/O is the lesson itself, so those stay off the print.

v4.21

Level 4: Open the Panel's Print

Build cl-batch199

New

Level 4 has an Open the print button beside the wiring tools. It shows the drive panel in three sheets: 480 V power to the drive and the 24 V supply, the 24 V control with the drive interface and Safe Torque Off, and the parts list.

New

The motor ratings, drive parameters and PLC tags are left off on purpose: reading the nameplate and setting them up is part of commissioning the drive.

v4.20

Level 3: Open the Panel's Print

Build cl-batch198

New

Level 3 has a new Open the print (CT-103) button in the wiring toolbar. It shows the pump panel in three sheets: power, 24 V control and PLC I/O with the HAND/OFF/AUTO selector and both float switches, and the parts and I/O list.

v4.19

Level 1: Open the Panel's Print

Build cl-batch196

New

Level 1 has a new Open the print (CT-101) button in the wiring toolbar. It opens the motor starter panel's electrical schematic in three sheets: power, 24 V control and PLC I/O, and the parts and I/O list.

New

Every conductor on the print matches the panel and the wiring you build. The Level 1 panel has no wire-number sleeves, so each conductor is named by the terminals at its two ends.

Fixed

On the Level 2 and Level 10 prints, ground and terminal labels no longer overlap their symbols.

v4.18

Level 10: The Machine's Electrical and Pneumatic Prints

Build cl-batch195

New

Level 10 now has its prints: drawing L10-001, nine sheets covering 480 V power, the 24 V supply and safety relay, safety status, the safe-exhaust valve and drive and pump control, the PLC inputs (slots 1 and 2), the PLC outputs, the analog loop and network, the pneumatics, and the parts list.

New

Open the prints (L10-001) in the intro opens the whole drawing, and each wiring section has its own Print L10-001 button that opens the sheet for that section. Every wire number matches the lesson.

v4.17

Level 2 (Computer): Open the Panel's Print

Builds cl-batch194 and cl-batch194b

New

The full-panel Level 2 has a new Open the print (L2-001) button above the panel drawing. It opens the panel's electrical schematic in three sheets: power, 24 V control and PLC I/O, and the parts and I/O list.

New

The wire numbers and terminals on the print match the panel, so you can trace a fault the way a technician does. You can zoom in and print the sheets.

v4.16

Friendlier Phone Notice on the Levels

Build cl-batch192

Improved

On a phone, the notice at the start of a level now reads Easier on a bigger screen. It explains that the level works on a phone, that turning it sideways gives more room, and that a computer or tablet is easier.

New

The notice has two choices: Continue on this phone, or Email myself the link, which opens your email with the level's address ready to send to yourself.

v4.15

Pass as a Guest, Then Save It With a Free Account

Build cl-batch191

Improved

If you pass Level 1 or Level 2 without logging in, the save button now reads Create free account & save. The account is made in the same tab, you go straight back to the level, and your pass saves by itself.

Improved

Your pass is kept while you confirm your email. Open the link we send and your certificate is issued right then, with buttons to share it.

New

After a pass, the message links to View & share your certificate. When someone opens a certificate you shared, the page invites them to try that level free: Think you can pass it too?

v4.14

More Answers, Free Practice Links and Sharing

Builds cl-batch188 and cl-batch189

New

New answers under Common questions: which of A1 and A2 goes to 0 V, and whether polarity matters on a DC contactor coil (Contactor wiring); whether a multimeter can check phase rotation (3 phase voltage); and what XIO looks like, why an XIO is not highlighted, and what XIC and XIO are called in Siemens TIA Portal (XIC and XIO).

New

The home page and Resources have a Free practice list linking Find the Fault, Fault Finder, the exercises and the beginner guides, no account needed.

New

Each Find the Fault lesson has a share option under its answer: your phone's share menu where it is available, otherwise Copy link.

Improved

The top of the About page now offers Try Level 1 free, the PLC simulator tour and Explore the training. Support is still in the top menu.

v4.13

Certificates Print on One Page

Build cl-batch187

Fixed

Printing a certificate now fits it on one landscape page, Letter or A4. Before, the signatures, the disclaimer and the verify link could be cut off.

Fixed

On medium-width windows the certificate grows to fit its text, so the disclaimer no longer covers the signature labels or hides the verify link.

v4.12

Worked Examples on Three Exercises

Build codex-s6-exercise-pilot-20261106

Improved

The Contactor wiring, Seal-in circuit and XIC and XIO exercises now say what you will practice and have a Try the exercise here link that takes you straight to it.

New

Each of the three has a worked example: coil terminals or auxiliary contacts; Start, hold and Stop; and one button with two opposite results. The seal-in and XIC/XIO pages add the common mistake to avoid and what to check when the light does something else.

New

Each page ends with a link to the next exercise to try.

v4.11

Every Exercise Checked and Corrected

Builds cl-batch184 and cl-batch185

Improved

Forward reverse motor control: project 1 now builds forward only, and project 2 adds reverse together with the interlock. If both directions ever come on together, the bench trips with a red short-circuit message until you press Reset.

Improved

The lockout tagout procedure now has ten lockout steps. It starts by checking the written procedure for every energy source, and you try the start control only with nobody exposed. The restore steps tell everyone affected before the power comes back on.

Fixed

Answers and notes were corrected across the exercises after a full review: what OL means on a meter, live testing on a contactor, and the safety notes on voltage testing (qualified persons, the right PPE, and a meter and leads rated for the circuit).

Fixed

The PLC exercise checks can no longer be passed by a program that latches an output on.

v4.10

Three New Free Exercises

Builds cl-batch174, cl-batch174b and cl-batch175

New

Contactor wiring: tap the terminals on a real contactor and overload relay photo: the A1 coil, L1-L3 and T1-T3, the 13-14 seal-in contact, the 21-22 normally closed contact, and the overload's 95-96 and 97-98.

New

How to test a contactor: lock out first, then use the meter on ohms to check the coil, the main contacts (one has a burnt pole to find) and the auxiliary contacts.

New

Forward reverse motor control: build two seal-in rungs in the ladder editor, then add the interlock so both directions can never be on at once.

Improved

The meter exercises now use the same test leads as Level 2: drag a probe onto a terminal, or tap terminals to place the black lead and then the red one. The rows of label buttons under the contactor and overload photos are gone; you tap the photo itself.

v4.09

Level 1: Says Which Test Is Missing; Smoother Swipes

Builds cl-batch173 and cl-batch179

Improved

If a meter test is still missing in Step 1, Level 1 now names it: when you prove the meter again too early, when you try to wire, and in the Finish Step 1 first pop-up.

Improved

A tap in the gap between two test lines counts for the nearer one. Tapping the disconnect, lock or tag while they are held now says what the orange button does next and scrolls it into view.

Fixed

On a phone, a resting thumb no longer turns a swipe into a zoom of the panel, a zoomed panel hands the swipe back to the page at its top and bottom edge, and a swipe that starts on the operator buttons scrolls the page.

v4.08

Level 2 (Computer): Next Step Bar

Builds cl-batch167 and cl-batch169

New

The full-panel Level 2 has an orange Next step bar at the bottom of the window for the whole service call: the lockout, every meter reading with its dial setting and two glowing test points, the diagnosis, the repair, and restarting the line, through to Check completion.

Fixed

The padlock and the danger tag on the disconnect no longer hang over its terminals: the lock hangs short from the hasp and the tag hangs beside the switch on a cord.

v4.07

Level 1 Shows You Every Next Move

Builds cl-batch166, cl-batch166b, cl-batch168 and cl-batch170

Improved

Level 1 opens at the top with a big Start here: turn the power OFF button. After OFF, the handle stays OFF on a second tap, and the meter has one orange button that does the next move: prove the meter, each test, then prove it again.

Improved

A wrong wire bounces off with the reason, and the next correct terminal glows with a Next wire bar and a Show me button. Once the wiring is done, an orange bar at the bottom of the window walks you through restoring power, RUN and Start.

Improved

Level 1 picks up your saved progress by itself, with a small Welcome back note and a Start over link that asks first. In the tutorial, the lockout cards say Show me and wait until each step is done.

Improved

On every level with a lockout step, the pop-up for wiring too early has one button that takes you to the lockout step, and finished lockout steps show as plain green text. The extra step-by-step lockout help stays on the free Level 1; the higher levels leave the lockout to you.

Fixed

If the PLC program was changed and no longer passes, the Level 1 bar now says so and tells you to load the supplied program. If the lockout checker fails to load, the page reloads itself once.

v4.06

One Resources Menu and a Cleaner Resources Page

Builds cl-batch161, cl-batch162 and cl-batch163

Improved

The Resources menu now holds everything: All resources, Exercises (Electrical and PLC) and the Video library (Video tutorials and Seasons 1 to 3). The separate Exercises menu item is gone, and the Exercises and Video library headings are a little bigger.

Improved

The Resources page is grouped the same way: the Video library first, then Exercises, with two cards that show the real meter, disconnect, lock and tag, push buttons and pilot light from the lessons.

v4.05

Season 3: Find the Fault

Builds season3-website-20261030-r1 and cl-batch160

New

Find the Fault, Season 3 of the short lessons: twelve troubleshooting lessons where a command is on but the machine is stopped. Follow motor circuits, sensors, PLC signals, drives and pneumatics to the fault.

New

Filter the lessons by topic or search them, then watch in a player with Previous and Next.

Improved

Find the Fault is in the Resources menu, and the Season 1 and Season 2 pages link to it.

v4.04

PLC Exercises Use the Level 1 Editor

Builds cl-batch158, cl-batch164, cl-batch165 and cl-batch165b

Improved

The XIC and XIO, Seal-in circuit and Quiz buzzer exercises now use the same ladder editor as Level 1: the instruction palette, Add Rung, branches, PROGRAM and RUN, and the phone editor on a phone. You build your own rungs, and your program is saved for each project.

Fixed

Every project now offers all of the page's buttons, lights and tags, so the quiz buzzer lets you pick Player 2 and Player 3, not only Player 1.

v4.03

Plans Page Spacing Fix

Build cl-batch157

Fixed

On the Plans page, the skills matrix section (Know what is complete. See what needs attention.) lines up with the rest of the page again instead of touching the window edge on narrower screens.

v4.02

Exercises Get a New Look and Real Equipment

Builds cl-batch154 and cl-batch155

Improved

The Exercises page and every exercise page have a new, cleaner design.

Improved

The electrical exercises use the same equipment as the lessons: the Fluke 87V meter and the disconnect drawing.

v4.01

Level 1: Incoming Power Drawn In; Resume Can't Erase Your Work

Builds cl-batch151, cl-batch152c and cl-batch153-153d

New

Level 1's panel now shows the incoming 480 V feeder: L1, L2 and L3 come down the left wireway, along the top wireway and into the main disconnect. The wires from the disconnect to the distribution block run in the wireways too, instead of across the open panel.

Improved

On a phone, Level 1 always uses the phone wiring view; the Full board switch is gone.

Fixed

On every level, the Resume banner can no longer wipe out work from the current visit. Once you have done something, it warns that Resume would replace it, and Keep this visit is the highlighted choice.

v4.00

New Free Exercises: Meter, Lockout and Ladder Logic

Builds cl-batch147-150

New

Three free electrical exercises, a few minutes each and no account needed: how to read a multimeter, how to check 3 phase voltage (where to put the probes), and the lockout tagout procedure in order.

New

Three free PLC exercises: XIC, XIO and OTE; a start/stop seal-in circuit; and a 3-player quiz buzzer where each player's light locks the others out. Build the rungs and run them.

New

A new Exercises page lists all six, and each exercise page has a Common questions section. The exercises are also on the Resources page and in the footer.

Improved

Level 1 links to the exercises: the meter and lockout ones from Step 1, the ladder logic ones from Step 3.

v3.99

Lockout Step Easier to Follow

Builds cl-batch144, cl-batch151, cl-batch152 and cl-batch152b

Improved

On every level with a lockout step, tapping the disconnect picture works its handle, and the control to use next pulses.

Improved

Tapping a test in the list under the meter puts the red and black leads on those points and takes the reading. You can still pick the leads yourself and press Measure.

Improved

Once you are locked and tagged, the lock, tag and handle buttons no longer undo your lockout; they tell you the next step. The remove buttons and the restore checklist come back after zero energy is verified, or if you choose Stopping early?

New

If you try to wire (or run tubing) before the lockout is finished, a pop-up says what is left and offers to take you there.

v3.98

New Look: ControlsTrainer Header and Footer

Builds cl-batch136-142

Improved

The site header has the new ControlsTrainer logo with the line Wire. Program. Troubleshoot., over a split cyan and orange line.

Improved

The footer matches: the same wordmark over the split line, and Wire. Program. Troubleshoot. in place of Practice before production.

Improved

The home page video card and Ready to train your team card, the Plans feature cards and the Press page banner use the same split line. The Press page has the new slogan and the new CT logo in its press kit.

v3.97

Level 2 (Computer): Short Intro, Three Steps

Build cl-batch135

Improved

The full-panel Level 2 now opens with a short job intro and a Start the job button that takes you straight to the panel. The lesson is three steps: lock out, prove it dead and find the failed part; replace it; restore power and run the line.

Improved

The main HMI, the PLC ladder logic and the full service-call notes are still there, in the intro, one click away.

Fixed

The Level 2 tutorial matches the lesson again: 7 voltage readings, where to find the disconnect, the resistance checklist, the operator HMI under the conveyor, and the Check completion button.

v3.96

Level 2 (Computer): Fewer Readings, Easier Start

Build cl-batch134

Improved

Proving the panel dead now takes 7 readings instead of 15: prove the meter, test the part you will replace phase to phase and one phase to ground, check its control circuit, then prove the meter again.

Improved

Step 3 now tells you where the main disconnect is, and its handle glows if you have not found it after 20 seconds.

Improved

A short how-to above the meter explains picking a setting, then placing the red and black leads. Press Got it and it stays hidden.

v3.95

Level 2 (Computer): Moves You to the Next Step

Build cl-batch133

Improved

The full-panel Level 2 now scrolls to the next step when you finish one: after you acknowledge the alarm, after the voltage checks (to the resistance checks), after the diagnosis, after the repair, and to Check completion once the conveyor runs again.

v3.94

Level 2 (Computer): Small Fixes

Build cl-batch131

Fixed

Proving the meter (the first and last voltage readings) now needs two LINE terminals, phase to phase, about 480 V. A line-to-ground reading no longer counts.

Fixed

The lockout hint and the Resumed message now match where you are in the job: after the voltage checks, after the repair, and after your lockout comes off.

Fixed

The Save & Exit button fades and lets your click through when it sits over a lesson button near the bottom of the window.

v3.93

Level 2 (Computer): Operator HMI at the Conveyor

Build cl-batch130

Improved

Step 5 of the full-panel Level 2 has an operator HMI right under the conveyor. It shows the same status and alarm as the HMI in Step 2, and its RUN, STOP, RESET FAULT and Acknowledge buttons work the real controls, so you can restart the line while you watch it.

v3.92

Level 2 (Computer): Clear Resistance Checks

Build cl-batch129

Improved

On the full-panel Level 2, Step 3 now lists the resistance checks under the voltage checks: press the overload RESET, measure the three motor winding pairs, then measure the overload contact 95 to 96. Each one ticks green as you do it.

Improved

When the diagnosis is complete, the page scrolls to Step 4 so you can replace the failed part, and messages under the panel clear after a minute.

v3.91

Level 2 Needs 5 Minutes Again

Build cl-batch128

Improved

The Level 2 certificate now comes only from the full control panel on a computer, so like every other level it needs at least 5 minutes of active work. (It was 2 minutes while the short challenge earned the certificate.)

v3.90

Level 2 Certificate on a Computer; Probe Fix

Build cl-batch127

Improved

The quick 5-step Level 2 on a phone is now practice. When you finish it, it says good job and asks you to retry Level 2 on a computer, where the full control panel earns the Level 2 certificate.

Fixed

On the full-panel Level 2, a meter probe dragged onto a terminal now connects to it. Before, it was left floating where you let go and stayed in place on the screen when you scrolled, and the terminal name stayed stuck on screen too.

v3.89

Level 2: Full Panel on a Computer, Quick Challenge on a Phone

Build cl-batch126

Improved

On a computer, Level 2 is the full troubleshooting bench again: a control panel full of devices, a Fluke meter that floats along as you scroll and can be moved anywhere, and probes you place on each terminal yourself.

Improved

On a phone or tablet, Level 2 stays the quick 5-step troubleshooting challenge. Each version has a link to the other, and both earn the same Level 2 certificate.

v3.88

Level 2: Clearer Meter Step

Build cl-batch125

Improved

Step 4 of Level 2 now says plainly that the power stays off and lists the three moves: set the meter to Ω, tap a part to test it, then pick the part that failed. The Ω key flashes until you pick it, and each message shows next to the part you tapped, so on a phone you no longer have to scroll to find it.

v3.87

Level 2 Is Now a Troubleshooting Challenge

Build cl-batch124

Improved

Level 2 is a short service-call challenge in five steps: read the alarm and decide what to do, lock out in the right order, prove the panel dead (live, dead, live), find the failed part with as few meter checks as you can, then set the new overload from the motor nameplate and restart the line.

Improved

You make the calls: the lesson no longer tells you every move. Each wrong move explains why it was wrong and costs a star, and the end shows your stars, time, mistakes and meter checks.

Improved

It takes a few minutes instead of a long walkthrough, works the same on a phone, and still earns the free Level 2 certificate. A Level 2 pass now needs 2 minutes of active time instead of 5.

v3.86

Level 2 Tells You the Next Step on a Phone

Build cl-batch123

Improved

On a phone, a Next: line under the meter buttons always names the one thing to do now: set the dial, lift the probes, tap the test points, or tap the button for the next reading.

Improved

The test points a step names glow orange on the panel until you have tapped them.

Improved

Set the dial on the meter picture and the panel comes back by itself, so you are never left on the meter wondering where to go.

v3.85

Level 2 Meter and Part Picker on iPhone

Builds cl-batch122 and cl-batch122b

Fixed

On an iPhone, Level 2's meter view showed only the probe leads: the meter itself is drawn again, at a usable size.

Fixed

On a phone, the Inspect equipment picker is back, so you can choose the failed part; it shares one row with Replace and Why, giving the panel more room.

Improved

On a phone, Level 2 uses one lesson bar (Log in, Home, Save & Exit, Job sheet) instead of the site header plus a lesson bar, and the step box and meter controls are a little shorter, so the panel has more room on a real iPhone screen.

v3.84

Level 2 Fits Your Phone

Build cl-batch121

Improved

On a phone, Level 2's lesson bar is one short row with Save & Exit and Job sheet, so the service call gets most of the screen. Long step instructions show three lines with More, and notes above the panel open with a tap.

Improved

The meter controls take less room, so the panel you test on is about three times taller at the resistance checks, and a tap just beside a small test point lands on it.

Improved

When the repaired conveyor starts, it scrolls into view, so you can watch it run. Held sideways, the call now fits under one short bar instead of two rows of menus.

v3.83

Level 1 Is Easier to Follow on a Phone

Build cl-batch120

Improved

While you wire on a phone, the tutorial card sits as a short sheet at the bottom of the screen without dimming the panel, and the Wiring Guide opens over the bottom half instead of the whole screen, so you can keep wiring with either one open.

Improved

Finishing a wire on a module with many screws (IB16, OB16E, the terminal strips, the starter) shows its terminal list without the crowded photo; on its own, that photo is drawn larger.

Improved

In RUN, the Start and Stop buttons sit right under an open rung's drawing, so you can watch the power flow while you press them.

Improved

Scrolled down an open rung, the way back is a slim bar across the top of the screen instead of a button over the instructions.

Improved

An edit that makes the program fail the lesson's logic check says so at the top of the phone ladder editor, with how to put it back.

Fixed

The phone ladder rows show ] [ and ]/[ on one line on an iPhone, and the phone screens no longer show desktop instructions (press Delete, press and hold). The tutorial card fits its notes on a phone.

v3.82

Pinch the Level 1 Ladder on Your Phone

Build cl-batch119

Improved

Pinching in the phone ladder editor no longer magnifies the whole page. Spread two fingers on a rung card to open that rung, and pinch its drawing to zoom.

Improved

Zoomed in, the rung drawing grows taller (up to half the screen) so you see more of it, and a one-finger swipe at normal size scrolls the page smoothly.

Fixed

If the page itself is magnified, the ladder and wiring drawings hand the pinch back to your phone, so you can always zoom back out.

v3.81

Zoom Level 1's Panel on Your Phone

Builds mobilezoom20261028 and cl-batch118

Improved

Pinch the panel drawing in the phone wiring view, or use its − + and Fit panel buttons, to zoom up to 400% without magnifying the whole page. Drag with one finger to look around; a device you tap still opens at its normal size.

Improved

When you start a wire, the "Where does this wire go?" panel always opens showing the whole panel, so the other end is never off screen.

Improved

Step Back and Clear Wires sit right above the phone wiring view. Clear Wires asks before it removes everything, and stays greyed out until there is a wire to clear.

Improved

Phone ladder rows show each instruction's full description instead of cutting it off, and terminal labels read NO and NC.

v3.80

Edit Level 1's Ladder on Your Phone

Build cl-batch116

Improved

On a phone, Level 1's PLC program shows each rung as a card. Tap one to open it: the rung is drawn at full size above one large row per instruction.

Improved

In PROGRAM mode, tap a contact on the drawing or its row to switch XIC/XIO, pick another tag, move it, branch around it or delete it. Tap + to insert a contact or a parallel branch where you want it.

Improved

Pinch, double-tap or use the zoom buttons on the drawing. Turn your phone sideways to see the whole ladder at full size, with every instruction still tappable.

Improved

Undo, Redo and Add Rung sit above the rungs, and the Start and Stop buttons sit right under the ladder, so you can watch the power flow while you test. Prefer the original editor? Tap Use the full editor instead.

v3.79

Wire Level 1 on Your Phone

Build cl-batch113

Improved

On a phone, Level 1 now shows the whole control panel at once, laid out like a real enclosure, with the pushbuttons on the door and the pump motor out in the plant.

Improved

Tap a device to zoom in on it, tap a terminal, then tap where the wire goes. The screen splits so both ends of the wire are big enough for your thumb.

Improved

Prefer the original layout? Tap Full board to switch back at any time.

v3.78

Your Level 1 and 2 Practice Time Counts Before You Log In

Build cl-batch112

Improved

Use Levels 1 and 2 without an account and your active practice time is still counted. When you log in to save your pass, that time moves to your account, so your certificate reflects the work you did.

Improved

A pass finished too quickly to be your own work earns no certificate, whether or not you are logged in. The level starts over so you can earn it.

v3.77

Nine Practical Video Tutorials

Build tutorials20261024

Improved

A new Video tutorials library brings together motor starter wiring, PLC troubleshooting, ladder logic, VFD commissioning, HMI programming, lockout practice, machine guarding and the maintenance skills matrix. Find it in the Training section of the footer.

Improved

Each tutorial has its own page with a short narrated video, English captions, chapters, written steps, actual lesson screenshots and a link to practice in the matching lesson.

v3.76

Keep Your Meter Probes in Place

Build probes20261023

Improved

In Level 2, advancing to the next voltage or resistance check keeps both probes on the terminals you selected. Move only the probe you need to change, or use Lift both. The guided restart still asks you to remove the probes before restoring power.

v3.75

Individual Plan and Your Own Training Workspace

Build cl-batch44

Improved

Training on your own? The Individual plan gives one person all ten levels for $299 per year, billed yearly. Cancel anytime; access continues to the end of the paid year. Company plans are unchanged.

Improved

Individual subscribers get their own training workspace: progress and active time on every level, a Continue button that picks up where you left off, certificate renewal dates, and billing in one place.

Improved

Add your valid certificates to your LinkedIn profile in one click, and print or save a training record with certificate IDs to share with an employer.

Improved

Share any certificate, including the free Levels 1 and 2, on LinkedIn, Facebook, X or Reddit, or copy its link. You can also add it to your LinkedIn profile. On a phone, Share opens your installed apps. The post shows a preview card with your name, the level you passed and a link anyone can use to verify it.

v3.74

Consistent ControlsTrainer Logos

Build fix1074

Improved

Small CT logos now consistently use the original white C, orange T and orange underline in workspaces, demo booking, ladder editors and certificates. The main website header keeps its existing design.

v3.73

A Clearer Way to Book Your Demo

Build fix1073

Improved

The demo booking page has a fresh ControlsTrainer design with three clear steps: choose an available date and time, enter your details, and check your email for the Zoom invitation. The calendar clearly labels Eastern Time and adapts to smaller screens.

Fixed

Booking errors remain visible, and returning to the calendar lets you choose the same time again without losing your details.

Improved

After booking, you can optionally create a free account with your name and email already filled in. Signed-in visitors can use their saved details when booking. Password setup and email confirmation remain required for new accounts.

v3.72

A Clearer Path Through ControlsTrainer

Build fix1072

Improved

The homepage now introduces the simulator before the videos, with the two free levels directly below them. A dedicated manufacturing section shows the skills matrix, training tools and new-hire assessments.

Improved

Homepage pilot buttons open self-service setup directly. The standalone slideshow has been removed; detailed screenshots remain on the PLC Simulator page.

v3.71

A More Compact Homepage Video Layout

Build fix1071

Improved

The homepage product overview and demo use a narrower, more compact layout, with smaller video players and less surrounding space.

v3.70

A Lighter Homepage Video Section

Build fix1070

Improved

The homepage videos now sit on a light gray background with white cards, navy text and orange accents.

v3.69

Clearer Homepage Video Heading

Build fix1069

Improved

The homepage video section now reads: See ControlsTrainer in action.

v3.68

Two Ways to Explore ControlsTrainer

Build fix1068

Improved

The homepage pairs a short product introduction with the narrated Level 1 demo. Choose a video, then try Level 1 free. The videos sit side by side on larger screens and stack on phones.

v3.67

A Clearer View of Partner Commissions

Build fix1067

Improved

The Partner Overview video now shows the new lifetime commission graphic, including eligible renewals and an illustrative earnings example. Narration, music and timing are unchanged.

Improved

Book a 30 minute demo online at controlstrainer.com/demo.php.

v3.66

Partner Tutorial Status Screens Match the Narration

Build fix1066

Improved

The partner tutorial now shows pending review, action needed and bank setup ready at the corresponding spoken instructions. Updated sample screens keep the setup checklist, public referral links and tutorial chapters consistent.

v3.65

Clearer Partner Onboarding Instructions

Build fix1065

Improved

The partner video starts at the homepage footer and explains the application and invitation paths separately. Narration, screenshots, captions and chapter links follow the account, email verification, approval and setup steps.

v3.64

Partner Overview Graphic Refined

Build fix1064

Fixed

The illustrative carrier conversation graph uses a clean arrowhead aligned with the trend line. Video narration and timing are unchanged.

v3.63

More Natural Dashboard Walkthroughs

Build fix1063

Improved

Partner and team management tutorials show the actual desktop dashboard and its selected navigation. Phone instructions have been removed, and captions and chapter times follow the revised videos.

Fixed

The partner tutorial footer no longer has an unintended focus highlight. Standards labels and safety illustrations in the partner overview have more balanced proportions.

v3.62

Clearer Video Guides and Public Navigation

Build fix1062

Improved

Tutorial screenshots preserve complete panels and controls with more space around all four edges. The partner overview and product demo use clearer framing with the existing narration and timing.

Improved

Public pages now share an organized footer with grouped links and a visible Become a partner link. The partner tutorial shows the same navigation.

v3.61

Guided Partner and Company Workspaces

Build fix1061

Improved

Partner and company dashboards now have a consistent sidebar, clear sections and a responsive navigation menu. Each account sees the tools permitted by its role.

Improved

Updated video tutorials show the actual navigation, forms and results as each step is narrated. Chapters, captions and downloads are available inside the dashboards.

Improved

The partner overview now shows the updated company reports and partner workspace.

Fixed

Ladder symbols display more clearly in Levels 6 through 10, and caption files use the browser compatible video caption format.

v3.60

Partner Tutorial Screens Follow Each Step

Build fix1060

Improved

The partner setup tutorial now shows the invitation email, partner navigation, account forms and confirmation email as each step is narrated.

v3.59

A Clearer Partner Overview

Build fix1059

Improved

The partner overview introduces OSHA, the National Electrical Code and NFPA with clear standards names and safety graphics timed to the narration.

Improved

An animated closing sequence matches the spoken benefits and ends with a clear website invitation.

v3.58

Workspace Navigation and Reporting

Build fix1058

Improved

Refined workspace navigation, responsive layouts and reporting presentation. Existing account permissions and training workflows are preserved.

v3.57

Simpler Onboarding and Training Follow Through

Build fix1057

New

Verified business accounts can apply to become partners. Owner approval creates an invitation and sends the next steps automatically.

New

Department Heads and Team Leads can save training plans and assign them automatically to eligible new team members.

New

Optional setup reminders, weekly pilot progress summaries and pilot expiry reminders help teams keep moving. Email preferences are available in My Training.

Improved

Private owner reports show automatic actions, email acceptance and reported delivery failures. An independent monitoring connection can alert the owner if scheduled checks stop.

Improved

Partner and manager video tutorials include the new application, training plan and email preference options.

v3.56

Subtle Music for Video Guides

Build fix1056

Improved

The product demo and partner overview now feature a quiet electronic soundtrack that lowers beneath narration. Partner and manager tutorials use the same music at the opening and closing, keeping detailed instructions focused on the speaker.

v3.55

Product Demo Narration Refinement

Build fix1055

Fixed

Corrected clipped words at narration transitions in the Level 1 product demo. The complete original narration is preserved, with edits placed in the quiet gaps between sentences. The sharp picture and 2:27 runtime are unchanged.

v3.54

Narration for the Product Demo

Build fix1054

Improved

The Level 1 product demo now includes calm narration matched to the safety checks, twenty wiring connections, supplied ladder program and pump test. The existing sharp footage and 2:27 runtime are preserved. Optional English captions are available in the website players.

v3.53

A Simpler Team Training Workspace

Build fix1053

Improved

The optional live fault exercise entry points and promotional text are hidden for now. The feature and its saved exercise history are preserved.

v3.52

A Tutorial for Manufacturing Leads and Managers

Build fix1052

New

Department Heads and team leads can watch a narrated tutorial from their company dashboard. Eight steps cover company branding, invitations, assignments, progress, the skills matrix, reports, messages and pilot billing. Chapters, captions and a downloadable copy make it easy to follow along.

v3.51

Partner Setup, Step by Step

Build fix1051

New

Partners can watch a narrated setup tutorial directly from their dashboard. Chapters cover invitations, email verification, bank setup, sharing and earnings, with captions and a downloadable copy.

v3.50

Your Manufacturer PDF, Delivered Automatically

Build fix1050

New

After verified partners accept the terms, their personalized manufacturer PDF is emailed automatically with their referral links. Partners can download it or request another copy from their dashboard.

Improved

Confirmed email failures retry automatically. Delivery problems and recovery results appear in the owner process report.

v3.49

Process Monitoring and Resource Tracking

Build fix1049

New

The owner dashboard records process issues, automatic corrective actions and verified outcomes. Account holders receive instructions for setup steps that need their attention.

Improved

Resource links and campaign links can be measured separately. The introduction video is now called Product overview.

v3.48

Easier Partner Sharing and Logo Approval

Build fix1048

New

Partners can download a manufacturer brochure with their own referral links after verifying their email and accepting the terms. Bank setup can be completed before payment.

Improved

Review and approve a discovered company logo before it appears for employees. Your existing branding stays in place until you approve a replacement.

v3.47

Your Company, Your Training Workspace

Build fix1047

New

Add your company website during pilot setup to find and optimize your logo automatically. Your Department Head can review, replace or remove it from Company branding.

Improved

Your company logo appears on the team workspace and employees’ My Training pages, and stays with your account when you upgrade.

v3.46

Simpler Company Pilot Setup

Build fix1046

Improved

The company pilot page brings the offer, signup and training videos together in a shorter layout using the main website branding.

v3.45

A Clearer Company Pilot Experience

Build fix1045

Improved

The company pilot page now matches the Controls Trainer website, with clearer setup steps, training previews and answers to common pilot questions.

Improved

Links open in new tabs so you can explore training and plans while keeping the pilot page available.

v3.44

Start Your Company Pilot Online

Build fix1044

New

Create an account, confirm your email and start a free 30 day company pilot online. Invite your team and begin training from your own dashboard.

Improved

Manufacturing teams can watch the commercial and product demonstration directly from the pilot page.

v3.43

Tutorials That Keep the Controls in View

Build fix1043

Improved

Tutorial instructions find space beside the highlighted control across all ten lessons and the team setup tour.

New

Move tutorial cards by dragging or with the arrow keys, or choose a compact view. Long instructions and large highlighted sections have their own scroll area on smaller screens.

v3.42

Request a Company Training Invoice

Build fix1042

New

Review company subscription pricing and request a payable invoice from your account.

Improved

Payment activates the same pilot company, preserving its people and training records.

v3.41

A Clear Next Step After Your Pilot

Build fix1041

Improved

The pilot renewal screen thanks your team, explains how to continue training and confirms that your records are saved.

v3.40

Continue Your Team Training After a Pilot

Build fix1040

New

Company pilots show the time remaining and a clear next step when the pilot ends.

Improved

Upgrade a pilot to a company subscription while keeping the same people, assignments and training history.

v3.39

Clearer Company Plans and Pilots

Build fix1039

Improved

Team, Business and Enterprise plans now show their complete training and management features.

Improved

Schools and companies can request a free 30 day pilot. Existing subscribers keep access to their billing controls.

v3.38

Your Partner Dashboard

Build fix1033

Improved

Invited partners have guided account setup and a private dashboard for their referral link, results and recorded commissions.

Improved

Bank setup explains each next step and shows whether Stripe needs information or is still reviewing it.

v3.37

Partner Account Setup

Build fix1031

Improved

Invited referral partners can review the program terms, complete secure payment setup with Stripe, and access their Stripe Express account.

v3.36

Personal Partner Introductions

Build fix1030

Improved

Partner introductions can now display the referring company logo alongside Controls Trainer, with a personal welcome and pilot invitation.

v3.35

Partner Training Introductions

Build fix1029

Improved

A new partner introduction page brings together browser training previews, employer records and a free 30 day pilot.

v3.33

Level 2 Meter Probe Fix

Build fix1026

Fixed

Level 2: the red and black meter probes no longer slip behind the meter toolbar, so they can always be picked up, and on shorter screens the panel drawing stays large enough to tap every terminal.

v3.32

New Level 1 Walkthrough Video

Build fix1024

New

A new, sharper Level 1 walkthrough video on the homepage and the PLC Simulator page: lockout and live-dead-live checks, all 20 wiring connections, the PLC program, then the pump filling the day tank. It runs 2 minutes 27 seconds.

v3.31

Log In and Log Out on Every Page

Build fix1023

Fixed

Every page header now shows Log In and Create Account when you are signed out, and My Training and Log Out when you are signed in. Before, most pages only showed My Training.

Improved

Log Out is now a protected button, so another website cannot sign you out. An old Log Out link asks you to confirm.

Improved

The homepage level cards are back to their original artwork, and the production-cell slide now shows the whole Level 10 cell with its operator terminal.

v3.30

iPhone Terminal Picker Fix

Build fix1022

Fixed

On iPhone and iPad, tapping between closely spaced terminals on a wiring board now opens the "Which terminal?" list, as it already did on other phones.

v3.29

Keep Your Build, Keyboard HMI Editing and Clearer Panels

Build fix1021

Improved

Passing a level no longer erases your saved work on the server. Levels 5 and 6 reopen with your passed build ready for practice, next to the note that shows when you passed.

Improved

The Level 9 HMI Studio and ladder editor can be used with the keyboard: place and move objects, open properties, bind tags, browse the explorer tree and use the menus with Tab, the arrow keys, Enter and Escape.

Improved

Level 6 Step 1 now accepts only the hardware the work order needs; extra parts such as an unneeded horn are named so you can remove them.

Fixed

Level 5 device pictures (E-stop, proximity sensor, guard switch and pressure switch) have large, readable terminal labels.

Fixed

Level 1 tutorial cards for the lockout steps no longer cover the meter or the lock and tag buttons. Level 3 resumes with the controller mode, E-Stop and overload as you saved them, and its checklist no longer marks power restored before the work is done.

Improved

Level 2 adds an "About this panel" note to the job sheet with the panel's accuracy and safety basis.

v3.28

Level 9 Acceptance Test and Level 7 Hardware

Build fix1020

Improved

Level 9 now runs its ten-point acceptance test when you press Run Acceptance Test in Step 8, instead of starting it automatically. The status line says what is still needed before the test can run.

Improved

Level 9 operator controls are larger: at least 44 px on phones and touch screens, so START, STOP, RESET, ACK, the mode selector and the login buttons are easier to tap.

Fixed

Level 7 describes its 1756-IB16 and 1756-OB16E modules correctly as 16-point ControlLogix modules with 20-pin terminal blocks, and terminal names now show the printed pin numbers.

Improved

Level 7 component selection now includes a few parts the drawing does not use; leave them out. The Wiring Guide opens docked at the lower right so it does not cover the board.

v3.27

Certificates Renew Every 12 Months

Build fix1018

Improved

Certificates of completion are now valid for 12 months from the date you pass the level. Certificates, the verify page and My Training show the valid-until date, or Expired. Pass the level again to renew; your first completion date and certificate ID stay the same.

Improved

For learners on a company seat or paid subscription, certificates for Levels 3–10 also need that access to be active. Levels 1–2 renew by date only.

Improved

Company reports, the skills matrix and the CSV export show whether each certificate is still valid.

Fixed

Passing a level again no longer clears your saved build.

v3.26

Fixes Across All Ten Levels

Build fix1018

Fixed

Clearer feedback in every level: wiring messages use the printed terminal names, checks say which row or step is wrong, and wrong meter readings explain which pair the check asks for.

Fixed

Level 3 will not switch to RUN while the controller has no power, and the scan counter only counts in RUN. Level 9 grades alarm severity and explains denied HMI commands.

Improved

Accessibility improvements: keyboard-operable HMI tabs in Level 2, lamp states announced as text, labelled certificate links on My Training, and named form fields.

Improved

A new page-not-found page, fewer background requests while you train, and the floating Save & Exit bar no longer blocks wiring terminals.

v3.25

New Guides to the Training

Build fix1017

New

New pages: PLC Simulator, Online PLC Training (all ten levels in detail), Ladder Logic Training and PLC Troubleshooting Training, with real screenshots from the lessons.

Improved

The homepage level cards and image carousel now show real screens from the current lessons.

v3.23

Reliability and Phone Fixes

Builds fix1013–fix1014

Fixed

Saving, resuming and completion were made more reliable across all ten levels, and passing a level now keeps you on the page with a link to your certificate.

Improved

On phones and tablets, tapping between closely spaced terminals opens a short list so you can pick the right one.

Fixed

Many lesson corrections, including drive deceleration and stop behaviour in Level 4 and clearer hints in Levels 1–3.

v3.22

Level 2 Service Call Fixes

Fixed

Closing the Level 2 service call shows your result again, including the log-in and Save & get certificate prompt for visitors who are not signed in.

Fixed

A Level 2 voltage reading taken with the wrong meter function now explains why it was not recorded, and the probes can stay in place while you change the function.

Fixed

The Level 2 job sheet and coach now describe the same control-circuit check, and choosing the failed part starts with no part preselected.

Improved

Level 2 clean-ups: the lockout status says when a lock is on without its tag, unlit HMI status tiles are dimmed, a wrong part choice explains that your readings do not point to it, Save & Exit leaves time to read where your progress was saved, and the coach box no longer leaves a blank gap on phones.

v3.21

A Realistic Level 9 Inspection Station

Improved

Level 9 now has a dedicated inspection station with layered equipment imagery, moving cartons, a camera inspection light and pneumatic reject motion. It has its own appearance, distinct from the Level 10 filling cell. Conveyor motion responds to the simulated machine state.

Fixed

Level 9 auto-solved demonstrations no longer save a completion or open a certificate. Demonstration status stays with saved work; a clearly marked fresh independent attempt is required to earn a certificate.

Improved

Level 2 now has visible My Training and Home links in its service-call header, including on phones.

Improved

The Level 2 service call has a steadier coaching box, shorter feedback with a Read feedback button for the full text, larger meter buttons on phones, and asks before resuming a saved call. A call saved by an older version starts over.

Fixed

The Level 10 Field I/O table now lists every wired input and output. You still assign the same 11 tags; the other channels are already assigned from the drawing. Every physical device on the ladder, output coils included, shows its I/O address. Saved answers are kept.

v3.20

Delete Key Editing in the Ladder Editor

Improved

Ladder editing now works the way professional PLC programming software does, and the red × buttons are gone. Click a device to highlight it, then press Delete to remove it. Click a rung number to highlight that rung, then press Delete to remove the whole rung. Editing still needs PROGRAM mode, and on Levels 1, 6, 7, 9 and 10 Undo brings a deletion back.

Improved

Levels 1, 3, 6 and 7: a parallel branch is taken apart one device at a time. When a branch leg has no device left, the branch goes away and the devices on the other leg drop onto the rung where the branch was.

Improved

Levels 1, 3, 6 and 7: the tag name and the instruction's type (XIC or XIO; OTE or TON on Level 3) are each picked from a list shown as underlined text, the type under the I/O address on the selected rung, instead of a boxed drop-down list. On Levels 6 and 7 the tag name used to be a typing box whose suggestions often stayed hidden.

Improved

Levels 9 and 10: a cell's tag is picked from a list instead of a typing box (numbers such as limits are still typed), and the selected cell shows its instruction type under it, to change XIC/XIO or the compare instruction the same way.

Improved

Levels 6, 7 and 10: a field device shows the I/O address assigned to it in the lesson's I/O step, or "(no I/O assigned)" until it has one; on Level 10 this covers the devices in the Field I/O table. Internal bits show nothing.

Fixed

Levels 6 and 7: clicking an empty spot on a rung and pressing Delete no longer removes the whole rung. Only a highlighted instruction or rung number is deleted. The tutorial's ladder cards now point at the ladder editor.

Improved

Levels 9 and 10: the × on each instruction cell is gone. Select the cell and press Delete to clear it.

Fixed

Levels 9 and 10: the ladder's keys (Delete, Undo, Redo and the arrow keys) act only while you are working in the ladder. The arrow keys no longer jump the page to the ladder editor, Undo pressed in another section no longer changes the ladder program, and Enter or Tab in a tag list works normally.

v3.19

Ladder Diagrams Drawn Like Professional PLC Software

Improved

Every ControlsTrainer 5000 ladder now draws a parallel branch the way professional PLC programming software does: the top leg sits on the rung, and each lower leg hangs below it as an open box. A device on a lower leg reads exactly like one on the top leg, with its tag name above the instruction.

Improved

Levels 2, 3, 6 and 7 now show, under each device, the I/O address its tag is an alias of, written as <Local:1:I.Data.0> as on Level 1. Internal bits have no I/O address, so nothing appears under them. On Levels 6 and 7 the address appears as soon as that device's I/O assignment is made.

Fixed

Level 3's ladder: the rung wire no longer runs through the contacts, each branch's side lines now meet both legs, and the edit tools sit in a row under each instruction on the selected rung, as on Level 1.

Improved

The right power rail is one straight line down the routine: the coils line up at the rail, and a long rung scrolls sideways instead of squeezing its instructions together. Level 8 numbers its rungs from 0 in each routine, as PLC programming software does.

v3.18

Right-Click Wiring Menu and Trace Wire

Improved

Levels 1, 3, 4, 5, 6, 7, 8 and 10: right-click anywhere in a wiring section to open the wiring menu: Undo, Clear Wires, Remove Wire, Trace Wire and Wire Hint. Remove Wire works on the terminal or wire you right-clicked. On a pneumatic board the same menu works on ports (Remove Tube, Trace Tube). Close it with the × in its corner, the Esc key, or a click elsewhere. On a touch screen, press and hold.

Improved

Trace Wire: click a terminal to start a wire, then right-click and choose Trace Wire. The page scrolls to the terminal that wire belongs on, taken from the lesson's own wiring list, and marks it; one more click lands the wire. Trace Wire is grayed out until a terminal is selected. Where any free position of a terminal strip counts, it points to a free position.

Improved

The tool column beside the wiring boards is gone, so the boards have more room. A Wire hint button is back above each board, where the wiring tools used to be. Remove Wire takes off the wire on the terminal you right-clicked, or the wire you right-clicked; the lockout rules still apply, and factory wiring cannot be removed.

Improved

Every wiring level's tutorial covers the wiring menu: each card that shows a wiring or tubing board says to right-click anywhere in that section, a new card explains the whole menu, and the cards that said Step Back now point to it.

v3.17

Tutorials That Open Where You Are

Improved

Levels 3–10: the Tutorial button now opens at the part of the lesson you are viewing, as on Level 1. A list of tutorial cards, grouped by lesson step, takes you straight to any card. The tutorial that opens automatically on your first visit still starts at the beginning.

Improved

Every numbered lesson step on these levels now has at least one tutorial card. Steps that had none get a short summary card, and the full instructions stay in the lesson. Level 3 also gains a card for the I/O Status table.

Fixed

Level 6: opening the lesson from a tutorial link no longer causes a script error, and reloading the page no longer reopens the tutorial.

v3.16

Wiring Tools on Every Wiring Level

Improved

Levels 3, 4, 5, 6, 7, 8 and 10 now have the Level 1 wiring tools beside every wiring and tubing board: Undo, Clear all wires (or Clear all tubing) and a Wire hint guide you can move while you work. The tools stay in view as you scroll the panel, and Undo is grayed out when there is nothing to undo.

Improved

On these levels, right-click a terminal to remove the wire landed on it, or a pneumatic port to remove its tube. The lockout rules still apply, and factory wiring cannot be removed.

Improved

Each Wire hint is taken from the lesson's own wiring list. On Levels 6, 7 and 10 the complete list stays behind an extra click, so you can work out the design first. Level 7's hints now open in the guide window instead of below the board, and each Level 10 section's Check button sits with its wiring tools.

Fixed

Level 3: right-clicking a wire removes it again, as the on-screen instructions say.

v3.15

Level 1 Wiring Tools, Clearer Ladder and Safer Seal-In

Improved

Level 1: Undo, Clear all wires and Wire hint now sit in a column beside the field-wiring panel and stay in view while you wire. Right-click a terminal to remove its latest field wire; the lockout still applies and factory wiring cannot be removed.

Improved

Level 1: the tutorial opens at the section you are viewing, and any step can be chosen directly. The work order is easier to read, and the device details and panel notes open when you need them.

Improved

Level 1: the ladder editor now reads like professional PLC software. Each instruction shows its I/O address, such as <Local:1:I.Data.0>, each rung has a comment explaining what it does, all three rungs and their coils fit on a laptop screen, and parallel branches are drawn clearly. Editing controls appear on the selected rung.

Fixed

Level 1: the supplied program's seal-in now requires both Run_Confirmed and M1's auxiliary contact, so an auxiliary contact that reads on while the motor is off can no longer start the motor by itself. Saved copies of the supplied program are upgraded; programs you wrote yourself are kept and graded.

Fixed

Level 1: a parallel branch keeps every contact placed on it, and the + button on a branch leg adds another contact.

v3.14

Guided Meter Checks and Accessible Level 5 Controls

Improved

Level 2: a compact voltage-verification guide stays beside the work with the next required reading, live meter display, function selector and probe controls. Find buttons bring each test point into view; learners still place the probes and make every required measurement. The full reading history is available on demand instead of in a scrolling checklist.

Improved

Level 2: removed the optional damaged-meter exercise. Earlier saves with a damaged or replacement meter now resume with a working meter. The required live-dead-live verification and repair prerequisites still apply.

Fixed

Level 5: HOME, CYCLE START, STOP, RESET and E-STOP now fit inside the operator screen. The completion checklist starts compact on smaller screens so it does not cover the keys. The existing stop and restart behavior is unchanged.

v3.13

The Christian Update — A Clearer First Lesson

Improved

Named in thanks to Christian, whose first-time review highlighted a crowded opening tutorial and a checklist covering the meter controls. His feedback helped make Level 1 easier to follow.

Improved

Level 1 now has 18 short, focused tutorial cards. Isolation, meter checks, wiring, program review and power restoration are explained separately, in the order learners need them.

Fixed

The Level 1 completion checklist folds into a compact status bar during the tutorial and opens when the walkthrough reaches the checklist itself. It also starts folded on smaller screens and when the Resume prompt appears, keeping the meter and lesson controls accessible.

Fixed

The checklist remains movable and expandable outside the tutorial, and stays on screen when expanded after dragging. Tutorial highlights now point to the installed input and output modules.

v3.12

Level 5 supply fuse rating revised

Improved

Level 5: fuse F1, which feeds both the rack power supply and the 24 V field supply, is now shown as a 4 A time-delay fuse instead of 3 A, a provisional training selection: the two supplies are rated for about 2.9 A together. How one shared fuse coordinates with each maker’s own fuse statement and with switch-on inrush is still marked as unresolved on the fuse card.

v3.11

Level 8 rack layout restored

Fixed

Level 8: the installed ControlLogix analog rack is drawn at its intended size again, with the controller face, the IF8 and OF8 terminal blocks, the PA72 terminals and the module labels placed on the rack, so its wiring terminals line up with the picture. The stylesheet that positions them had not reached the server.

v3.10

Live completion checklists, updated tutorials and pick actuator

Improved

Levels 1–9 now have a movable, collapsible completion checklist like Level 10. Items turn green from the existing lesson validators and machine proofs, with links back to unfinished work.

Improved

Separate Check Completion and final acceptance buttons are removed from the learner workflow. Existing safety, wiring, program and machine requirements remain enforced; completion saves automatically once they pass. Failed saves retain the work and offer an explicit retry.

Improved

Tutorials and completion instructions now explain the live checklist and automatic completion across all ten lessons. Levels 8–10 have lesson-specific guided tours.

Improved

The Level 10 pick-and-place head has a visible pneumatic cylinder, sliding carriage and telescoping actuator rod. They follow the actual pick/transfer/place motion and hold position on Stop.

v3.09

Working pick-and-place and guided reject chute

Improved

The supplied Pick_Place controller routine now executes using cylinder end-position and vacuum feedback. It picks each bottle from the tray, lifts, transfers, lowers, releases, and returns. Bottles enter the conveyor only after placement.

Improved

Start and Stop govern station motion; vacuum remains held during a normal stop. Missing feedback times out the station and stops its run command. The checklist production check also requires five confirmed placements.

Fixed

Rejected bottles follow the chute surface to its lip, then drop behind the bin front instead of passing through the conveyor or chute.

v3.08

Rejected bottles follow the chute

Fixed

Rejected bottles transfer onto the chute, follow its slope to the lip, then drop into the bin. Separate reject and bin-front layers prevent bottles disappearing through the conveyor or showing through the bin.

v3.07

Capper actuator and inspection sensor indicator

Improved

The inspection sensor has a green power LED and a yellow output LED. Yellow and the PLC PE_InspectPosition input share the same bottle-detection state; both LEDs go dark when sensor power is removed.

Fixed

The capping head now has a visible telescoping actuator rod. Head and rod extend, dwell, and retract together during capping and hold position when stopped.

v3.06

Direct HMI start and realistic bottles

Improved

Realistic transparent bottle and blue cap images replace the drawn bottles. Liquid level and cap appearance follow the fill and cap sequence.

Fixed

Belt motion uses the same travel distance as freely moving bottles, including speed changes and stops. Bottles held at stations remain queued with a gap.

Improved

Removed Enable HMI. Pressing the configured START button checks readiness, reconnects the unchanged downloaded program when needed, and starts the machine. Unfinished requirements still block operation with a clear explanation. Mode and speed can be selected before starting.

v3.05

Level 10 completion checklist and bottle spacing

Improved

A realistic machinery image forms the production-line background and foreground rail. Separate bottle, liquid, belt and capper layers follow the existing controller simulation. The pick-and-place station is labeled standby.

Fixed

Bottles queue with a minimum gap at the filling station and downstream stations, including the pressure upset, instead of overlapping.

Improved

A movable, minimizable checklist tracks verified lesson requirements and links to each section. Green items reflect passed checks, not visited sections.

Improved

The separate Run Acceptance Test button is removed. Enable HMI checks the downloaded PLC program; operating the machine verifies the production batch and fill-pressure recovery automatically. Completing all requirements records the lesson, while HMI operation continues.

v3.04

Level 10 starts with the Operator role

Improved

The Level 10 HMI defaults to Operator, including resumed projects previously saved as Viewer. Viewer is removed from Level 10 runtime role selectors. Command permissions and safety requirements remain enforced.

v3.03

Separate Level 10 operation from acceptance

Improved

Enable HMI starts an operator session without rerunning acceptance. Existing commissioning and safety requirements remain enforced. A matching saved download can reconnect without rebuilding the program; a fresh Start is still required.

Fixed

Completing Level 10 retains the machine build and saves the PLC/HMI project instead of clearing it. Resume restores the saved project, including its downloaded program, while machine energy remains under the existing restoration procedure.

v3.02

Continuous Level 10 HMI operation after acceptance

Fixed

Completing the witnessed batch no longer freezes the machine. The controller keeps scanning and additional batches run under HMI control. Stop pauses production and Start resumes it, with session counters accumulating. The first acceptance result is recorded once and later operator practice does not overwrite it.

v3.01

Level 10 PanelView machine operator terminal

Improved

A PanelView Plus 7 operator terminal sits directly above the production animation. Its displays, object positions and tag connections come from the learner’s HMI Studio project.

Improved

Acceptance prepares the cell and waits for the operator’s configured Start request. Stop, mode, speed entry, fault reset and acknowledge requests use the controller connection and HMI role permissions; machine values and counters return to the display. Safety reset remains hardwired.

v3.00

Level 10 panel fit and production-line animation

Improved

The witnessed run shows a detailed conveyor, filling station, capper, inspection sensor and reject chute, with bottle fill, belt motion and station activity following the existing production simulation.

Fixed

The PLC rack fits within its panel instead of widening every device row. Right-hand terminal strips remain within the panel, with devices arranged in additional rows as needed rather than adding a horizontal scrollbar.

v2.99

Movable Level 3 wiring guide

Improved

The complete Level 3 wiring guide opens beside the panel instead of below it. Learners can drag it, move it with arrow keys, reset its position or close it while retaining access to the panel.

v2.98

Accurate Level 2 meter introduction

Fixed

The service call identifies the meter as simulated and explains that readings depend on circuit state and probe locations, replacing the misleading claim that every terminal is live.

v2.97

Distinct Level 5 program and simulated guard controls

Improved

Sequence permissives are labeled as required program conditions. The simulated guard control separately explains checked/closed and unchecked/open behavior, avoiding two controls with the same Guard closed label.

v2.96

Readable Level 3 logic-check feedback

Improved

Check Logic separates expected and observed behavior from the detailed failure trace. Learners can expand the diagnosis and reference program when needed. Instruction-destination errors and incomplete checks remain explicit.

v2.95

Level 10 acceptance links to unfinished steps

Fixed

Acceptance prerequisites use the current lesson step headings instead of outdated section numbers. Each unfinished step links directly to its section and moves keyboard focus to its heading.

v2.94

Visible Level 9 HMI object controls

Improved

The HMI editor includes Properties and Delete Object toolbar buttons. Select an object to enable them; they stay disabled during HMI testing. Existing shortcuts and undo behavior are retained.

v2.93

Level 8 loop demonstration guidance

Improved

The analog lesson explains the setpoint hold criterion, high/low alarm demonstration, transmitter-fault recovery and when setup changes clear recorded demonstrations. The loop-power control is distinguished from main-disconnect isolation.

v2.92

Enlarge the Level 4 motor nameplate

Improved

Motor Nameplate Data includes an Enlarge Nameplate button. The plate expands within the page for reading and returns to its normal size without clearing entered ratings.

v2.91

Readable Level 6 engineering work order

Improved

The inspection-conveyor work order groups running, safety recovery, inspection and commissioning requirements into readable sections. Full terminal and PLC-tag details remain available in an expandable reference. Lesson checks and grading are unchanged.

v2.90

Level 7 wiring guidance and browsable hints

Fixed

Wiring hints identify both IB16 input commons, the OB16E field supply terminals and ControlLogix controller port 1. The GND-0 tooltip correctly names the TB3 zero-volt strip.

Improved

Task-specific hint buttons provide Previous and Next controls with a hint count. Closing and reopening a hint retains the current hint.

v2.89

Consistent component thumbnail sizes

Fixed

PLC and I/O images in Levels 6 and 7 now use the same compact thumbnail size as the other components.

v2.88

PLC hardware pictures in Component Selection

Improved

Levels 6 and 7 show the ControlLogix 5590 controller, 1756-IB16 input module and 1756-OB16E output module in Component Selection. Larger portrait thumbnails make the hardware easier to identify.

v2.87

Clearer I/O-to-program handoff in Levels 6 and 7

Improved

The ladder editor explains why field-device tags are unavailable before I/O assignment and identifies Start_Permit as an internal BOOL. A direct link returns to I/O Assignment, including from fullscreen, and the guidance updates as assignments change.

v2.86

Level 6 and 7 parallel branch alignment

Fixed

Parallel ladder branches retain aligned upper and lower paths when delete controls are present. Branch rails stay within their rung, and whole-branch removal is clearly separated from individual contact removal.

v2.85

Level 6 and 7 ladder instruction deletion

Fixed

Instruction selection keeps keyboard focus so Delete works. Visible removal buttons are provided for contacts, coils and branches, and Undo restores deleted items.

Fixed

Deleted coils no longer reappear during redraw or resume. Removing the last contact from a parallel path keeps the surviving path in series. Editing remains locked in RUN.

v2.84

Consistent ControlsTrainer 5000 editors for Levels 6 and 7

Fixed

Levels 6 and 7 now match the established ControlsTrainer 5000 dark editor layout, with an instruction toolbar, Controller Organizer, readable ladder branches and a live Program Tags sidebar.

Improved

The editors support undo/redo, copy/paste, drag-and-drop instructions, tag verification, zoom and scrollable fullscreen. RUN locks editing. Existing lesson programs, saved work, PLC execution and acceptance grading are retained.

v2.83

ControlsTrainer 5000 editors and meter practice

Improved

Levels 6 and 7 now use a ControlsTrainer 5000 workspace with Controller Organizer, zoom and scrollable fullscreen editing. Existing lesson programs, RUN controls and grading are retained.

Improved

Level 2 includes optional damaged-meter practice. Disconnect the probes and dock the instrument before replacing it, then prove the replacement on the known live source. A failed or unproven meter cannot earn measurement credit, and its condition persists in saved work.

Fixed

Level 10 separates the motor-protection and pump-contactor rows to keep drive-panel wiring clear of device artwork.

v2.82

Level 10 ControlLogix 5590 rack and field connections

Improved

The production-cell lesson now shows its controller and four I/O modules installed in a seven-slot 1756-A7 chassis. The two IB16 modules, OB16E and IF8 use their physical terminal layouts.

Improved

Wiring checks require the input-group returns, both output-group supplies and returns, and the analog current-input jumper. Compatible saved work is retained with an upgrade notice explaining the six added connections.

v2.81

Level 4 installed ControlLogix drive-control rack

Improved

The drive lesson now uses an installed ControlLogix 5590 rack with local IB16, OB16E and OF8 modules. Physical terminals, wiring hints and PLC addresses match the rack. The PA72 uses a separate factory AC branch.

Fixed

The analog speed reference uses the OF8 voltage-output and return terminals, with a separate shield clamp. Controller PROGRAM mode drops the remote run command; returning to RUN requires a new Start. Compatible saved wiring is retained, with counts for retired connections.

v2.80

Level 2 terminal strips and DC meter targets

Fixed

Power-supply terminal hover labels distinguish the 120 V AC input, 24 V DC output and protective earth.

Fixed

Both pairs of DC supply output screws now accept meter probes. The active AC/DC indicator is clearer, and AC mode explains when DC is present instead of implying the supply output is dead.

Fixed

The XT neutral and X1T fused-control terminal blocks now show complete right-hand edges without fragments of another block. Meter targets and wire endpoints align with the visible terminal rings.

v2.79

Level 8 ControlLogix analog rack

Improved

Analog Process Control now uses a ControlLogix 5590 controller, with 1756-IF8 and 1756-OF8 terminal diagrams installed on the rack. The PA72 has a factory AC branch; the separate 24 V supply feeds the field loop.

Fixed

The current-input loop requires its iRTN-to-RTN jumper. A broken loop produces a transmitter fault. The shield drain is shown separately from the signal terminals, and compatible saved wiring is retained with an upgrade notice.

v2.78

Level 7 installed ControlLogix rack and input commons

Improved

The Technician Challenge uses an installed ControlLogix 5590 rack with 1756-IB16 and 1756-OB16E modules, a PA72 AC rack supply and updated control-power artwork. Physical terminal positions and PLC addresses match the new modules.

Improved

The overload input IN8 now requires its own group’s GND-1 return to the 0 V strip. The wiring schedule, checks and input model distinguish it from GND-0. Saved work is retained where compatible and explains the additional connection.

v2.77

Level 6 ControlLogix 5590 panel

Improved

The inspection-conveyor lesson now uses an installed ControlLogix 5590 rack with 1756-IB16 inputs and 1756-OB16E outputs. The rack has its own PA72 AC supply; field wiring uses the modules’ physical common and supply terminals. The transformer and its fuse labels have been updated for the added rack load.

Improved

Existing compatible signal wiring and learner programs are retained. Saved I/O addresses are mapped to the new modules, and the lesson explains the input-common relocation. Restored progress requires fresh commissioning and safety-test proof.

v2.76

Level 5 installed ControlLogix 5590 rack

Improved

Level 5 now uses a ControlLogix 5590 controller with local 1756-IB16 and 1756-OB16E modules. Wiring targets sit on the installed modules, with matching terminal labels and controller I/O addresses. Earlier saved wiring is mapped where compatible, with a notice for removed connections.

Improved

A wired output-supply monitor and defined load assembly report supply loss to the sequence controller. Power restoration, repaired feedback and output-fuse reset keep motion inhibited until recovery checks and deliberate RESET and HOME actions. The lesson identifies its timing and diagnostic simulation limits.

v2.75

Clearer training dashboard and lesson guidance

Improved

My Training has a smaller welcome heading and more compact banner. Level 2 uses the shared Tutorial button style, with tour numbering distinct from lesson steps. Its unsupported capacitance setting now explains that no measurement is simulated.

Fixed

Level 10 guidance now names the current isolation, safety-system and PLC steps. Passing its diagnostic checks no longer implies that all commissioning requirements have passed.

v2.74

Numbered learning paths for Levels 3–10

Improved

Levels 3–10 now use large STEP headings, a lesson-path overview and links to the next section, following the presentation used in Levels 1 and 2. Each path follows the lesson’s own wiring, programming, commissioning or HMI workflow.

Improved

Energy-control stations have their own visible step before field wiring. The inspection-conveyor and technician-challenge lessons place PLC programming before HMI testing. Existing safety checks, grading requirements and saved progress are unchanged.

v2.73

Level 2 panel space and larger conveyor

Improved

On wide screens, the Level 2 meter and its instructions sit in the left page margin, giving the control panel the full lesson width. Shared devices and terminal targets retain their Level 1 reference sizes. Smaller windows keep the meter alongside the scrollable panel, and the instrument can still be floated and docked. The Step 5 conveyor animation is larger while preserving its proportions.

v2.72

Level 2 meter layout and compact actions

Improved

Level 2 verification, repair, lockout-removal and completion actions now use compact buttons instead of stretching across their sections. The meter sits beside the panel on desktop without reducing device sizes, with a bright green Move meter handle and shorter instructions. Keyboard focus, disabled states and safety requirements are preserved.

v2.71

Level 2 device sizes aligned with Level 1

Improved

Level 2 now uses Level 1 as its device-size reference: larger disconnect, starter, power supply, terminal strips, pushbuttons and motor, with consistently sized probe targets. The controller rack retains its 850-pixel display width.

Improved

Start and Stop pushbuttons and the 24 V supply now use the same training artwork and terminal registration as Level 1. The panel rows and factory wiring have been rearranged to make room. On smaller screens, the panel scrolls horizontally instead of shrinking the equipment.

v2.70

More room for the Level 2 control panel

Improved

The docked Level 2 meter now matches the floating meter size, sitting beside the panel when space allows. When both do not fit, the meter moves above the panel instead of squeezing the devices smaller. The rack retains its Level 1 maximum size; meter functions and probe behavior are unchanged.

v2.69

A consistent, centered workspace for Levels 1 and 2

Improved

Levels 1 and 2 now use a centered workspace with a 1,450-pixel maximum width, matching the layout used by most later lessons. Wide monitors show comfortable side margins, while smaller screens use the available width.

Improved

The Level 2 controller rack is capped at the same maximum display width as Level 1. Its HMI and conveyor retain their smaller display sizes, and the diagnostic tabs and safety-verification workflow are preserved.

v2.68

Clearer lesson steps, diagnostic views and safety verification

Improved

Levels 1 and 2 now use large numbered step headings and short task instructions. Level 1 leads from lockout and field wiring through the supplied PLC program, I/O review, restoration and testing, then completion. Level 2 follows the troubleshooting process from the service call to diagnosis, repair and testing.

Improved

Level 1 wiring guidance opens in a movable guide, with clearer terminal-to-terminal instructions. Guidance after wiring identifies the next steps for clearing tools and the area before removing lockout.

Improved

Levels 1 and 2 have clearer Studio-style ladder displays. Level 1 retains its supplied program; Level 2 remains a read-only diagnostic view.

Improved

Level 2 groups HMI and I/O status with PLC Ladder Logic in two diagnostic tabs. The lockout station and voltage-verification checklist sit above the control panel and meter, with links between the work areas.

Improved

Level 2 voltage verification shows the next measurement, individual recorded and pending readings, and progress toward confirmation. The existing required measurements and repair interlocks remain in place. The lesson explicitly identifies the disconnect LINE terminals as energized while the disconnect is open.

Improved

The Level 2 meter can be moved beside the work and docked again. Probe leads stay above the instrument, and probes can be placed on terminal rings for voltage and resistance checks.

Improved

Levels 1, 2 and 3 show the ControlLogix input and output terminal blocks on their modules in the rack. Level 1 also has clearer device sizing and a corrected terminal-strip image. Equipment images remain training illustrations.

Fixed

Level 2 HMI and conveyor displays have bounded sizes within the wider lesson sections, and the lockout station is larger. Changing sections no longer leaves parked meter probes over the instructions when the meter is offscreen.

v2.67

New-hire assessments: from candidate screening to employee records

New

Company plans now include new-hire trade-knowledge assessments. Department Heads and Supervisors choose topics for the role: electrical, troubleshooting, pneumatics, PLCs, HMIs, VFDs and analog signals. Safety questions are always included.

New

Managers enter the candidate name, position and assessment date, then generate a single-use access code. Candidates complete the assessment on a desktop or laptop without an email account or a ControlsTrainer login. Reusable module selections make repeat hiring easier.

New

Reports show scores by module, safety-critical misses and suggested practice lessons, with a printable view for follow-up. Results support interviews and supervised practical checks; they are not a certification or an automatic hiring decision.

New

If a candidate becomes an employee, a manager can link the completed assessment to their company record. The original candidate details, answers and scores are preserved, and authorized managers can review the assessment history later.

v2.66

Level 3: Rebuilt on the ControlLogix 5590

Development build v7.51

New

Level 3: the pump station now runs on the Allen-Bradley ControlLogix 5590 as well: a 1756-L902TS controller in a 1756-A4 rack, with a 1756-IB16 input module and a 1756-OB16E output module. Their terminal blocks are drawn enlarged in a row under the controller, one conductor per terminal. The rack has its own power supply, so a short on the 24 V side drops the inputs and the output but not the controller, and after a power loss the controller starts up again before its program runs.

New

Level 3: the PLC now reads the pump contactor through a front auxiliary contact block made for low-current circuits (100-FCB11), and your program uses it. The required logic adds a confirmed-run rule and a 150 ms pickup check written with the new TON timer instruction: if the contactor drops out by itself after a confirmed run, or does not pull in within 150 ms of a start, the program takes the restart permission away, so a pump left in HAND or AUTO never starts by itself when the output’s supply comes back. Only the selector at OFF gives the permission back.

Improved

Level 3: Check Logic and Check Completion now run your program scan by scan, every 10 ms, through every reachable combination of the selector, the level, the E-Stop, the overload, broken status wires, the output’s supply, the 24 V supply and power loss. Any program that behaves like the required one passes; the check takes a second or two.

Improved

Level 3: the control transformer is 350 VA with matching fuses, the controller rack is grounded on its own bolts of the ground bar, and an output wired onto a short trips the output module’s electronic fuse; resetting the fuse never starts the pump. Open items stay marked on the drawing.

Fixed

Level 3: saved sessions carry over. Your wiring moves to the matching points on the new terminal blocks, anything that has no place on the new panel is listed when you resume, and the note reminds you to wire the new aux block. Your program is kept as you wrote it.

Improved

The Why ControlsTrainer page’s Level 3 row now describes the restart rules of the accepted PLC solution. The MicroLogix 1400 remains on Level 5.

v2.65

Level 1: Rebuilt on the ControlLogix 5590

Development build v7.50

New

Level 1: the motor-starter panel now uses the same Allen-Bradley ControlLogix 5590 as Level 2: a 1756-L902TS controller in a 1756-A4 rack, with a 1756-IB16 input module and a 1756-OB16E output module. You land the control wiring on the modules’ terminal blocks, drawn enlarged in the bottom row, one conductor per screw. The rack has its own power supply, so a short on the 24 V side drops the field inputs and the output but not the controller, and after a power loss the controller starts up again before its program runs.

Improved

Level 1 comes with its PLC program loaded, so wiring and running the panel needs no programming. Its restart permission now also drops when Stop is pressed or when the contactor drops out by itself after a confirmed run (say its output lost power): a Start held through a Stop, an E-Stop release, an overload reset, a power return or a lost output supply never restarts the motor. A program you wrote yourself is kept; Check Completion tells you if it misses this, and Load supplied program puts the supplied one back.

Improved

Level 1: the PLC now reads the contactor through a front auxiliary contact block made for low-current circuits (100-FCB11), the control transformer is 350 VA with matching fuses, and the controller rack is grounded to its own ground bus as Rockwell’s chassis instructions require. Open items stay marked on the drawing.

Improved

Level 1: an output wired onto a short now trips the output module’s electronic fuse, as on a real ControlLogix. Fix the short, then reset the fuse on the controller card; resetting it never starts the motor.

Fixed

Level 1: saved sessions carry over. Your wiring moves to the matching points on the new terminal blocks, and anything that has no place on the new panel is listed when you resume.

Improved

The About and Why ControlsTrainer pages now name the ControlLogix 5590 and its 1756 I/O modules alongside the MicroLogix 1400, which Levels 3 and 5 still use.

v2.64

Level 2: Rebuilt on the ControlLogix 5590

Development build v7.49

New

Level 2: the conveyor panel now runs on an Allen-Bradley ControlLogix 5590 (1756-L902TS) in a 1756-A4 rack, with its own 1756-PA72 power supply, a 1756-IB16 input module and a 1756-OB16E output module. The field wiring lands on the modules’ terminal blocks, drawn enlarged, and the panel is laid out in rows: power, then control power and the controller rack, then the terminal strips, with the door and field devices off the backplate.

New

Level 2: the controller’s program is shown rung by rung with live power flow. It never restarts the motor on its own: after a stop, an E-Stop release, a RESET or power coming back, someone must press Start again. A low-level auxiliary contact block on motor starter M1 is now wired to an input, so the program sees whether M1 really pulled in: a start not confirmed within 150 ms is dropped, and losing that confirmation while running stops the line at once and latches a fault.

Improved

Level 2: the service call now follows safe practice for a tripped overload. You try the overload’s own reset after it has cooled, rule out the motor circuit, then lock out, verify zero energy and use the ohmmeter to find the open contact before you replace anything. Ohmmeter readings count only after zero energy is verified, and they now follow every path through the dead circuit, windings included.

Fixed

Level 2: a repair is accepted only while your own lock and tag are on the open disconnect, and removing any part of the lockout cancels the zero-energy verification. RESET FAULT clears a latched fault but never starts the motor, and the success message appears only after the server has recorded your pass.

Improved

Level 2: control transformer T1 is now 350 VA (1497A-A8-M6-0-N), with fuses F5, F6 and F1 at Rockwell’s table maximums for it, and the 24 V supply output gets its own fuse, F7. The supplies’ switch-on inrush check is shown on the drawing as an open item, not claimed.

Improved

The Safety Practices & Standards page now shows a picture from the lessons beside its electrical, guarding and hazard-review sections.

v2.63

Level 5: The PLC Now Sees the Stop Chain

Development build v7.48

Fixed

Level 5: the PLC now watches the hard-wired stop chain on its own input, Stop_Chain_OK (IN9), wired from TB3 J1. On the scan it reads the chain open, the PLC drops every command, the supply enable included, and latches the stop, so releasing the E-Stop can no longer let a running cycle carry on. Recovery is RESET, then HOME. Before, the PLC learned of an E-Stop only once the supply pressure had fallen, about 1.7 seconds later.

Fixed

Level 5: RESET, HOME and CYCLE START now go by the PLC’s inputs (Stop_Chain_OK and Guard_Closed) instead of contacts the PLC cannot see, and opening the guard drops the supply enable too.

Fixed

Level 5: the guided tour now describes the current stop chain (TB1 → E-Stop 1–2 → guard channel 2 → TB3 J1 → the output supplies), and the two KRP feedback sensors’ cordsets are listed as M8, as SICK’s data sheet shows.

Improved

The Safety Practices & Standards page now covers all ten levels and more of the standards behind them, including NFPA 79, NFPA 70, UL 508A, ISO 4414, ISO 14118, ISO 14119, ISO 13850, ISO 12100 and ISA-18.2, each linked to its publisher.

v2.62

Level 1: Check Completion Needs a Current Motor Run

Development build v7.47

Fixed

Level 1: Check Completion only counts a motor run on the PLC wiring made after the last lockout, short or protection trip, overload trip, wiring change and change between PROGRAM and RUN. It also waits while the panel is switched off, a protection is open, the overload is tripped or the E-Stop is pressed, and it says what to do. This is the same rule as on Level 3.

v2.61

Level 3: The Real MicroLogix 1400 and a Restart Permission

Development build v7.46

Fixed

Level 3: the overload’s 95–96 contact now opens the contactor coil circuit itself (OUT2 → E-Stop 11–12 → 95–96 → coil A1), so a trip stops the pump whatever the PLC program does. Its 97–98 contact reports the trip to the PLC as Motor_OL_Trip on IN4.

Fixed

Level 3: restarting is now up to your program instead of a hidden rule. Build the restart permission (Selector_Off and Run_Permit) so that releasing the E-Stop, resetting the overload or restoring power does not restart the pump until the selector has been turned to OFF. The permission also drops if HAND and AUTO are both on, which only a wiring fault can cause. The E-Stop now has two contact blocks: 11–12 in the coil circuit and 21–22 reporting to IN5.

Improved

Level 3: the PLC is now the real Allen-Bradley MicroLogix 1400 (1766-L32BXB) with all of its terminals, as on Level 1. Wire the inputs IN0–IN5, land the commons COM 0 and COM 1 on 0 V, and drive the coil from the FET output OUT2, which needs VDC 2 and COM 2. The controller’s LCD shows its I/O status.

Improved

Level 3: the 24 V supply is now a 1606-XLP72E, a listed NEC Class 2 supply, and the PE ground bar moved down to the terminal-strip row.

Fixed

Level 3: the simulator no longer switches the pump off when your ladder does not match a fixed pattern. Your program runs exactly as written, and Check Completion compares it with the required behavior in every situation it can reach: the selector, the floats, the E-Stop, the overload, broken status wires, a power loss and a change between PROGRAM and RUN. If your program behaves differently, the check shows the shortest sequence of events that proves it.

Fixed

Level 3: shorts now behave as on Level 1. A short on the 24 V supply switches the controller off too, and a short on the 120 V or 480 V side opens the protection in its path until you lock out and restore power. The wiring check also names shorts that only appear when a float, the selector, the output or the contactor closes.

Improved

Level 3: the hardwired float control still works on the board, but it no longer completes the level, because it has no restart permission. The PLC wiring is the accepted solution.

Fixed

Level 3: Check Completion only counts a fill to the HIGH float made after the last lockout, short or protection trip, overload trip, wiring change and change between PROGRAM and RUN. It also waits while the panel is switched off, a protection is open, the overload is tripped or the E-Stop is pressed, and it says what to do.

Improved

Level 3: the HAND/OFF/AUTO selector is now an Allen-Bradley 800F three-position selector with two contact blocks, in a new training illustration of its front and its rear blocks. The float switches name their part numbers (Gems LS-7 Type 5 and ProSense FLS-HL-400) and their contact ratings, and the page lists the limits of the restart permission and the open engineering items.

Improved

Level 3: saved work is updated when you resume. Unchanged conductors are kept, the ones whose job changed are removed and counted, and the overload contact in your program is converted.

New

New page: Insurance & Risk Management. It shows sourced figures on workplace injuries and their costs, from the U.S. Bureau of Labor Statistics, the National Safety Council and the Liberty Mutual Workplace Safety Index, and how Levels 1, 2 and 5 relate to each chart.

Improved

The Safety Practices & Standards page is rewritten. It connects each practice to the level where you do it: lockout with meter checks on Levels 1 and 2, stored air on Level 5, reset and restart on Level 6, drive setup and Safe Torque Off on Level 4, alarms on Level 9 and the hazard review on Level 10, with links to the official references.

v2.60

Level 1: The Real MicroLogix 1400 and a Restart Permission

Development build v7.45

Fixed

Level 1: the overload’s 95–96 contact now opens the contactor coil circuit itself (OUT2 → E-Stop 11–12 → 95–96 → coil A1), so a trip stops the motor whatever the PLC program does. Its 97–98 contact reports the trip to the PLC as Motor_OL_Trip on IN2.

Fixed

Level 1: a wire landed on protective earth is no longer accepted as a 0 V return. It is shown as a wiring fault, and the coil does not run through it. The incoming feeder’s equipment grounding conductor is now drawn to the TB-PE terminals.

Fixed

Level 1: restarting is now up to your program instead of a hidden rule. Add the restart permission rung (Start_Permit) so that a Start held while the E-Stop is released, the overload is reset or the power comes back does not start the motor. The E-Stop now has two contact blocks: 11–12 in the coil circuit and 21–22 reporting to IN4. Hold the Start button on its picture to try it.

Improved

Level 1: the PLC is now shown as the real Allen-Bradley MicroLogix 1400 (1766-L32BXB) with all of its terminals, in place of a simplified picture. Wire the inputs IN0–IN4 and land each input group’s common (COM 0 and COM 1) on 0 V. The contactor coil is driven by the FET output OUT2, which needs VDC 2 on +24 V and COM 2 on 0 V. The controller’s LCD shows its I/O status, with a solid box for each energized input or output.

Improved

Level 1: the 24 V supply is now a 1606-XLP72E, a listed NEC Class 2 supply, because the MicroLogix 1400 and its inputs and outputs call for one.

Fixed

Level 1: a short on the 24 V supply now switches the controller off too, including a short made by pressing a button or by the PLC’s own output. A wire from +24 V to a PE terminal counts as the same short, because 0 V is bonded to PE. A short made by the output or by the contactor’s own contact keeps the supply off until you rewire or switch the panel off and on.

Fixed

Level 1: a short on the 120 V or 480 V side now opens the protection in its path. On the motor’s branch, fuses F2–F4 open and only the motor loses power. Anywhere else, the controller loses power too. The protection stays open until you lock out and restore power. Two swapped motor leads now run the motor backward instead of being reported as a short.

Fixed

The lockout panels no longer say that nothing starts by itself when the power is restored. What a machine does then depends on its wiring and its program; on Level 1, a held Start restarts the motor at once unless the program has the restart permission.

Improved

Level 1: the panel is laid out in rows. Power is at the top; control power and the PLC in the middle; terminal strips TB1, TB2 and TB-PE at the bottom. The door pushbuttons and the motor are off the backplate, each behind a dashed line.

Fixed

Level 1: Check Completion now runs your whole program on the same scanner as the panel, through start and seal-in, Stop, the E-Stop and the overload with Start held, a power loss and broken status wires.

Improved

Level 1: a panel beside the ladder explains how a normally open or normally closed device becomes an input bit and when to use XIC or XIO, with a table for Stop, the overload and the E-Stop.

Improved

Level 1: the hardwired 3-wire string still works on the board, but it no longer completes the level, because it has no restart permission. The PLC wiring is the accepted solution.

Fixed

Level 1: the panel no longer claims a 5 kA short-circuit current rating or a Type 12 enclosure. Both still need an engineering evaluation and are listed as open items.

Improved

Level 1: the Start, Stop and E-Stop pictures now show their contact blocks, with the connection rings on the real screws. Saved work is updated when you resume: unchanged conductors are kept, the ones whose job changed are removed and counted, and the overload contact in your program is converted.

v2.59

Level 7: Laid Out Like a Real Panel

Development build v7.44

Fixed

Level 7: the panel is now laid out like Levels 1 to 3 and Level 6. Power is at the top: the main disconnect, distribution block, motor fuses and motor starter. The control transformer with its fuses, the grounded-conductor terminals and the 24 V supply come next, then the PLC rack and the safety relay, with the terminal strips at the bottom. The HMI, E-Stop and pushbuttons are shown on the door, and the guard switch, sensors and turret motor out in the field, each area behind a dashed line.

Fixed

Level 7: the motor branch is now protected by three 6 A time-delay Class CC fuses (F2–F4). The motor circuit protector shown before carried a catalog number that does not exist, and its picture was a toggle breaker. The fuse size follows NEC Table 430.250 and 430.52 for the lesson’s 2 hp, 460 V motor. The check against the motor’s starting duty, the coordination with the starter and the panel’s short-circuit rating are listed as open items.

Fixed

Level 7: the motor starter is now the same Schneider TeSys Deca LC1D09BD contactor and LRD08 overload as on Level 6, shown as a training illustration drawn to Schneider’s terminal arrangement. The power path is drawn from the disconnect through the fuses, the contactor and the overload to the motor, along with the motor’s ground and the feeder’s equipment grounding conductor.

Fixed

Level 7: the overload’s 95-96 contact still opens the coil circuit on a trip, and its 97-98 contact now reports the trip to the PLC as Motor_OL_Trip on IN8. The contactor’s 13-14 contact reports that it has really pulled in, as M1_Aux on IN7, and the run rung now seals in through M1_Aux instead of its own output. Try the new Trip Overload button, the blue RESET on the starter, and its red STOP, which opens 95-96 while you hold it.

Fixed

Level 7: a safety RESET now only prepares the machine. The program gets the same restart permission as on Level 6, an internal BOOL called Start_Permit, so a Cycle Start held through a guard, E-Stop or power recovery does nothing at RESET: release it, then press it again. The ordinary stops have no such interlock: a Cycle Start still held when the Stop button, the overload’s red STOP or an overload reset clears starts the turret.

Improved

Level 7: PLC addresses now use the rack’s real module tags, such as Local:1:I.Pt00.Data for the input module in slot 1 and Local:2:O.Pt00.Data for the output module in slot 2, instead of MicroLogix-style I:0/0 addresses. You now also land the output module’s LA0− (marked COM in its picture) on 0 V, and the wire schedule is revised to Rev F with the five new conductors.

Fixed

Level 7: Run Tests now runs your whole program on the same scanner as the live turret, through start and seal-in, Stop, guard and E-Stop recovery, an overload trip, the overload’s red STOP, the 180° stop, the part check and a power loss. Each I/O assignment now has to match the module point its device is wired to.

Improved

Level 7: the Stack Light and Interface Relay decoys were removed because their pictures and part numbers were not accurate.

Fixed

Level 7: the Cycle Start, Stop and Safety Reset pictures no longer show their connection rings on empty space below the button. Each picture now has a labeled rear view of the button’s contact block, N.O. 13–14 or N.C. 21–22, and you wire to the screws on that block. The pictures are training illustrations, not specific catalog parts.

Improved

Level 7: saved work is updated when you resume. Addresses are converted, the fuses and the motor replace the old breaker in your selection, and conductors on terminals that no longer exist are removed. A run rung that seals in on its own output is kept as you wrote it, with a note on the changes it needs, and the safety circuit has to be verified again.

v2.58

Level 6: Laid Out Like a Real Panel

Development build v7.43

Fixed

Level 6: the panel is now laid out like Levels 1 to 3, in the order a real panel is built. Power is at the top: the main disconnect, distribution block, motor fuses, motor starter, and the control transformer with its fuses. The control power, the safety relay, the PLC rack and the ground bar fill the middle, with the terminal strips at the bottom. The E-Stop, pushbuttons, pilot lights and HMI are shown on the door, and the guard switch, sensors, motor and reject solenoid out in the field.

Fixed

Level 6: the motor starter is now a Schneider TeSys Deca LC1D09BD contactor with an LRD08 overload mounted underneath, shown as a training illustration drawn to Schneider’s terminal arrangement. All three motor phases pass through the overload, and the contactor’s mirror contact (21-22) monitors the safety relay’s reset.

Fixed

Level 6: the overload now protects the motor directly. Its N.C. contact (95-96) is wired in the contactor coil circuit, so a trip removes coil power whatever the PLC does. Its N.O. contact (97-98) reports the trip to the PLC as Motor_OL_Trip, which the run rung checks with an XIO instruction. Try it with the new Trip Overload button: the blue RESET on the starter resets the overload, and with Start released the conveyor stays stopped until you press Start.

Fixed

Level 6: the contactor now tells the PLC when it has really pulled in. Its N.O. auxiliary contact (13-14) is wired to input IN7 as M1_Aux, and the run rung seals in through M1_Aux instead of its own output. Hold the red STOP on the starter to open the overload’s 95-96 by hand: the contactor drops out, and the conveyor stays stopped when you let go.

Fixed

Level 6: a safety RESET now only prepares the machine. The program gets a restart permission, an internal BOOL called Start_Permit, that sets only while Start is released and the safety relay is healthy and clears on every relay trip. A Start held through a guard or E-Stop stop does nothing at RESET: release Start, then press it again. The ordinary stops have no such interlock: a Start held through the overload’s red STOP or an overload reset starts the conveyor when that stop clears.

Improved

Level 6: the conveyor’s start/stop control must now be built in the PLC. The hardwired 3-wire string is no longer accepted on this level, because it has no restart permission after a safety RESET (Levels 1 and 2 still teach hardwired control). Saved hardwired wiring is kept, with a note to rewire it.

Fixed

Level 6: the 24 V supply now feeds TB1 (through fuse F7) and TB2 with factory wiring, and the controller’s MOD and SA+ power is factory-wired too. You now land the output module’s LA0− (marked COM in its picture) on 0 V, as Rockwell’s module requires: its outputs drive the contactor coil, the solenoid and the pilot lights only with both LA0+ and LA0− connected. A 24 V conductor landed on the ground bar is marked as a wiring fault.

Improved

Level 6: the panel nameplate gives training values, and a note lists what this drawing does not settle yet, such as the panel’s short-circuit current rating, fuse coordination, and corrected pictures for the PLC modules and the supply. Wiring saved on the old panel is cleared when you resume. Your hardware, I/O map and program are kept, and an old overload rung is converted to the new trip input. An old run rung that seals in on its own output is kept as you wrote it, with a note on changing its seal to M1_Aux.

v2.57

Level 5: Laid Out Like a Real Panel

Development build v7.42

Fixed

Level 5: the electrical panel is now laid out like Levels 1 to 3, in the order a real panel is built. The 120 V feed comes in at the top through a lockable main disconnect and a fuse (F1), with its neutral on its own white terminal and a copper ground bar. The 24 V supply, its output fuse (F7) and the PLC come next, and the terminal strips are at the bottom. The E-Stop is shown on the door, and the sensors, the guard switch and the valve coils out in the field.

Fixed

Level 5: the supply’s feeds to TB1 and TB2 are now factory wiring, with TB1 fed through fuse F7. A 24 V conductor landed on the ground bar or the neutral is marked as a wiring fault: protective earth carries fault current only, and the neutral belongs to the 120 V circuit. The panel nameplate gives training values and says that its short-circuit current rating and enclosure type are not calculated. Wiring saved on the old panel is cleared when you resume; your hardware, I/O, tubing and program are kept.

v2.56

Level 3: Laid Out Like a Real Panel

Development build v7.41

Fixed

Level 3: the panel is now laid out like Levels 1 and 2, in the order a real panel is built. Power is at the top: the main disconnect, distribution block, motor fuses, starter, transformer fuses and control transformer. Below it are the 24 V supply, the PLC and the ground bar, with the terminal strips at the bottom, where the field wiring enters. The HAND/OFF/AUTO selector and the E-Stop are shown on the door, and the float switches and the pump motor out in the field, instead of on the backplate.

Fixed

Level 3: the 24 V supply is now fed the way it is on Levels 1 and 2, through a fused control transformer, and its +24 V output has its own fuse (F7) ahead of the terminal strips, because the supply is not a Class 2 unit. The motor’s ground wire and the supply’s ground now land on a copper ground bar, where the 120 V and 24 V circuits are each bonded to ground at one point. The supply’s feeds to TB1 and TB2 are factory wiring, so you now land 15 control conductors instead of 17. A return landed on the ground bar is now marked as a wiring fault: protective earth carries fault current only. Wiring saved on the old panel is cleared when you resume; your program is kept.

Improved

Level 3: the panel nameplate now marks its values as training values and says that the short-circuit current rating and the enclosure type are not calculated for this drawing. A note lists what the drawing does not show yet, such as the E-Stop reset circuit and the PLC’s own power wiring.

Improved

Level 3: a device’s details (part number, rating and wiring notes) open in a card when you rest the pointer on it or tap its name, as on Level 1. The card never covers a terminal.

v2.55

Level 4: The PowerFlex 525’s Real Safety Faults

Development build v7.40

Fixed

Level 4: the drive now reacts to its Safe Torque Off inputs the way a real PowerFlex 525 does with its default settings. The E-Stop removes torque at once and also faults the drive (F059 Safety Open), so after releasing it you clear the fault with the PLC Fault Reset. Opening one channel for more than a second latches F111 Safety Hardware, which only a power cycle of the drive clears: use the new Q2 control. Nothing restarts on its own.

Improved

Level 4: four more drive parameters to set: t105 Safety Open En, t106 SafetyFlt RstCfg, A541 Auto Rstrt Tries and A543 Start At PowerUp. They decide how the drive handles an open safety input, and they make sure it never resets a fault and restarts, or starts at power-up, by itself.

Fixed

Level 4: the plant feeder is now marked 480Y/277 V. Rockwell lists the drive’s branch breaker (Allen-Bradley 140MT-C3E-B40) for this drive only on a 480Y/277 V solidly grounded wye supply, and the panel notes now say so. The simulated drive fault is named for what it is (F004 UnderVoltage), and a PLC logic choice no longer mentions a guard switch this machine does not have.

v2.54

Level 4: A Real Remote I/O Drop and PowerFlex 525 Panel

Development build v7.39

Fixed

Level 4: the drive panel is now built like a real one. The made-up controller, the generic drive terminal strip and the stand-alone Safe Torque Off box are gone. In their place: a remote I/O drop (a 5069-AENTR EtherNet/IP adapter with 5069-IB16, 5069-OB16 and 5069-OF8 modules; the CompactLogix controller sits in the main control panel), the real numbered control terminals of the Allen-Bradley PowerFlex 525, and the panel’s power section: the disconnect, the drive’s branch breaker, the 24 V supply with its fuses and its branch breaker, and the PE strip.

Fixed

Level 4: the drive’s status reaches the PLC through a real dry contact. +24 V feeds relay 1 at R2, and its normally open contact R1 lands on input 0 as Drive_Ready. Remove the feed or fault the drive, and the PLC sees the drive as not ready and drops the run command.

Improved

Level 4: one conductor per terminal. +24 V, 0 V and PE come from the bridged strips TB1, TB2 and PE, with one visible 0 V bond to PE. The panel is laid out like a real cabinet: power at the top, controls in the middle, terminal blocks at the bottom, the E-Stop on the door and the motor in the field. The 480 V wiring runs in its own wireways, away from the control and analog wiring. Right-click a conductor to remove it.

Improved

Level 4: the I/O map uses remote I/O tags (for example VFD_IO:2:O.Pt00.Data) and sets what the output modules do when the connection is lost; the drive parameters use the PowerFlex 525 names and settings (P046, P047, t062, t064, t065 and t076); and the PLC Fault Reset works through terminal 05. Saved progress keeps your entries; conductors saved on the old panel are cleared.

Improved

Level 4: new commissioning tests. Open each Safe Torque Off channel on its own, unplug the adapter’s Ethernet cable and trip the 24 V breaker: the drive must stop every time, and it never restarts on its own.

v2.53

Level 6: A Real 5069-IB16 Input Module and Its Module Tags

Development build v7.38

Fixed

Level 6: the input module is now a real Allen-Bradley 5069-IB16 (16 sinking inputs). The old ’5069-IB8’ is not a standard Compact 5000 module. As on the real hardware, the inputs have no common terminal of their own: they return through the controller’s SA power, so you land SA− (on the controller’s SA power RTB) on the 0 V bus.

Improved

Level 6: the I/O map uses module tags, as a CompactLogix does (for example Local:1:I.Pt00.Data for input 0 on the IB16 in slot 1), not MicroLogix addresses. Saved progress carries over.

v2.52

Level 3: Motor Power Now Runs Through the Overload

Development build v7.37

Fixed

Level 3: the pump motor’s three phases now pass through the overload relay, as on a real starter: incoming feed → motor branch fuses F2–F4 → contactor → overload 2/T1, 4/T2, 6/T3 → motor. Before, the drawing fed the motor straight from the contactor, so the overload could not protect it.

Improved

Level 3: the contactor and overload are now the real starter used on Levels 1 and 2 (a 100-C09EJ10 contactor with a 193-T1AB40 overload mounted underneath), and the motor branch has its Class CC fuses F2–F4. The control wiring you land is unchanged.

v2.51

Level 5: The Clamp-Released Input Gets Its Common

Development build v7.36

Fixed

Level 5: PLC input IN8 (clamp released) is in input group 2, but that group’s common, input COM 2, was never wired, so on a real MicroLogix 1400 the input could never turn on. Input COM 2 is now part of the required wiring and the automatic setup, on its own 0 V terminal.

Improved

Level 5: the simulator now reads each PLC input group only while its common is on 0 V (COM 0 for IN0–IN3, COM 1 for IN4–IN7, COM 2 for IN8–IN11). A missing common shows up as lost sensor feedback, as it would on the real machine.

v2.50

E-Stop Terminals on the Real Screws in Levels 4, 6, 7 and 10

Development build v7.35

Fixed

Levels 4, 6, 7 and 10: the E-Stop picture now shows its four terminals on the real screw heads of its two contact blocks, as on Level 2. The old picture drew the connection rings below the blocks, away from the screws; the terminals you click moved onto the screws too.

Improved

The E-Stop picture is now named a training illustration rather than a specific catalog part, and Level 10 no longer lists a catalog number for it.

v2.49

Level 2 Gets an E-Stop, and Its Real Buttons Work

Development build v7.34

Improved

Level 2 now has an emergency stop on the door, next to Start and Stop, as NFPA 79 calls for at an operator station. One of its two normally closed contacts is wired straight into the contactor coil circuit, so pressing it drops the motor with no PLC in the path. The other contact tells the PLC (input I:0/4), which drops the run command: releasing the E-Stop never restarts the conveyor. You must press Start again. (The E-Stop picture is a training illustration, not a specific catalog part.)

Improved

Level 2: the real buttons on the panel work, as on Level 1. Click the green Start and red Stop caps, and press the E-Stop mushroom (press again to twist it out). On a healthy overload, its own TEST button trips it and its red RESET button resets it. The service call’s failed overload still has to be locked out and replaced.

Improved

Level 2: the PanelView lists the new E-Stop input and names the E-Stop and a tripped overload on its status line.

v2.48

Level 1 Drawn Like a Real Panel, with Working Pushbuttons

Development build v7.33

Improved

Level 1 now looks like Level 2: device photos packed in full rows under dark nameplates. Power runs across the top (main disconnect, distribution block, motor fuses, starter, transformer fuses and T1), the control devices, PLC and ground bar fill the middle row, and the door pushbuttons and motor sit off the backplate below a dashed line.

Improved

Level 1: each device’s details (part number, rating, wiring notes) now appear in an info card when you rest the pointer on the device, or tap its name on a touch screen. The card opens only in a clear spot, never over a terminal or a button, and never blocks a click. The last device’s details also stay in a panel above the board.

Improved

Level 1: the real buttons work. Click the green Start and red Stop caps, press the E-Stop mushroom (press again to twist it out), and use the overload’s own TEST button to trip it and its red RESET button to reset it.

v2.47

Level 2: Nameplates, No Half-Empty Rows, and a Visible 0 V Bond

Development build v7.32

Improved

Level 2: device names now sit on dark nameplates, the same as Level 1.

Improved

Level 2: no more half-empty rows. The ground bar moved into the control row next to the PLC, and the door pushbuttons and the field motor are grouped under the dashed line.

Fixed

Level 2: the 24 V supply’s PE terminal is now its own protective-earth connection, separate from −V, as on the real Allen-Bradley 1606-XLP72E. The 0 V common is grounded at one visible point: a bonding jumper from TB2-3B to ground bar PE5.

v2.46

Level 2 Laid Out Like a Real Panel, with Its Control Transformer

Development build v7.31

Improved

Level 2: the panel is now laid out like a real control cabinet: power at the top (main disconnect, distribution block, motor fuses, starter M1, transformer fuses and transformer T1), control power and the PLC in the middle, and the ground bar at the bottom. The Start/Stop pushbuttons (door-mounted) and the conveyor motor (in the field) sit below a dashed line, off the backplate.

Fixed

Level 2: control transformer T1 is now drawn on the panel instead of described in a note. An Allen-Bradley 1492-PD3141 distribution block splits the disconnect’s load side between motor fuses F2 to F4 and the transformer primary fuses F5 and F6 (Bussmann FNQ-R 1.25 A, Rockwell’s maximum for this 250 VA transformer). X1 runs through control fuse F1; X2 is never fused, lands on white bridged terminals XT and is bonded to the ground bar at one point.

Improved

Level 2: every new terminal is a live test point. On the ohms range a locked-out transformer reads its windings (about 39 Ω across the primary, about 1.3 Ω across the secondary) instead of an open circuit, and X2 reads continuity to the ground bar through its bonding jumper. The motor branch wires are now numbered 101 to 109, and the transformer wires 110 to 113.

v2.45

Level 1 Laid Out Like a Real Control Panel

Development build v7.30

Improved

Level 1: the panel is now laid out like a real control cabinet, top to bottom: incoming power (the main disconnect and the distribution block), then the branch fuses and the ground bar, then the motor starter with control transformer T1 and its X1/X2 side, and the 24 V supply, terminal strips and PLC in the middle.

Improved

Level 1: the Start, Stop and E-Stop pushbuttons and the pump motor now sit in a strip marked “off the backplate”. On a real machine the pushbuttons are mounted on the panel door and the motor is out in the field. The wiring exercise itself is unchanged.

v2.44

Level 1: Right-Click Wire Removal, Tools Below the Lockout, White X2 Terminals

Development build v7.29

Fixed

Level 1: right-clicking a wire removes it again. A site-wide change that keeps wires from blocking button clicks had also blocked the right-click; the board now finds the wire under the pointer itself. As before, wires can only be changed after the panel is locked out.

Improved

Level 1: Step Back, Clear Wires and Show Wiring Hint now sit below the lockout panel, right above the board, in the order you use them: lock out first, then wire.

Fixed

Level 1: the note under the I/O table no longer calls the E-Stop behavior a training simplification. When the E-Stop drops the contactor, its 13-14 auxiliary contact opens input I:0/3 (M1_Aux) and the rung loses its seal, so releasing the E-Stop can never restart the motor, as NFPA 79 requires. The tag table now lists M1_Aux (I:0/3).

Improved

Level 1: the X2 terminals (XT) are now white Allen-Bradley 1492-J3-W blocks, matching the white wire of the grounded conductor X2 (NFPA 79 13.2.3). The starter card is now titled “Starter M1: Contactor + Overload” so both devices are easy to find.

Improved

Level 1: when all 16 required connections are made, the wiring counter now says “Wiring complete ✓”, so it is clear when the wiring part is done.

v2.43

Motor Fuses and a Real Starter on Level 2

Development build v7.28

Fixed

Level 2: the motor branch had no short-circuit protection. It now has three Class CC time-delay fuses, F2, F3 and F4 (Bussmann LP-CC-6, 6 A), one in each phase between the main disconnect and the starter, as NEC 430.52 requires.

Fixed

Level 2: the contactor and overload are now one Allen-Bradley starter, the same as Level 1: a 100-C09EJ10 contactor with a 193-T1AB40 overload (2.9 to 4 A, set to the motor’s 3.4 A) mounted underneath. The overload’s line side plugs straight into the contactor, so the motor branch wires are now 101 to 106, and the lockout test covers the overload’s 2/T1, 4/T2 and 6/T3.

v2.42

Level 1 Panel Rebuilt: Fuses, Control Transformer and E-Stop Logic

Development build v7.27

Fixed

Level 1: the panel had no fuse or circuit breaker. A distribution block after the main disconnect now feeds the motor branch through three LP-CC 6 A time-delay Class CC fuses, F2 to F4, one per phase. They are sized for the 2 hp pump motor (3.4 A) and give the branch its short-circuit and ground-fault protection (NEC 430.52).

Fixed

Level 1: the motor now runs through its overload relay. The contactor and overload are one Allen-Bradley starter (100-C09EJ10 with a 193-T1AB40 overload mounted underneath), and the motor leads leave from the overload’s 2/T1, 4/T2 and 6/T3.

Fixed

Level 1: the 120 V control power now comes from a 480 V to 120 V control transformer shown on the panel. The transformer has two primary fuses (F5 and F6), a fuse on X1 (F1), and X2 grounded and never fused. The 24 V supply’s output has its own fuse (F7) ahead of the controls, because this supply is not a Class 2 unit.

Fixed

Level 1: the PLC run rung now seals in through the contactor’s 13-14 auxiliary contact on input I:0/3. The E-Stop opens the coil circuit outside the PLC. When the contactor drops out, the seal is lost, so releasing the E-Stop can never restart the motor.

Improved

Level 1: field wiring takes +24 V and 0 V from their own screws on terminal strips TB1 and TB2, one conductor per terminal. X2 and 0 V are bonded to a ground bar. Saved wiring and ladder programs carry over automatically.

v2.41

Level 1 Control Power and Level 2 Operator Screen Fixes

Development build v7.26

Fixed

Level 1: the 24 V power supply was drawn fed straight from two phases of the 480 V disconnect. It now takes 120 V control power (X1 and X2) from a control transformer mounted above the panel, and each disconnect terminal carries one conductor. Opening the main disconnect still removes control power.

Fixed

Level 2: the operator screen now reports “M1 FAULT” instead of “M1 DRIVE FAULT”, since this across-the-line starter has no drive. The controller now labels input I:0/2 as the photoeye and output O:0/1 as the fault light, and the fault-light output reads 24 V on the meter while it is on.

v2.40

The Correct Control Fuse on Level 2

Development build v7.25

Fixed

Level 2: the F1 control fuse showed a picture of a circuit breaker. It now shows the correct part, an Allen-Bradley 1492-FB1C30 Class CC fuse holder, with its terminals marked 1 and 2 as on the device. The meter hints and the wiring use the same markings.

v2.39

A Cleaner Phone Menu

Development build v7.24

Improved

On phones, the site menu now folds into a Menu button at the top of each page. Tap it to open the full list of pages and your account links, and tap Close to put it away.

v2.38

Safety in Every Level

Development build v7.23

Improved

The About page now features a quote from John Clore on how safety runs through every level: lock it out and prove it dead before you wire, no jumpered safety circuits, and nothing that restarts on its own.

v2.37

Meet the Creator

Development build v7.22

Improved

The About page now shows a portrait of John Clore beside his biography, and the two stack neatly on phones.

v2.36

Who Builds ControlsTrainer

Development build v7.21

Improved

The About page now describes who builds ControlsTrainer: John Clore’s automation and controls studies, his certificates and OSHA 30-Hour card, his work on the plant floor as an industrial electrical technician, panel builder and maintenance technician, and his earlier software work, including co-creating the D-Vasive privacy app.

v2.35

Company Plans Start at One Seat

Development build v7.20

Improved

Company plans now start at 1 seat, so a small shop or a single technician can buy. Team covers 1–20 seats at $299 per user per year or $29 per user per month. The lower Business rate of $249 per user per year now starts at 21 seats instead of 50, and Enterprise quotes still start at 250 seats. Prices are unchanged.

v2.34

Free 30-Day Trials for Schools and Companies

Development build v7.19

New

Schools and companies can request a free 30 day pilot from the contact page, with all ten levels and the manager tools. Our team sets up each trial. No payment details are needed, and nothing renews automatically.

Improved

The contact page, the Why ControlsTrainer page and the Plans page now offer the free trial by name.

v2.33

A Contact Form for Demos, Pilots and Pricing

Development build v7.18

New

The new contact page lets schools and companies request a demonstration, a pilot for their team or classroom pricing, ask a question or get help with an account. Requests go straight to our team, and nothing opens an email program.

Improved

The contact links on the Why ControlsTrainer, About, Plans, Support, Privacy and Terms pages now open the contact form instead of an email program. The Why ControlsTrainer page’s buttons choose the right request for you, such as classroom pricing for schools or a pilot for a plant.

v2.32

Why ControlsTrainer in the Menu, and a Faster Start

Development build v7.17

Improved

The main menu on the home page and the About, Plans, Compliance, Support, Privacy, Terms and Enterprise quote pages now links to the Why ControlsTrainer page.

Improved

The Why ControlsTrainer page now opens with a short summary: why controls skills are hard to build, and three points on what ControlsTrainer does. The hands-on training, the standards the lessons draw on and the manager tools now come before the detailed workforce, safety and insurance numbers.

v2.31

Charts on the Why ControlsTrainer Page

Development build v7.16

Improved

The Why ControlsTrainer page now shows its numbers as charts, each with its source: projected job growth against the average job, open manufacturing jobs by month, the 3.8 million manufacturing jobs to fill, lecture versus active learning, workers killed by electricity each year, OSHA’s most-cited standards and what an experience mod does to a workers’ compensation premium.

v2.30

New Why ControlsTrainer Page

Development build v7.15

New

The new Why ControlsTrainer page explains the training for schools, factories and industrial companies: the workforce need, with sources; how hands-on practice compares with other kinds of controls training; the code practice built into each of the ten levels; how safety training relates to workers’ compensation premiums; and the manager tools and plans.

v2.29

Level 10 Panels Fit the Screen

Development build v10.4

Improved

Level 10’s panels no longer scroll sideways on a laptop or desktop screen. A row of devices that is wider than the panel now continues on the next row, and each new row gets its own wireway, so every wire still runs only in wireways. On a phone or a narrow tablet, a panel scrolls only where one device is wider than the screen, because its terminals can’t shrink below finger size.

Improved

On Level 10’s Pneumatic panel, the pick cylinders’ rod-lock port and its note now sit under the cylinder photos instead of beside them.

Improved

Level 10’s three branch breakers now carry these catalog numbers on their nameplates: the Allen-Bradley 140MT-C3E-C10 feeding the 24 V power supply, the 140MT-C3E-B40 protecting the PowerFlex 525 drive (the breaker Rockwell lists for that drive) and the 1489-M1C050 on the 24 V DC control bus.

v2.28

Terminal Breakouts and Power Devices on Level 10

Development build v10.3

Improved

On Level 10, no wire crosses a device any more, including the device it lands on. Where a device’s terminals sit between other terminals, buttons or ports (the PowerFlex 525, safety contactors K1 and K2, the pump contactor and the valve manifold), the panel shows the whole device and, right under it, close-up terminal breakouts of its terminal rows. Every wire leaves a breakout straight down into the wireway. The motor protector’s trip contact, the guard switch contacts and the Ethernet switch’s ports now leave sideways into their own wireways.

Improved

Level 10’s main disconnect, safety contactors K1 and K2, pump motor protector and pump contactor now carry these catalog numbers on their nameplates: the Allen-Bradley 194R-J30-1753 fused disconnect, the 100S-C09EJ14BC safety contactor, the 140MT-C3E-B16-RX motor protector with its 95-96 trip contact, and the 100-C09EJ10 contactor.

Fixed

Level 10’s safety contactors now use their 51-52 mirror contact for the external device monitoring (EDM) loop. That is the numbering on the 100S-C09EJ14BC (13-14 N.O. and N.C. mirror contacts 51-52, 61-62, 71-72 and 81-82), which has no 21-22. If you already wired the old 21-22 contact, your wiring moves to 51-52 when you resume.

Fixed

The 194R disconnect has no ground lug, so Level 10’s drawing no longer shows one. The incoming supply’s equipment-grounding conductor is already landed on PE-2 of the PE bar. PE-2 and the disconnect’s line-side lugs, which already carry the incoming feeder, now refuse a second conductor and say why. If your saved wiring has a conductor on the old ground lug, it is removed when you resume, and the rest of your wiring is kept.

v2.27

One Conductor per Terminal and a Monitored Safe-Exhaust Valve on Level 10

Development build v10.2

Fixed

Level 10’s safe-exhaust valve is now a ROSS DM1C double valve (DM1CNB20A32005) that resets itself after a fault. The drawing used to call the valve monitored without giving it a working monitoring circuit. Now its status sensor is powered all the time and wired to the PLC, where a pre-engineered, read-only routine, Valve_Monitor, watches its READY and FAULT outputs. A valve fault drops both solenoid run commands, stops the cell and blocks a restart until READY returns and you press Fault Reset, and Fault Reset never restarts anything. The PLC can only remove the air: each run command reaches its solenoid through a safety contactor, so K1 or K2 dropping out still dumps the air on its own.

New

Level 10’s safety test (Section 3) has two new buttons, Valve fault (DM1C) and HMI Fault Reset, and two new pieces of evidence: a valve fault vents the air and stops the cell, and after Fault Reset only a new Start re-energizes the valve. The witnessed acceptance run proves the valve monitor too.

Fixed

Level 10’s PowerFlex 525 now shows its control terminals with the cover off. Its Safe Torque Off inputs S1 and S2 are fed from the panel’s external 24 V, so the drive’s digital common, terminal 04, now returns to that supply’s 0 V through its own interpanel terminal, as Rockwell’s wiring requires. Leaving it off fails the drive check.

Improved

Level 10 has an Air-OK pressure switch, the normally open Festo 527467 SDE5, on a 6 mm branch of the valve outlet through a Festo QST-8-6 reducing tee. Its brown, blue and black leads each take their own terminal, and it reports air pressure to the PLC as a diagnostic, not as the valve’s safety monitoring.

Improved

Level 10’s four electrical panels now take one conductor per terminal, and its air panel one tube per port. A power distribution block splits the 480 V feed, and breaker-protected +24 V and 0 V control-bus strips give every device its own position. A safety junction strip fans out the safety relay’s test pulses and safety outputs, every interpanel terminal has an A side and a B side, and push-in tees branch the air line (8 mm tubing). A second conductor on a terminal is refused with the reason. Wiring saved on the old drawing is cleared when you resume; your other Level 10 work is kept.

Fixed

Level 10’s 24 V DC system is now grounded at one designated point, a factory bond from the 0 V control bus to PE. Its 0 V conductors are drawn white with a blue stripe, the NFPA 79 color for a grounded DC conductor. The drawing used to call the system floating while coloring 0 V as grounded.

Fixed

Level 10’s safety relay is now the Guardmaster DI 440R-D22R2, showing its 16 terminals where they are on the relay. The old picture showed a relay model that does not exist. The safety reset pushbutton is now an image instead of a drawing.

Improved

Level 10’s output and analog modules and its guard interlock are now the Allen-Bradley 5069-OB16 and 5069-IF8 and the Guardmaster Trojan 5 440K-T11339 (two N.C. safety contacts and one N.O. auxiliary). The air line’s push-in tee is a Festo QST-8.

Improved

Level 10’s wires now run through wireways and never cross a device, nameplate or terminal. Each I/O module has its own vertical wireway, and every device carries a Level 1 style nameplate.

Improved

Level 10’s pump branch now leaves the distribution block through its motor protector (MPCB) first, then safety contactors K1 and K2, the pump contactor and the motor, so the MPCB protects the whole branch.

Improved

On Level 10, a silenced exhaust port refuses a tube, an air port can only be tubed on the Pneumatic panel, and an electrical terminal is refused there with the panel where it is wired.

v2.26

A Clean Pneumatic Board on Level 5

Development build v5.10

Improved

Level 5’s “4. Pneumatic Circuit” board is rebuilt around one clean, straight-on image of each device, laid out in air-flow order: the Festo MS6 filter-regulator, lockable shut-off valve (Q-air) and soft-start valve, the VTUG valve terminal, the meter-out flow controls, the bleed/test panel, the horizontal cylinder and the vertical slide with their HGL piloted check valves, and the SMC MHZ2 gripper. The board is about half as tall, and every gauge needle reads its own 0–150 psi dial.

Improved

Level 5’s Q-air valve now shows its handle turned to OFF, your padlock and your DANGER tag, both on the pneumatic board and on the Energy Isolation panel.

Improved

Level 5’s solenoid common block is now a Phoenix Contact PTFIX 6/18X2,5 BU distribution block.

Fixed

Clicking the Q-air exhaust port on Level 5 now explains that an exhaust carries a silencer and must never be tubed or plugged.

v2.25

Level 5 Power Supply Shown Head-On

Development build v5.9

Fixed

Level 5’s 24 V power supply (MEAN WELL DR-75-24) is now shown head-on like every other device, with its terminal markings printed once and a marker on each screw. The old picture was taken at an angle, its markers overlapped, one sat on the DC OK light, and its labels were doubled.

v2.24

Safety Relay, Device Images and Wireways on Level 7

Development build v7.14

Fixed

Level 7’s Guardmaster DI 440R-D22R2 safety relay now shows the relay’s 16 terminals where they are on the device; its picture showed a relay model that does not exist. The monitored reset loop now runs the way the relay is wired: +24 V through the contactor’s mirror contact 21–22 and the Reset pushbutton to S34. The panel had an S33 terminal, which this relay does not have.

Improved

Level 7’s guard switch is now a non-locking Allen-Bradley SensaGuard 440N-Z21S16H, because the lesson treats opening the guard as a stop demand. Its two safety-output inputs are tied to +24 V on TB2 (wires 518 and 519); a single switch needs both ties, or its safety outputs stay off. Its auxiliary output is ON while the guard is open, so the PLC tag is now Guard_Open and the Turret_Run rung uses it as an XIO. Saved programs are converted when you resume.

Fixed

Level 7’s factory power wiring is now laid out like a 480 V cabinet. The disconnect feeds a power distribution block. From there, 2-pole primary fuses feed a 250 VA, 480/120 V control-power transformer, sized for the 24 V supply’s rated input, and one secondary fuse feeds the supply. The transformer’s grounded X1 conductor is drawn white and bonded to PE at one point. Before, a single 1-pole protector fed the 24 V supply straight from the 480 V line.

Fixed

Level 7’s 0 V DC conductors are drawn white with a blue stripe, the NFPA 79 color for a grounded DC conductor. The panel now shows the one factory bond that grounds them (TB3-8 to TB-PE-8), and the wire schedule lists it.

Improved

Level 7’s safety relay now tells the PLC when it has tripped: its Y32 status output goes to input I:0/6 (Safety_Tripped). The relay opens the contactor coil, but the PLC keeps running, so the Turret_Run rung must drop its own run latch when the relay trips (XIO Safety_Tripped). Without it, pressing RESET restarts the turret; the HMI then shows UNEXPECTED RESTART and the acceptance test fails. Before, the simulator dropped the run latch by itself, which hid this.

Improved

Level 7’s safety relay, safety reset pushbutton and guard switch now show images of named models instead of drawings or a model that does not exist. So do the stack light and interface relay offered in the hardware list. The guard switch shows an M12 connector instead of screw terminals it does not have.

Improved

Level 7 now takes one conductor per terminal. A second conductor on a terminal, or a conductor on a factory-wired terminal, is refused with an explanation. Wiring saved on the old panel is cleared when you resume; your components, I/O assignments and program are kept.

Improved

Level 7’s wires, including the factory power wiring, now run through the panel’s wireways and never cross a device, label or terminal. No device sits over a wireway at any screen width or zoom level, and each device’s name is placed clear of the wires that leave it. The zoom buttons now enlarge the whole panel.

Fixed

Level 7’s wire-number tags sit on their wires, clear of the devices, and can be clicked to enter or correct a number. A click on a tag used to reach the device underneath instead.

Fixed

Level 7’s wire schedule (drawing L3-001, now Rev E) lists the new reset-loop and guard conductors, and its color column now gives the NFPA 79 colors drawn on the panel: blue for +24 V DC and DC control, white with a blue stripe for 0 V. It listed the +24 V wires as red.

v2.23

Stop Chain and NFPA 79 Wire Colors on Level 5

Development build v7.13

Fixed

Level 5’s E-Stop and guard now switch the +24 V supply of the solenoid outputs: +24 V runs through the E-Stop and the guard’s second channel to a new junction, TB3, which feeds both output groups of the PLC. They used to break the solenoids’ 0 V return, where a single ground fault on the field wiring could bypass both of them. The coils’ common now lands directly on the 0 V bus, and that bus is bonded to protective earth at one marked point (TB2-8).

Fixed

Level 5’s conductors now use the same NFPA 79 colors as Levels 1, 3, 4, 6 and 10: +24 V DC and DC control wires, including the stop chain, are blue, and the grounded 0 V return is white with a blue stripe. They were drawn red, which is the color for AC control. Sensor and cordset leads keep their own brown, blue and black colors.

Improved

Level 5 wiring saved with the old stop chain is cleared when you resume; your hardware, I/O, tubing and program are kept.

v2.22

Device Images and Terminal Strips on Level 3

Development build v7.12

Improved

Level 3’s HAND/OFF/AUTO selector and both float switches are now device images instead of drawings: a three-position selector with two contact blocks (HAND 13–14, AUTO 23–24), an SPST low float switch and an SPDT high float switch. The selector’s knob turns and its active position lights up, on the panel and on the operator station, and each float shows whether its contact is open or closed.

Improved

Level 3’s device names now look like Level 1’s: a dark nameplate on each device, with its notes and buttons, instead of a separate box above the wireway.

Improved

Level 3’s +24 V and 0 V now come from the bridged terminal strips TB1 (red) and TB2 (blue), with one conductor per terminal, and the hardwired float control makes its shared points on the TB3 junctions J1 and J2. A second conductor on a terminal is refused with an explanation. Wiring saved on the old panel is cleared when you resume; your program, selector position and tank level are kept.

Improved

Level 3’s panel is laid out on four DIN rails with a wireway under each. No device sits over a wireway at any screen width, and on small screens the panel scrolls sideways.

Fixed

Level 3’s contactor and motor notes now say the motor wiring is factory-wired, and the contactor’s 13–14 contact is labeled as the seal-in of the hardwired option.

v2.21

Safety Relay, Guard and E-Stop Tests on Level 6

Development build v7.11

Improved

Level 6’s safety circuit is rebuilt around a Guardmaster DI 440R-D22R2 safety relay: the two-channel E-Stop is on input 1 and the guard interlock’s two N.C. safety contacts are on input 2, both fed from the relay’s test-pulse outputs S11 and S21. After the E-Stop is released or the guard is closed, the relay needs its monitored reset through the contactor’s mirror contact, and the conveyor needs a separate Start.

Improved

Level 6’s guard is now a guard interlock switch with two N.C. safety contacts and an N.O. status contact. The status contact tells the PLC the guard is open (Guard_Open), and the relay’s status output Y32 tells it the relay has tripped (Safety_Tripped). The conveyor rung must drop its run latch when the relay trips, so a reset can never restart the conveyor; the simulator shows an unexpected restart if it does.

Improved

Level 6 has an Open Guard button in the HMI & Safety Test panel. The acceptance test now includes two tests on the running machine, each as one uninterrupted sequence: the guard test (open, close, RESET) and the E-Stop test (press, release, RESET). Neither may restart the conveyor, and changing the wiring, program or I/O map afterwards means testing again. The button tests the interlock; in normal work, stop the machine before opening a guard.

Improved

Level 6’s +24 V and 0 V now come from the bridged terminal strips TB1 (red) and TB2 (blue), and the test-pulse junctions are made on TB3, with one conductor per terminal. A second conductor on a terminal is refused with an explanation. Wiring saved on the old panel is cleared when you resume; your hardware selection, I/O map and program are kept.

Improved

Level 6’s wires now run through the panel’s wireways and never cross a device, label or terminal, and no device sits over a wireway at any screen width. Each device’s name is placed clear of the wires that leave it.

Fixed

Level 6’s conductors now use the same NFPA 79 colors as Levels 1, 3, 4 and 10: +24 V DC and DC control wires are blue, and the 0 V return is white with a blue stripe. They were drawn red, which is the color for AC control.

Improved

Level 6’s safety reset pushbutton now shows an image instead of a drawing, and the hardware cards no longer label parts as decoys or as required hardware. The hardware check tells you which selected parts the work order does not need.

v2.20

Wireways and Bridged Power Strips on Level 8

Development build v7.10

Improved

Level 8’s +24 V and 0 V now come from two bridged terminal strips, TB1 (red) and TB2 (blue), with one conductor per terminal. Feed each strip once from the power supply; the controller and the transmitter each take their own strip position. A second conductor on a terminal is refused with an explanation.

Improved

Level 8’s wires now run through the panel’s wireways and never cross a device, label or terminal. Each wire’s number tags sit near both of its ends, clear of the devices.

Improved

Level 8’s L8-001 wire-number schedule is renumbered for the strips: a conductor to a strip carries the number of its function, whichever strip position it lands on.

Fixed

Level 8 now shows why a wiring click was refused, for example when the panel is not locked out yet.

Fixed

Level 8’s click targets on the controller, analog input, transmitter and I/P positioner no longer overlap.

v2.19

Wireways on Levels 4 and 5, and Bridged Power Strips on Level 5

Development build v7.09

Improved

Level 4’s wiring now runs through the panel’s wireways, like Levels 1 and 3: every conductor drops from its terminal into a duct and never crosses a device, label or terminal. The code notes now sit below the panel.

Improved

Level 5’s +24 V and 0 V now come from two bridged terminal strips: TB1 (red, +24 V) and TB2 (blue, 0 V). Feed each strip once from the power supply, then land every other +24 V or 0 V conductor on its own strip position, as on a real panel.

Improved

Level 5 allows one conductor per terminal and one tube per air fitting. A second one is refused with an explanation, and wiring saved before this change is checked the same way.

Improved

Level 5’s wires and air tubes now run through wireways and tube channels, and each device’s name is placed clear of the wires and tubes that leave it, so no wire or tube crosses a device, label or terminal.

Fixed

Level 5’s click targets on the PLC, the sensors and the valve terminal no longer overlap, so each tap lands on the terminal or port you meant.

Fixed

Level 4: Undo with nothing left to undo now also cancels a half-finished selection.

v2.18

Two-Channel E-Stop on Level 4, Wireways on Levels 1 and 3, and Fixes Across the Levels

Development build v7.08

Improved

Level 4 now uses a two-contact emergency stop. Contact 11–12 feeds the drive’s Safe Torque Off input S1 and contact 21–22 feeds S2, on two separate channels with no jumper between them. A link between the two channels, or a jumper across either contact, is rejected as unsafe.

Fixed

Level 4’s drive no longer runs from its keypad unless both Safe Torque Off inputs are wired through the E-Stop. Losing either input stops the drive, and restoring it never restarts the drive by itself: a fresh Start is required.

Improved

Level 4’s nameplate check now says which values are still empty and which do not match the motor nameplate, and points you to the nameplate photo. Check results are announced to screen readers.

Improved

Level 1’s wiring now runs through the panel’s wireways: every conductor drops from its terminal into a duct and never crosses a device, label or button. On smaller screens the panel scrolls sideways instead of rearranging, and terminal targets no longer overlap on phones.

Improved

Level 3’s panel has a new layout built the same way, with every conductor routed through the wireways.

Fixed

Level 3: after an overload trip or an E-Stop, the pump stays stopped until the overload is reset, the E-Stop is released and the selector is turned to OFF. Only then can it be started again.

Improved

Level 2 accepts the classic way to find an open part: voltage present on its supply side and none on the far side, both measured to the same reference with the right meter function. Readings taken before and after a change in power, readings from an earlier fault, and readings taken with the meter off do not count.

Improved

The Level 2 test bench can be used from the keyboard: choose the meter function and probe any test point without a mouse, and screen readers announce each reading.

Fixed

The Level 2 tour now lists the lockout steps in the same order as the lesson: open the disconnect, apply your lock and tag, then verify zero energy.

Improved

Level 6’s hardwired control string must now include the guard switch. The devices can be wired in any order, as long as every safety contact truly opens the circuit.

Fixed

On Levels 4, 5, 6, 8 and 10, Clear now also cancels a half-finished selection, and so does Undo when it steps back a wiring action, so your next click does not land a wire you did not intend.

Fixed

Level 1’s wiring message now updates as soon as your lockout is complete, instead of still saying the disconnect is on.

Fixed

Level 9’s operator terminal settings now match the manufacturer’s specifications: the 10-inch PanelView Plus 7 has an 800 × 600 display.

Improved

Buttons and controls across the lessons have clear names for screen readers, the tutorials open as proper dialogs, and more pages have a “Skip to content” link.

Improved

Several lessons fit better on phones, including the Level 2 test bench, Level 3’s controls and the Level 9 editor.

Improved

The Support page has a new, lighter design, and its password help now links straight to the password reset page.

Improved

Create Account shows the password requirement, has a Show password button, and links to the Privacy Policy and Terms of Use.

Improved

The homepage badge now reads “Standards-informed training” and links to the Standards & Compliance page, which explains that the lessons are an educational simulation, not a certification or approval.

Improved

Buying company seats: if your email address is not confirmed yet, the page now says so clearly, offers a button to send a new confirmation link, and keeps checkout off until the address is confirmed.

v2.17

Refreshed About and Compliance Pages

Development build v7.07

Improved

The About and Compliance pages now match the Plans page: lighter backgrounds, clearer cards and more comfortable spacing on computers and phones. The Compliance page also has a "Skip to content" link for keyboard and screen-reader users.

v2.16

Skills Matrix, Team Setup and a Redesigned Company Dashboard

Development build v7.06

New

Skills matrix for Department Heads and Supervisors: one grid of everyone on the team against all ten levels, showing passed levels with their dates, due and overdue training, and refreshers. Filter by group, download it as a spreadsheet, or print it or save it as a PDF training report with a reviewed-by and signature line.

New

New company accounts get a setup checklist and a guided tour of the dashboard: create groups, invite employees, assign their first lessons and track progress. Each step ticks itself off, and the tour can be replayed any time with the Tutorial button.

Improved

The company dashboard has a new design: a team summary at the top, quick links to each section, a clearer training overview and a three-step form for assigning training. It works well on phones.

Improved

Every level now has a web address that matches its number, from level1.php to level10.php. Old links and bookmarks to the first and third levels forward automatically.

Improved

A company whose subscription has ended now sees when access ends (or that it has ended) on its Billing and dashboard pages instead of a renewal date, and its people, groups and training history are kept.

Improved

The Plans & Features page now shows the skills matrix and the company dashboard, with pricing at the end of the page. The site also has its own browser tab icon.

Fixed

Corrected several level labels: the Level 1 page title, the Level 4 tutorial (which referred to Level 6) and the Level 9 course name on its certificate. Level 10 now has the site footer.

v2.15

Company Subscriptions, Bank Payments and Enterprise Quotes

Development build v7.05

New

Companies can now pay for training subscriptions by US bank account (ACH) as well as by card. Bank payments take up to 4 business days to clear; the company account is created as soon as the payment clears, and the buyer is emailed.

New

Enterprise customers (250+ seats) can request a quote directly on the site. The request form is protected against spam and automated submissions.

Improved

Training is now offered as company licenses and subscriptions: Team, Business and Enterprise. The homepage and sign-up pages point to View Plans, and all plan buttons share one style. Existing Full Access purchases keep their access.

Improved

Company checkout is more reliable: if a payment cannot be started, the buyer gets a clear message instead of a long wait, and an unfinished attempt is cleared automatically on the next try.

v2.14

Plans & Features

Development build v7.04

New

Compare Team, Business and Enterprise plans on the new Plans & Features page, with actual dashboard screenshots using sample data.

Improved

Public information pages now include Plans in the header navigation. Company checkout links appear when live billing is ready.

v2.13

Company Seats Online

Development build v7.03

New

Companies can buy training seats online by card: Team (5 to 49 people) and Business (50 to 249), billed yearly or monthly. The buyer becomes the Department Head and can invite the team right away.

Improved

A "Buy company seats" link appears on My Training and My Organizations when online purchases are open.

v2.12

Team Leaderboard

Development build v7.02

New

Organizations get a members-only leaderboard ranked by assigned training levels completed, then by on-time completions. Speed never counts, and ties are shown as ties.

New

Anyone can become a private participant and be hidden from everyone else's board. Department Heads can switch the leaderboard off for the whole organization.

Fixed

Starting a message conversation is now all-or-nothing: a message that is too long or sent too often no longer leaves an empty conversation behind.

Improved

Message lists show 50 conversations per page, unread counts include every conversation, and a message that arrives while you are reading stays marked as new.

v2.11

Training Messages

Development build v7.01

New

Members can send private training messages to their Department Head and Supervisors, and managers can message the people in their groups.

New

Unread messages show on My Training and on the organization page. You get one email per conversation until you read it; the email never includes the message itself.

Improved

Messages follow the same group rules as Team training, so Supervisors only see conversations for the groups they manage.

v2.10

Modern Organization Workspace

Development build v7.00

Improved

Updated the Compliance page energy-isolation illustration with clearer lock and tag attachments, corrected conductor colors and instrument markings.

Improved

Organization pages now use a cleaner responsive workspace with clearer navigation, stronger visual hierarchy and easier-to-scan training information.

Improved

Team statistics, status labels, forms, tables and action buttons are easier to distinguish while keeping every existing organization and billing control in place.

v2.09

Due-Date Reminder Emails

Development build v6.99

New

People get a reminder email two days before assigned training is due, and one email if it becomes overdue.

New

Department Heads, and Supervisors / Team Leads for the groups they manage, get one summary on days when training becomes overdue.

New

Department Heads can switch reminder emails on or off for their organization from the organization page.

Fixed

Active training time now counts only time between when training was assigned and when it was completed, and two tabs reporting at the same moment are counted once.

Improved

The current stage now follows the section you are reading as you scroll, not only where you click.

Improved

Organization pages now share one stylesheet and one script, ready for a design refresh.

v2.08

Training Time and Current Stage

Development build v6.98

New

Team training now shows how much active time each person has spent on assigned training, when they were last active, and which lesson stage they are on.

New

My Training shows your own active time and current stage on each assigned level.

Improved

Only active time counts: time with the lesson hidden or with no activity for a few minutes is not added, and two open tabs are never counted twice.

Improved

The Team training CSV download adds active minutes, current stage and last active.

v2.07

Faster Support Replies

Development build v6.97

Improved

Messages to info@, support@ and contact@controlstrainer.com are now handled in one place, so questions get answered faster. Replies come from the address you wrote to and are signed for delivery.

v2.06

Organization Page Fixes

Development build v6.96

Fixed

Removed extra confirmation boxes that could appear for Department Heads on their organization page.

Improved

The People list now points to the Team training section for assigned training and progress.

v2.05

Assigned Training with Due Dates

Development build v6.95

New

Department Heads can assign training levels to people or whole groups with a due date picked from a calendar. Supervisors and Team Leads can assign to the groups they manage. Everyone assigned gets an email.

New

A Team training table shows what each person has been assigned, what they completed on time or late, and what is overdue, with a CSV download.

New

My Training now lists your assigned training at the top with its due date and a Start button.

Improved

Only training completed after it was assigned counts, so managers see company training only. Assigning a level again works as a refresher.

v2.04

Clearer Seat Wording and Compliance Picture

Development build v6.94

Improved

Organization pages now say seats are Available instead of Free, and show Renews, Ends (canceled) or Payment due by for paid plans.

Improved

The Compliance page picture now shows one exact absence-of-voltage test: meter on AC volts reading 0.0 V with the probes on load-side terminals T1 and T2, the disconnect locked OFF and the air dumped to 0 psi.

v2.03

Online Company Seat Purchases (Testing)

Development build v6.93

New

Companies will be able to buy training seats online and manage them from a Billing page: add or remove seats, update the card, see invoices, or cancel at the end of the paid period. This is being tested now and is not yet open to customers.

v2.01

Company Accounts (First Release)

Development build v6.91

New

Companies can now have an organization account with a set number of training seats. Everyone in the organization gets Full Access to every level while they are a member.

New

Department Heads invite people by email and organize them into groups such as shifts or lines. Team training progress comes in the next update, showing only training done through the company.

New

Supervisors and Team Leads see and invite only the people in the groups they manage.

Improved

Invitations hold a seat for 7 days and can only be accepted by the person they were sent to, after confirming their email address.

Improved

Removing someone frees their seat straight away; their training history and certificates are kept.

v2.00

Password Reset and Email Confirmation

Development build v6.90

New

Forgot your password? Use the new link on the log-in page and we will email you a reset link that works once, for 1 hour. Changing your password signs out every other device.

New

New accounts get an email to confirm the address. If yours is not confirmed yet, My Training shows a reminder with a button to send a new link.

Improved

You get an email whenever your password is changed, so you would know if it was not you.

Improved

Extra protection against automated sign-ups and repeated reset requests.

v1.99

Verifiable Certificates

Development build v6.89

New

Every certificate now has a permanent Certificate ID that is issued once, when you complete the level, and stays the same every time you open it. The completion date is the day you actually passed.

New

Employers can check a certificate on the new Verify page (controlstrainer.com/verify.php). It shows the name, level and completion date for a valid ID, and nothing else.

Improved

My Training now has a Certificate link beside every level you have passed.

Improved

Levels 1 and 2 are still free to use without an account. To get a certificate you now log in or create a free account and save your pass; your work stays on screen while you sign in.

Fixed

Level 3 and the Level 7 wire schedule now correctly require Full Access.

v1.98

Level 5 Rebuilt with New Devices, Safe Stopping and Air Lockout

Development build v6.88

New

Level 5 now uses named equipment examples throughout: an Allen-Bradley MicroLogix 1400 (1766-L32BXB) with a simulated terminal layout and addresses, a Festo VTUG valve terminal with two 5/3 exhaust-center and two 3/2 valves, Festo HGL piloted check valves on each cylinder, a SITEMA KRP 25 safety catcher on the vertical axis with two SICK sensors, a spring-close SMC MHZ2 gripper, a Schmersal AZ 16 guard interlock, and more.

New

Stopping and holding now work like a real cell: an E-stop or opening the guard drops every valve through a hard-wired stop chain, the valves center and vent, the check valves hold the cylinders, the catcher holds the vertical axis and the gripper stays closed on its spring. Nothing retracts, and RESET never moves anything.

New

Level 5 now starts energized with trapped air in the cylinders. Before wiring or tubing you isolate the control panel and both air isolation points, support the vertical axis, secure the part, bleed the trapped chambers on the bleed panel and prove every volume at 0 psi on its own gauge.

Improved

Tubing is now dressed like a real trainer board: tubes run together in bundles with zip ties instead of crossing over the devices, and wires stay in the wireways.

New

Training faults added: blocked pilot lines, stuck brake and supply sensors, a welded guard contact and a closed flow control, each with its own fault message.

v1.97

Level 8 Valve Status Fits the Graphic

Development build v6.87

Fixed

Level 8: the FV-101 valve status no longer runs off the right edge of the process graphic. It now shows on two lines, for example FV-101 SHUT with NO POWER or FAIL-CLOSED underneath.

v1.96

Lockout Handle Display & Level 8 No-Power Readout

Development build v6.86

Fixed

Every lockout panel: the disconnect handle picture now turns together with the status text. Before, the handle could keep showing the previous position (ON while the panel said OFF, or OFF while it said LIVE) until the next click. Rapid ON/OFF clicks now always end on the right position.

Fixed

Level 8: with the panel isolated, the LT-101 transmitter now reads NO POWER and the controller PV reads OFFLINE, instead of the fault code FALT. The HMI no longer shows a fault while the loop is simply switched off.

Improved

Level 8: a real transmitter fault now reads FAULT in full on the transmitter and on the controller PV.

v1.95

Level 6 Restart Safety, Terminal Tips & Small Fixes

Development build v6.85

Fixed

Level 6: Start pressed while the safety relay is off (after an E-Stop or a power restore, before RESET) is now ignored. It can’t carry over and start the conveyor when you press RESET. After RESET, release and press Start again.

Fixed

Level 6: the HMI RUN lamp and the program’s outputs now show OFF whenever the safety relay is off, so the screen never shows the conveyor running when it can’t.

Fixed

Level 6: the contactor and motor T1/T2/T3 terminal tips and the contactor caption now say the 3-phase power is factory-wired through the overload, rather than asking you to wire it.

Fixed

Level 7: the Open Wire Schedule link now always opens the current Rev D schedule, never an older cached copy.

Fixed

Level 8: with the panel isolated, the process graphic now shows the valve “SHUT · NO POWER” and the HMI network “OFFLINE — NO POWER”. After a transmitter fault the valve shows “SHUT · FAIL-CLOSED”, matching its real state.

v1.94

Level 4 Lockout with Drive DC-Bus Discharge

Development build v6.84

New

Level 4 now starts with the drive energized. You can’t land, remove or undo control wiring until the main disconnect is OFF, your lock and tag are on, and zero energy is proven with the meter.

New

The PowerFlex DC bus keeps a charge after the mains are removed. As the drive label requires, you wait at least 3 minutes before testing the bus. A DC-bus test before the wait doesn’t count, even if it happens to read zero. The wait runs faster in the simulator and is labeled as simulated time.

New

Level 4 verification covers the drive input line-to-line and line-to-ground, the DC bus +/− and each side to ground, and the 24 V control supply, proving the meter before and after. The DC-bus lamp is shown as an indicator only; a dark lamp or an elapsed timer never proves zero volts.

Improved

Switching the disconnect OFF stops the drive (“NO POWER”), and restoring power leaves it stopped until you deliberately start it from the PLC or the keypad. Saved work resumes with the drive OFF, and an earlier verification is not trusted.

v1.93

Lock Out Before You Wire — Levels 3, 6, 7 & 8

Development build v6.83

New

Levels 3, 6, 7 and 8 now start with the panel energized, like Levels 1 and 10. You can’t land, remove or undo a wire until the main disconnect is OFF, your lock and tag are on, and you have proven zero energy with the meter (live–dead–live).

New

Switching the disconnect OFF de-energizes that level’s controller, 24 V supply and safety relay. Nothing runs without power, and the incoming line side stays live.

Improved

Restoring power never restarts the machine by itself. Level 3 needs the selector turned through OFF. Levels 6 and 7 need the safety relay’s monitored RESET and then a fresh Start. Level 8’s loop comes back in MANUAL at 0 % until you select AUTO.

Fixed

Level 6: the conveyor now runs only while the 440R safety relay is energized, because the contactor is fed through its safety output. Before, Start could run it after an E-Stop was released but before the safety RESET.

Improved

Level 8 shows “NO POWER” on the HMI when the panel is isolated, because the loop-powered transmitter is fed from the same panel.

Improved

Saved work on these levels resumes with the panel OFF, and an earlier verification is not trusted.

v1.92

Bigger Locks & Tags on the Lockout Devices

Development build v6.82

Improved

The personal padlock and danger tag on the lockout pictures (main disconnect and air dump valve) are now larger and easier to see. They still hang from the handle without covering the terminals.

v1.91

Realistic Lockout Devices & Fairer PLC Program Check

Development build v6.81

New

The lockout panels on Levels 1 and 10 now show a realistic rotary main disconnect and a lockable air dump valve with a pressure gauge. The handle turns ON/OFF, your padlock and danger tag appear when you apply them, and the gauge needle falls as the air vents. Everything follows the simulation.

New

Level 10 shows the conveyor drive’s DC-bus lamp, lit while the bus still holds a charge. The lamp is only an indicator: a dark lamp does not prove zero volts, so you still measure the bus.

Fixed

The Level 10 PLC check no longer rejects a correct program just because series contacts or parallel branches are in a different order (for example XIC Cell.CycleActive then XIC Mode.Auto). Order-independent logic is graded as equivalent. A missing, extra or different instruction still fails, as do the syntax, current-download and safety checks.

v1.90

Level 10 Safe-Exhaust Coil Terminals

Development build v6.80

Fixed

Each Level 10 safe-exhaust valve solenoid now has two separate coil terminals, A1 (+) and A2 (−), on the two rings of its connector. Before, the switched +24 V feed from K2 (wires 519/520) and the 0 V return landed on the same single terminal. Now the feed goes to A1 and the return to A2.

Improved

Level 10 now rejects a wire straight across a coil (“shorts out the coil”), a K2 feed landed on A2, and a 0 V return landed on A1.

Improved

The safe-exhaust valve picture on the safety and pneumatic boards is larger, so the A1 and A2 terminals are easy to click separately.

Improved

Saved Level 10 work from before this update is moved across automatically. The K2 feed moves to A1 and the 0 V return to A2, keeping their wire numbers.

v1.89

Level 10 Lockout: Main Disconnect + Air Dump

Development build v6.79

New

Level 10 now starts with the cell energized. A new Energy Isolation step before Panel Power has you lock out both energy sources before you build. Electrical boards need the main disconnect OFF, locked, tagged and proven dead. The pneumatic board needs the air dumped, locked, tagged and proven at 0 psi as well.

New

Proving the main disconnect dead includes the conveyor drive’s DC bus, which keeps a charge after switching OFF. It only counts once your meter reads zero. (The discharge is sped up in the simulator; a real drive label requires several minutes.)

New

Proving the air dead means reading 0 psi on the downstream gauge after it vents, bleeding trapped air at the cylinder ports, and lowering or blocking the vertical axis. A rod lock holding the load is still stored energy.

Improved

The Level 10 safety test uses the same lockout. Reset and start are refused while you are isolated, and you cannot isolate while the machine is running. Verify Zero Energy only counts after both sources are really locked, tagged and proven dead. The witnessed acceptance run needs power and air restored.

Improved

Saved Level 10 work resumes with everything OFF, and verification from an earlier session is not trusted.

Fixed

Level 7’s TB2/TB3 descriptions in hardware selection now say which devices land on the field side and which tap the bus on the panel side.

v1.88

Level 8 Recheck Status, HMI Truth & Terminal Names

Development build v6.78

Fixed

In Level 8, after you change the wiring, the I/O map or the scaling, any later step that had passed now shows “Needs recheck” instead of staying green, so the page matches what still counts.

Fixed

The Level 8 HMI no longer says the valve is modulating when AUTO is selected but the loop has not been released. It says the loop is not released and the valve is held at 0%, and the AUTO indicator stays off until control is really active.

Improved

All 19 Level 8 wiring terminals now have names for screen readers, including each terminal’s device and function.

v1.87

Level 7 Sensor Terminals, Wire Schedule & Load Check

Development build v6.77

Fixed

Level 7’s photoeye and proximity-sensor leads sat only about 11 px apart, so clicking one could land the wire on its neighbor. The sensor cards are now larger, the leads are about 25 px apart, and every terminal has its own round, centered target.

Fixed

The Level 7 wire schedule now agrees with the checker. Safety relay A1/A2 (501/502), output-module V+ (510) and contactor coil A2 (513) land on the panel side of TB2/TB3, because they are panel devices. Field devices land on the field side.

Improved

The Level 7 wire schedule is now one clean student document (drawing L3-001 Rev D) listing all 42 numbered conductors and the network cable, without the old review notes and superseded wires.

Fixed

The Level 7 load check now adds up correctly: about 2.22 A steady (74% of the 3 A supply) and about 2.5 A during a guard lock pulse.

Improved

If the relay power, output V+ or coil return are on the wrong side of a terminal block, Level 7 now says to use the panel side, and the TB2/TB3 labels explain which devices use which side.

v1.86

Lock Out Before You Wire (Level 1) & Level 5 Fixes

Development build v6.76

New

Level 1 now starts with the panel energized. Before you can land, remove or undo a wire, you turn the main disconnect OFF, apply your personal lock and danger tag, and prove zero energy with the meter: test the meter on a known source, test every load-side point, then test the meter again.

New

The disconnect picture shows the handle, your lock and your tag as they change, and the line side stays marked live because switching OFF does not isolate the incoming power. Green only appears after a real verification.

New

Restoring power has its own steps: confirm tools are removed and everyone is clear, remove your tag, remove your lock, and switch the disconnect ON. Power-up never starts the motor; you still press Start. Switching OFF while the pump runs stops it.

Improved

Saved Level 1 work resumes with the panel OFF, and a verification from an earlier session is not trusted, so you verify again before working.

Fixed

Closely spaced terminals no longer steal each other’s clicks. The hover magnifier used to enlarge the terminal’s clickable area over its neighbors. Now only the highlight grows, and each terminal keeps its true click area (Levels 1, 3, 6 and 7).

Fixed

Level 5 accepts the E-Stop and guard switch contacts wired either way round. A plain contact has no polarity. Wires that bridge or bypass a contact are still rejected.

Improved

Every Level 5 wiring terminal and air port now has a readable name for screen readers and a hover tooltip.

Fixed

Level 4’s E-Stop caption now shows the correct 21–22 contact, and the interactive tutorials use the current level numbers.

v1.85

Level 2 Certificate & Level 3 Shared-Rail Wiring

Development build v6.75

Fixed

Finishing Level 2 now opens your certificate. Before this fix the certificate page said the requirements were not completed. Students who passed Level 2 earlier can open their certificate too.

Fixed

The Level 1 and Level 2 certificate pages now show the correct course names, and the garbled dash characters are gone.

Fixed

Level 3 now accepts +24 V and 0 V fed by a jumper from another terminal on the same rail, not only by a separate wire from the power supply. Wires that short the supply or bypass a contact are still rejected.

Improved

Level 3 reminds you that each terminal is rated for a limited number of conductors and that distribution terminal blocks are preferred for the +24 V and 0 V rails. A daisy chain is not automatically code compliant.

v1.84

Level 10 in My Training & Full Access Wording

Development build v6.74

Fixed

My Training now lists Level 10 with its Open link and Passed status like every other level, instead of showing it as In Development.

Fixed

The homepage, sign-up, unlock and account pages now say Full Access covers Levels 3–10.

v1.83

Reliable Completion on Levels 1–3 & Audit Follow-Ups

Development build v6.73

Fixed

Levels 1, 2 and 3 now record your completion only after the server confirms it; if the save fails your work stays put and a Retry save button appears. Levels 1 and 2 stay free with no account required: if you are not logged in you still get your free certificate, it just is not saved to an account.

Improved

Level 2’s zero-energy verification now also requires testing the overload’s own power terminals (line side 1/3/5 and load side 2/4/6) phase-to-phase and to a new PE ground bar, and warns that the disconnect’s line side stays live.

Improved

Levels 1 and 3 now explain their E-Stop restart behavior as a training simplification: on a real machine the PLC must see the E-Stop (Level 1), and the OFF-and-back selector step stands in for a reset circuit that is not drawn (Level 3).

Improved

Level 7 now marks the Stack Light and Interposing Relay as not part of drawing L3-001, explains why an extra jumper on a bus is rejected, and its wire-number dialog keeps keyboard focus inside from the first keystroke.

v1.82

Safety Audit Fixes Across All Levels

Development build v6.72

Fixed

Wiring checks on Levels 1, 3, 4, 5, 6, 7 and 10 now test the whole assembled circuit, not just the required connections. An extra wire that shorts +24 V to 0 V (directly or through other wires), joins two AC phases, jumpers across an E-Stop, guard, stop, overload or relay contact, or lands on a terminal the drawing does not use now fails with a message naming exactly what it does. Legitimate daisy-chained supply and common wiring still passes.

Fixed

The simulated machines now follow the same wiring truth: a shorted or bypassed circuit stops the machine, and a bypassed E-Stop can no longer prove the safety function.

Fixed

Releasing an E-Stop no longer restarts the machine by itself on Levels 1, 3 and 7. Level 1 and Level 7 need a new Start press after the release; Level 3 needs the selector turned to OFF and back.

Fixed

Level 2’s meter now reads 480 VAC between live phases and 277 VAC phase-to-ground (it could show 0). Verifying zero energy now requires the live-dead-live sequence: prove the meter on the live line side, test every load-side phase pair and phase to ground in V AC, check the control circuit, then prove the meter again. Two probes on one terminal never count, V DC cannot prove an AC conductor dead, and resistance mode shows no reading on energized parts.

Fixed

Levels 4, 5, 7, 8 and 9 now keep your work and offer Retry if the server does not confirm your completion, instead of clearing progress and opening a certificate that was never recorded.

Fixed

Level 5 terminal targets no longer overlap (clicking OUT V+ used to pick the input common), and Reset no longer jumps the pick-and-place back home: after a reset you run a visible Home sequence.

Fixed

Level 6 accepts an electrically equivalent daisy-chained supply (for example +24 V to Start 13 and on to Stop 21), and its hardwired series option can now be completed on the board.

Fixed

Level 9 no longer keeps a green PASS after you change a checked setting (for example switching to No controller); edits clear the affected check and the acceptance test re-checks the current settings.

Improved

Level 7’s wire-number dialog now works fully from the keyboard, the guard switch’s Safety A+/B+ inputs may be tied to +24 V as its instructions describe, and the grounding notes on Levels 7 and 10 now explain that PE and 0 V stay separate because these drawings use a floating 24 V system (a grounded system bonds them at one designated point).

Improved

Level 10: the zero-energy step now spells out the real verification it stands for, Section 10 describes itself accurately as interpreting technicians’ readings, and the pneumatic hint no longer mentions flow controls that are not on the panel. Completion messages on Levels 5, 6 and 7 now show the correct level number.

v1.81

Account Progress for Levels 8–10 & Keyboard-Friendly Wire Numbers

Development build v6.71

Fixed

Save & Exit progress for Levels 8 and 9, and for the Level 10 PLC program and HMI editors, now saves to your account. The progress service had only accepted Levels 1–7, so that progress stayed in the browser you used.

Improved

Level 10 panel wiring, wire numbers, form answers and safety-test evidence are still saved in this browser only, as before.

Improved

The Level 10 Enter Wire Number dialog now keeps keyboard focus inside the dialog, closes with Escape from any of its controls, and returns focus to the tag, list button or terminal you came from.

v1.80

Level 10 — Wire Numbers from Drawing L10-001

Development build v6.70

New

Level 10 now uses the Level 7 wire-identification standard: every electrical conductor you land asks for its wire number from drawing L10-001, and both ends of the conductor carry the same number. Skip leaves a gray ? tag you can label later.

New

Under each electrical panel, a wire-number panel lists your own conductors (with large buttons to label or correct any of them, including on a phone) and the full L10-001 schedule with each conductor’s From and To terminals.

Improved

The +24 V, fused +24 V and 0 V rails are one node each (wires 100, 101 and 200), so a legitimate daisy-chained conductor carries its rail’s number. PE conductors are identified by their green/yellow insulation, EtherNet/IP cables are not wire-numbered, and air tubing is never numbered.

Improved

A panel only passes when every conductor is on the right terminals AND labeled with the right number. Changing a label clears that panel’s earlier pass, and your labels are saved with your wiring.

v1.79

Level 8 — Wire Numbers from Drawing L8-001

Development build v6.69

New

Level 8 now requires you to label each electrical conductor with its number from drawing L8-001, using an in-page wire-number dialog, editable panel tags and a touch-friendly label list.

Improved

Missing or wrong wire numbers prevent commissioning and acceptance, and editing a label clears earlier proofs. Save & Resume keeps your labels; saves from before this change need their wires labeled.

Improved

Legitimate daisy-chain segments have their own schedule numbers, and the analog shield drain (SH-801) is identified separately.

v1.78

Level 10 — Cleaner Wire Routing & Safer Saved Work

Development build v6.68

Fixed

Level 10 wires no longer run across other terminals: a conductor steps sideways into the gap between terminals before dropping to the wireway, so the guard interlock’s unused 33/34 terminals and neighboring drive and contactor terminals stay clear.

Fixed

On phones and narrow windows, the Level 10 wireways now run along the full width of each panel, so wire bundles no longer cross the solenoid bank and other wide devices.

Fixed

Your saved Level 10 wiring is now restored as soon as the page opens, and is never overwritten by an empty page, even if you open Level 10 in a background tab.

v1.77

Level 10 — Terminals Respond Under Wires

Development build v6.67

Fixed

On Level 10, a terminal that already had a wire, or had a wire passing over it, stopped highlighting under the mouse. Every terminal now highlights and selects normally, while wires still draw on top of the devices.

Improved

Hovering a Level 10 wire highlights exactly the conductor that a right-click will remove, even where several wires run side by side in a duct.

v1.76

Level 10 — Realistic Field Devices Replace the Placeholder Cards

Development build v6.66

Improved

The last Level 10 placeholder cards are now realistic device illustrations with blue rings on the actual terminals: the guard interlock, plant air supply, lockable isolation/dump valve, operator pushbutton station, five photoeyes, nine inductive proximity sensors, tank level floats, vacuum pressure switch and nine solenoid coils.

Improved

Sensor and solenoid banks are shown landing on a labeled field junction strip (shared brown/blue or common, plus one signal per device), matching how the exercise is wired. Your wiring and the answer key are unchanged.

Fixed

The guard interlock is now described correctly as two N.C. safety contacts plus one N.O. auxiliary contact, matching its six terminals.

Improved

Wires now stay glued to their terminals whenever any device card changes size, not just when the whole panel does.

v1.75

Level 10 — Readable Notes & Pneumatic Ports on the Fittings

Development build v6.65

Fixed

Level 10 notes, pass/fail results, connection counters and device model numbers were pale text on light cards. They now meet readable-contrast guidelines across the whole level.

Fixed

Every pneumatic port ring on the Level 10 air panel now sits on a fitting. The pick station shows both the horizontal and the vertical cylinder, the two 3/2 valves (vacuum supply and reject) have their own valve stations, and the rod-lock release is its own labeled port.

Improved

The valve manifold exhaust is silenced at the manifold (mufflers), so it is no longer shown as a tube connection, and the cylinder port rings are recentered on their fittings.

v1.74

Level 10 — Acceptance Runs Your Real PLC Program

Development build v6.64

Improved

The Level 10 witnessed acceptance test now runs the PLC program you downloaded. It checks every rung you wrote (mode, start/stop seal, safety and fault drop-out, pump hysteresis with the overload inside the seal, fill permit, speed clamping and alarm latches), then runs a five-bottle plant simulation that only moves when your program commands it.

Fixed

Acceptance now requires the controller to be online in Remote Run with your latest download. A stopped controller, an undownloaded project or a pending online edit is refused.

Fixed

Passing Level 10 now records your completion on your account so the Level 10 certificate can be issued. If the save fails, you see why and can retry instead of reaching a certificate link that does not work.

Fixed

HMI Test Application commands now follow operator roles (Operator can run the cell, Viewer is read-only, Maintenance can reset), and editing the PLC program or HMI after a pass clears that pass until it is checked again.

Improved

Resuming a saved Level 10 session no longer puts the controller in Run automatically. Download your program again, as you would on a real controller.

Fixed

Level 10 forms and section headers now fit on phone screens instead of running off the edge of the card.

v1.73

Level 10 — Wires Land on Terminals, Saved Progress & Real Lockout

Development build v6.63

Fixed

Wires and air tubes on every Level 10 panel are now drawn on top of the devices and land exactly on their terminals and ports. They no longer disappear behind a device or drift off their terminals when a panel scrolls or a photo finishes loading.

Improved

Each Level 10 panel now has a wireway duct above its first row of devices as well as below every row, so conductors leave a terminal and run straight into the nearest duct the way a real panel is wired.

Improved

Level 10 now saves your work in this browser as you go: wiring, drive parameters, the I/O map, the analog form, the hazard and commissioning answers and the safety test evidence all come back after a refresh.

Improved

The Level 10 safety test now models lockout properly: stop the machine, lock the main disconnect and the air dump, then verify zero energy. An E-Stop or guard test only counts when it stops a machine that is actually running.

Fixed

Changing your wiring or an answer after a section has passed now clears that pass until you check it again, and the Drive and Field I/O checks now catch a +24 V to 0 V short like the other panels do.

Fixed

Network commissioning now rejects invalid or duplicate IP addresses and devices on different subnets, and a blank scaling box is no longer read as 0 psi.

v1.72

Privacy Policy, Terms of Use & Support Pages

Development build v6.62

New

Added a Privacy Policy, Terms of Use and a Support & FAQ page, linked from the homepage footer alongside the Standards & Compliance page. Questions can be sent to info@controlstrainer.com.

Fixed

The Level 10 “Get your certificate” button now opens the Level 10 certificate instead of the generic one.

v1.71

Level 5 — Monitored Safe-Exhaust & Vertical Rod Lock

Development build v6.61

Improved

The Level 5 safe-exhaust valve is now truly monitored: its feedback is wired into the safety relay’s reset (EDM) loop, so if the dump valve fails to reach its safe state the relay will not reset and the cell cannot restart.

Improved

Added a spring-applied, air-released rod lock on the vertical axis as the actual load-holding device. When the air is dumped the rod lock mechanically clamps the vertical rod so the load cannot fall — the closed-center valve is now ordinary pneumatic design rather than being relied on as the safety hold.

v1.70

Level 5 — Safety-Rated Pneumatic Stop & Safe-Exhaust Valve

Development build v6.60

Improved

Level 5 now safeguards the pneumatic cell the way a real machine does. The E-Stop is dual-channel and the guard is wired into a 440R safety relay on two independent channels — not as an ordinary PLC input — so no single fault can defeat the stop, and the relay (not the program) drops the machine.

Improved

A redundant, monitored safe-exhaust (dump) valve now sits in the air supply. On an E-Stop or open guard it blocks supply and exhausts the downstream air through its silencer, positively removing the stored pneumatic energy independent of the PLC. The vertical axis runs a 5/3 closed-center valve so dumping the air cannot let it fall, and a monitored Safety Reset — separate from Cycle Start — means the cell can never restart on its own.

Improved

Level 5 also makes clear that the automatic safe-exhaust is not a lockout device: a lockable manual valve isolates and exhausts the supply for lockout/tagout before servicing (OSHA 1910.147 / 1910.212, NFPA 79, ISO 13849).

v1.69

Level 4 — Dual-Channel Safe Torque Off

Development build v6.59

Improved

Level 4 now wires the drive Safe Torque Off the way a real machine does: a two-contact emergency stop drives the two STO inputs (S1 and S2) on separate, independent channels, with no jumper between them. A single welded contact or shorted wire can no longer leave the drive able to run — the fault cannot defeat the stop because the second channel still removes torque (NFPA 79 9.2.5.4).

Improved

Level 4 also makes clear that Safe Torque Off is not electrical isolation: it removes motor torque for a safe stop, but the drive stays energized, so the upstream disconnect must be locked out before anyone services the equipment (OSHA 1910.147).

v1.68

Equipment Names Across the Lessons

Development build v6.58

Improved

The lessons now name the equipment families they model — for example the Allen-Bradley MicroLogix 1400 controller, the PowerFlex 525 drive, CompactLogix 5069 controllers with 5069 analog I/O, and the PanelView Plus 7 operator terminal — so you can look up the kind of hardware you will meet on the job.

Improved

The in-app design tools keep their ControlsTrainer names — the ControlsTrainer 5000 ladder editor and ControlsTrainer HMI Studio — while the devices they configure carry model numbers from those equipment families.

v1.67

Levels 1 & 3 — Cleaner Panel Wireways

Development build v6.57

Improved

On Levels 1 and 3 the factory power wiring now runs down the panel wireway beside the disconnect and the motor starter instead of dropping across the new code-compliance notes, so the grounding, lockout/tagout and motor-branch callouts stay fully readable.

v1.66

Level 8 — Analog Loop Code-Compliance Pass (NEC 250, OSHA)

Development build v6.56

Improved

Level 8 now makes the instrumentation grounding and isolation explicit: the 24 V current loop is derived from an AC supply that keeps its own line-voltage disconnect and overcurrent protection, and the 0 V return, the cable shield, and protective earth are kept distinct — the shield lands at a single point, and the 0 V is treated as a grounded conductor only when it is actually bonded. (It already taught single-point shield grounding; this spells out the rest.)

v1.65

Level 4 — VFD Code-Compliance Pass (NFPA 79, NEC 430, OSHA)

Development build v6.55

Improved

Level 4 now calls out the Safe Torque Off safety function to NFPA 79 9.2.5.4: a Category 0 stop that removes motor torque directly (not through the PLC or drive firmware), overrides every other function, never restarts the drive on E-Stop release, and — for higher risk categories — is driven on two independent channels so no single fault can defeat it.

Improved

Level 4 now spells out the drive power branch to NEC 430: input conductors at 125% of the drive’s rated input current and output conductors at 125% of motor full-load current (430.122), branch short-circuit protection per the drive listing (430.130), the drive-provided motor overload (430.124), and the drive chassis and motor frame bonded to protective earth (250.119).

v1.64

Level 3 — Code-Compliance Pass (OSHA, NEC, NFPA 79)

Development build v6.54

Improved

Level 3 now shows the equipment grounding conductor landed on the pump-motor frame in green/yellow and bonded back to the panel ground, so the motor frame can never become energized (NEC 250.119 / NFPA 79).

Improved

Level 3 now spells out the pump-motor branch protection — overload, upstream branch short-circuit/ground-fault protection, and conductors sized to the motor full-load current (NEC 430.22 / 430.32 / 430.52) — and that the lockable disconnect is the lockout/tagout energy-isolating device (OSHA 1910.147 / NEC 430.102), never the selector, Stop, or the contactor.

v1.63

Level 1 — Code-Compliance Pass (OSHA, NEC, NFPA 79)

Development build v6.53

Improved

Level 1 now shows the equipment grounding conductor landed on the motor frame in green/yellow and bonded back to the panel ground — the way NEC 250.119 and NFPA 79 require every exposed conductive part to be grounded, so the motor frame can never become energized.

Improved

Level 1 now teaches lockout/tagout the right way: the lockable main disconnect is called out as the energy-isolating device you lock out to service the machine — never a Stop button, the E-Stop, or the contactor (OSHA 1910.147). The disconnect also carries realistic nameplate marking (voltage, current, panel short-circuit current rating) per NEC 409.110.

v1.62

Level 9 Operator Terminal — True-to-Life Display Scaling and a Clearer Training Control

Development builds v6.49–v6.52

Improved

The Level 9 operator terminal now renders your HMI the way a real fixed-resolution terminal does: every screen — Overview, Alarms and Settings — is scaled onto the device by the same factor and keeps its designed layout, instead of each display independently zooming to fit whatever it happens to contain. Your built screens fill the glass cleanly and stay consistent as you switch between them.

Improved

The operator sign-in on Level 9 is now clearly marked as a training control, set apart from the terminal itself, so it is obvious you are switching the simulated operator to test what each security level is allowed to do — rather than operating something that lives on the running HMI.

Improved

Level 9 security now teaches the anonymous DEFAULT account — the account in effect before anyone logs in. On a fresh project it holds every security code (a real commissioning trap), and you now have to strip it down to View only so nobody can command the machine without signing in. The acceptance test verifies an anonymous operator is locked out, and you can Log out on the terminal to prove it.

Improved

The Level 9 HMI editor now shows the terminal’s fixed design resolution (800 × 600) while you build a display — reinforcing that you author at fixed coordinates — and the online-edit prompts make clear that testing or untesting a change only swaps which logic executes, never resetting the live machine values.

v1.61

Level 9 Polish — Authentic Editor Behavior and Real-Equipment Guidance

Development builds v6.41–v6.48

Improved

The Level 9 HMI Studio editor now behaves even more like professional HMI-design software: keyboard shortcuts (Delete, Ctrl+Z / Ctrl+Y, Ctrl+X / C / V and arrow-key nudging) no longer fire while you are typing in a tag or property field, duplicated and pasted objects always land inside the display, and the editor is locked while a Test Display or Test Application is running so a live test is never accidentally changed.

Improved

Added on-the-real-equipment guidance throughout Level 9: the dotted controller tags are members of tag structures (UDTs) and the Tag Browser is filtered here as a training aid; the ladder first-out is a PLC diagnostic distinct from the HMI software's own alarm setup; and the four operator roles are a stand-in for the runtime security codes (A–P) you would assign on a real operator terminal.

Improved

When you edit the controller online, the live green power flow now lights up only on the program that is actually executing — so it is always clear whether you are watching the original logic still running or the tested edits you are trying out.

Improved

Level 9 runtime security now works the way real HMI software does: every command carries a security code (A–F) and each account is granted the codes it needs, shown in a grant table. You assign each command the code that its authorized users hold, and access is enforced by the codes a user actually has — a higher role no longer automatically inherits every lower permission, exactly like a real operator-terminal project.

Improved

Level 9 now finishes on an operator terminal. At the bottom of the run section, your completed screens run on an operator-terminal image with your live HMI on its screen, automatically sized to fill the display so the objects are never cramped — with the runtime role login right above it, so you see and operate your interface the way it looks mounted on the machine, driving the live conveyor.

Improved

The Level 9 ladder editor now gives every rung more room: the instructions on a rung — and inside parallel branches — are evenly spaced so each contact and its tag name stands clear of its neighbors, matching the clean, readable layout of professional ladder-logic software.

v1.60

Level 9 HMI Machine Interface — Build the Operator Screens and Program the PLC That Actually Executes

Development builds v6.24–v6.40

New

Level 9 — HMI Machine Interface — is live. You build a complete operator-terminal interface for an automated inspection conveyor, end to end: classify every controller tag the HMI can touch, design the operator screens, program the safe PLC command handshake, enforce operator security, then run the live machine and pass a 10-point acceptance test — and the whole time the HMI only sends requests while the PLC keeps control.

New

Design the operator screens in ControlsTrainer HMI Studio, an industrial HMI editor. Drag status lamps, pushbuttons, a numeric setpoint entry, an auto/manual selector, alarm banners and a safety annunciator onto the Overview, Alarms and Settings displays, bind each object to the correct machine-status or HMI-request tag through a Tag Browser filtered to what that object is allowed to touch, and Test Display or Test Application to run your screens live — with real security roles — before the machine is even running. The editor works like the real software: click to select, drag to move, right-click or press Delete to remove an object, with Duplicate, cut/copy/paste, Undo/Redo and arrow-key nudging.

New

Program the PLC interface logic in ControlsTrainer 5000, a professional ladder-logic editor. Complete the command handshake, mode, speed-clamp, first-out and acknowledge rungs — dragging instructions onto the rungs, right-clicking to cut, copy, paste and delete, and undoing and redoing — then Verify the program. Verify is a real compile check: empty cells, undefined or wrong-data-type tags, and writes to protected tags are reported in an Output window, and you double-click an error to jump straight to the offending rung.

New

Download the program to the controller and change it to Remote Run, and your ladder actually executes and drives the conveyor. Because the machine runs the logic you wrote, a valid but incorrect program will misbehave and fail exactly the acceptance checks it gets wrong — a Stop that does not stop, a setpoint that is not clamped, a first-out that captures the wrong fault — just as you would find a logic error on the job. Online you watch your own rungs solve in live green, monitor every tag value and data type, and see the controller task scan time.

New

Edit the running controller online, the way a commissioning engineer does. With the controller in Remote Run, Start Pending Rung Edits to change the logic on a live machine, Verify and Accept your edits into the controller, Test them to run the modified logic while the conveyor keeps going, then Untest to fall back to the original or Assemble to make the change permanent — the machine never stops. The offline edit, Verify and Download path is still there for your first build.

New

The interface is engineered for safety the way a real machine is: every operator button writes a momentary request and the PLC decides, the run seals in only with the safety, auto and no-fault permissives, the speed setpoint is clamped in the controller, first-out alarm capture with an acknowledge that never clears the fault, and role-based security across Viewer, Operator, Maintenance and Administrator. An E-Stop or open guard drops the conveyor independent of the program, and a fresh Start is always required — the machine can never restart on its own.

v1.59

Level 8 Analog Process Control — Commission a 4-20 mA Level Loop End to End

Development build v6.23

New

Level 8 — Analog Process Control — is live. You commission a 4-20 mA surge-tank level loop from start to finish: select the instruments, assign and scale the analog I/O, wire the two current loops, configure the control action and the high and low level alarms, then hold setpoint on a live operator terminal.

New

Wire analog devices terminal to terminal — a 2-wire, loop-powered level transmitter and a control valve on an analog-input module and an analog-output module — with the cable shield landed at a single ground point, exactly as you would in the field.

New

Tune and prove the loop on a live process, then troubleshoot a faulted transmitter and pass the acceptance test.

v1.58

Clear Pricing Up Front — Free Levels First, with an Introductory Sale

Development build v6.22

Improved

The one-time $49.00 Full Access price is now shown up front — both before and while you sign up. A Full Access pricing panel sits right in the training levels, the note under the hero states it, and the same $49.00 now appears on the create-account page and the unlock page, so you always know exactly what it costs — no subscription, no renewals.

Improved

The two free levels — Guided Motor Starter and Troubleshooting — now lead the training levels, each clearly marked FREE with no account required, above the Full Access pricing panel and the advanced levels it unlocks.

New

Full Access is running an introductory sale — a limited-time offer — called out with the price everywhere it appears.

Improved

The unlock page’s included-levels list was refreshed to the current lineup: Automatic Pump Control, VFD Conveyor Commissioning, Pneumatic Pick & Place Cell, Controls Engineer and the Technician Challenge, with Levels 8–10 on the roadmap.

v1.57

Wire It Like the Real World — Hardwired Series Control on Levels 1, 3 and 6

Development build v6.21

New

You can now wire the motor-control circuit the way real panels are built — a hardwired series control string where power flows device to device (Stop → Start → contactor coil → Overload, through the E-Stop) and the contactor 13-14 seal-in aux holds it in — as a fully-accepted alternative to home-running every device to the PLC. On Level 1 (motor starter) and Level 6 (inspection conveyor) it runs the motor independent of the PLC; on Level 3 it is a hardwired float control that fills the tank automatically with no PLC at all.

Fixed

The wiring checker now validates the control circuit by electrical continuity — whether the series loop actually closes, and whether each safety contact (Stop, Overload, E-Stop) truly breaks it — instead of demanding one exact set of wires. The contact order can vary and the supply / 0 V rails can be jumpered just like the field, and the on-screen feedback now names exactly which leg of the loop is still open. Thanks to reddit user MagmaTroop for suggesting series control wiring.

v1.56

Level 6 Controls Engineer — a Control Panel, a Live Operator Terminal, and a Neatly Wired Cabinet

Development build v6.20

Improved

Level 6’s control wiring is now laid out on a painted-steel subpanel. The 24 VDC supply, controller rack, safety relay, contactor, overload, field devices and pilot lights mount on four DIN-rail rows, and every conductor routes through slotted wire-way ducts and side wireways the way a commissioned cabinet is wired.

Improved

The HMI is now an operator terminal with a live screen: working START / STOP / RESET soft keys that command the conveyor, live RUN and REJECT pilots, and the dual-channel E-Stop safety annunciator — press the E-Stop and watch the safety relay drop the conveyor independent of the PLC.

Improved

The motor power block is now in correct across-the-line starter order — Contactor → Overload → Motor — with the overload in the power path next to the motor.

v1.55

Level 5 Pneumatic Pick & Place Cell — a Photorealistic Machine, Mounted and Wired Like the Real Thing

Development build v6.11

New

Level 5 — the Pneumatic Pick & Place Cell — now runs on a photorealistic two-axis machine. When you commission the cell and start a cycle, a guided pick-and-place head traverses the overhead rail, the cylinder strokes the gripper down onto the part, lifts it off the infeed nest, carries it across the cell, and sets it down on the outfeed nest — animated in real time from your own sequence logic. A fresh part then appears at the infeed for the next cycle.

Improved

The pneumatic circuit is now built the way it is in the field. The three valves live on one 3-station manifold with a shared supply and a common exhaust silenced by two compact sintered-bronze mufflers — the oversized muffler bank is gone. You plumb the FRL to the manifold supply and run each valve’s work ports out through the meter-out flow controls to the cylinders and gripper, with flexible push-connect tube routed straight from fitting to fitting on the mounting subpanel.

Improved

The electrical control wiring is now laid out on a control panel. The 24 VDC supply, PLC, field sensors, guard switch, E-Stop and the valve solenoid coils are mounted as modules on the subpanel, and every conductor routes through slotted wire-way ducts and side wireways the way a commissioned cabinet is wired — so you can trace each wire end to end.

v1.54

Level 4 VFD Conveyor Commissioning — Photorealistic Drive, Wiring Board & a Motor Nameplate to Read

Development build v6.04

New

Level 4 — VFD Conveyor Commissioning — has been rebuilt to the same realism bar as the other levels. You commission a variable frequency drive on a packaging conveyor end to end: read the motor data, assign the PLC I/O, wire the control circuit, set the drive parameters, choose the command strategy, and run the acceptance test.

New

Read the motor data off the nameplate. Section 1 now shows the conveyor motor’s nameplate — you read the rated voltage, base frequency, full-load amps, RPM and horsepower straight off the plate and enter them, instead of copying them out of the work order, exactly as you would on the job.

New

The PLC/VFD control-wiring board is fully photorealistic. You wire the device images terminal to terminal — a compact PLC, an analog-output module, the VFD control terminal strip, an E-Stop, and the drive’s Safe Torque Off safety block — with the conductors routed through wire ducts in NFPA-79 colors.

New

Commission and prove the drive on an interactive VFD keypad with a live display, then watch the packaging conveyor run beneath it at the speed you command. An emergency stop removes motor torque through the drive’s hardwired Safe Torque Off, independent of the PLC, and the acceptance test proves it.

v1.53

Wire Controls in Series — the Real-World Way (Levels 1 & 3)

Development build v6.03

New

On Levels 1 and 3 you can now wire the control circuit the way it is actually done in the field — device to device, in series — as a fully accepted alternative to the home-run/PLC wiring, with no mode to switch. In the real world, pushbuttons, switches, pilot lights and safety contacts are not each home-run to the power supply; power flows through one device to the next. The level recognizes and completes on either way you wire it, and the original PLC wiring still works exactly as before.

New

Level 1 accepts the classic 3-wire motor-starter control string: +24 V through the E-Stop and Stop contacts (both normally-closed), through the Start pushbutton, to the contactor coil and out through the overload — with the contactor 13-14 auxiliary wired as the seal-in across Start so the motor holds in after you release the button. Press Stop, press the E-Stop, or trip the overload and the series string opens and the motor drops out, exactly as on a real panel.

New

Level 3 accepts a real hardwired float control — a no-PLC pump panel. The selector's AUTO leg feeds the high float's normally-closed contact, then the low float (with the 13-14 seal-in across it), the E-Stop, the coil and the overload. The low float starts the fill, the seal-in holds the pump in as the level rises past the low mark, and the high float's NC contact stops it at the top — fully automatic tank filling with no PLC at all, entirely from your own series wiring. HAND runs it manually.

Improved

Thanks to Reddit user MagmaTroop for suggesting this — for the reminder that in the real world controls are run in series, not each landed straight on the power supply.

v1.52

Level 3 — New Automatic Pump Control Lesson

Development build v6.02

New

Level 3 is a brand-new interactive lesson — Automatic Pump Control. Wire a HAND/OFF/AUTO selector and the low and high float switches on the day tank to the PLC, then program the automatic fill logic so the M1 transfer pump keeps the tank topped off. In AUTO the pump starts on the low float and stops on the high float, held by a seal-in latch so it does not short-cycle; HAND runs it manually; OFF stops it.

New

A live pump-station simulation drives the whole lesson: the photorealistic pump and day tank fill and cycle in real time from your own ladder logic, the float switches and the tank-level readout respond to the level, and the E-Stop is hardwired in series with the contactor coil — exactly as on the real machine.

v1.51

Training Levels Reordered by Difficulty — the Interactive Troubleshooting Bench Is Now Free

Development build v6.01

Improved

The seven training levels have been reordered so difficulty builds more smoothly from the fundamentals up to the capstone. The new lineup is: Level 1 Guided Motor Starter, Level 2 Troubleshooting, Level 3 Automatic Pump Control, Level 4 VFD Conveyor Commissioning, Level 5 Pneumatic Pick & Place Cell, Level 6 Controls Engineer, and Level 7 Technician Challenge (the 180° indexing-turret capstone). Existing links and saved progress continue to work.

New

The interactive Troubleshooting Bench is now a FREE level (Level 2). Anyone can run the full hands-on workflow — set up a realistic Fluke 87V multimeter, probe the live control panel to find where the 24 V control voltage is lost, then lock the machine out and make the repair — before unlocking the advanced levels with one-time Full Access.

v1.50

Level 1 — Rebuilt Motor Starter Lab with a Photorealistic Pump Station That Fills a Day Tank; Level 4 Refinements; Refreshed Homepage

Development build v6.00

New

Level 1 — the Motor Starter Lab — has been rebuilt to the same realism bar as Levels 3 and 4. The exercise now sits in a proper cabinet subpanel with wire ducts on every side, the devices are arranged in logical wiring order in realistic proportions with engraved nameplates, the main disconnect is shown as the incoming 3-phase power source, and the control wiring is rendered in NFPA-79 colors (24 V control blue, 0 V return white with a blue stripe, 3-phase black) matching Level 3. The wiring task itself is unchanged — you still wire the control circuit — it simply looks and feels like a cabinet.

New

The machine Level 1 drives is now a photorealistic M1 transfer-pump station. Wire the starter correctly and start the motor, and the pump comes to life — water flows through the discharge piping and the day tank fills gradually from empty, with the inlet stream, surface splash and rising level all shown. Stop the motor and the inflow stops immediately, and the tank holds whatever level it reached.

Improved

Level 4’s troubleshooting bench received several refinements: the guided auto-solve walkthrough now works on the new bench; the operator terminal no longer shrinks when you switch to the alarm screen; a “Check if Complete” button under the conveyor lets you confirm the repair before the certificate is issued; the conveyor visibly runs while the motor is running; incoming utility power is now shown live on the line side of the main disconnect even when it is open (reinforcing the lockout/tagout lesson); and the meter’s test leads no longer appear until you actually connect a lead to a terminal.

Improved

The homepage preview carousel has been refreshed with new, higher-quality banners — interactive industrial automation training, PLC wiring & panel layout, the pump-station simulation, and HMI, safety & sensors.

v1.49

Level 4 — New Interactive Troubleshooting Bench: Diagnose a Faulted Conveyor with a Working Meter, then Lock Out & Repair

Development build v5.99

New

Level 4 is a brand-new interactive troubleshooting bench that replaces the previous Level 4. You are dispatched on service call CT-401: a packaging conveyor has faulted and will not restart. Using a realistic Fluke 87V digital multimeter, you set the meter function, pick up a test lead, and probe the live control panel to find where the 24 V control voltage is lost — then lock the machine out and make the repair.

New

Every device on the panel is a probeable device image — main disconnect, control fuse, 24 VDC supply, the PLC, Start and Stop pushbuttons, motor contactor, motor overload and the 3-phase motor. Each terminal is live: click a lead on the meter (red at the VΩ jack or black at COM), then click a terminal on a device to land it, and the meter reads the actual voltage or resistance at that point. A red or black test-lead wire follows from the meter to the terminal you land on. Reversing the leads reads a negative voltage, just like a real meter, and an open circuit reads OL.

New

A real, diagnosable fault sits in the control circuit: the 24 V control voltage is present at some test points and missing at others, and it is up to you to isolate where it is lost by taking readings — the level never tells you which component failed. Probing across the open point reads the full voltage drop, exactly as it would on a real panel. Hovering any terminal shows its label and a plain-language description of what it is.

New

Lockout / Tagout and repair are hands-on: verify zero energy on the meter, then take a hasp, lock and tag from the lockout station and apply them to the de-energized disconnect before replacing the faulted component. The repair step asks you to identify which component to replace, and it is only accepted once you have actually diagnosed the fault — so the level cannot be short-cut.

New

The bench is alive around you: a live operator terminal annunciates the machine fault, an animated conveyor stops and restarts with the machine state, and the alarm banner reflects the PLC inputs and outputs in real time. Completing the repair restores the conveyor, issues your Level 4 certificate, and your progress saves and resumes like the other levels.

v1.48

Level 3 — Factory-Wired Power Distribution on the Panel, and Motor Removed from the Board

Development build v5.98

New

The factory power-distribution hardware on the panel — the main disconnect, the 3-pole motor branch breaker and the 1-pole control-power breaker — is now shown PRE-WIRED. Factory conductors run from the incoming disconnect, through the branch breakers, and on to the motor contactor and the 24 VDC control supply, routed through the same wire ducts as your own wiring — so these devices read as factory-wired context instead of empty parts sitting at the top of the panel. The conductors are non-interactive (you do not land them) and carry no wire numbers.

Improved

The turret motor is no longer shown as a separate device on the wiring board. Its 3-phase power path is entirely factory pre-wired and was never part of your wiring task, so the motor now appears where it belongs — as the load at the end of the motor branch in the factory power one-line (main disconnect → motor breaker → contactor → overload → motor). This removes a device that could look wireable when it is not; every component you actually wire is unchanged.

Improved

Conductor colors on the factory power wiring follow the US panel standard (NFPA 79): line-voltage phase legs are black, the grounded neutral is white, and protective earth is green/yellow — matching the net-based colors already used on the wiring board (all ungrounded 24 VDC control/signal blue, the 0 VDC return white with a blue stripe). No wiring, wire numbers, terminal assignments or validation changed.

Improved

The live operator terminal in the HMI & Safety Test section now behaves like a real powered display: while the panel is de-energized its screen is solid black (only the operator-terminal bezel shows), instead of a dimmed screen with an offline message. It lights up and annunciates as before once the HMI is energized/online. Display only — the safety logic and validation are unchanged.

Improved

Presentation only. The electrical model, union-find validation, the wire schedule, PLC I/O, the HMI safety logic, RUN simulation and save/resume are all unchanged, and every existing exercise remains completable.

v1.47

Level 3 — Catalog-Correct Input Module, Full Power Architecture & Grounding, Visible Turret Motor, and Per-Stage Wire-Number Checks

Development build v5.97

Improved

The DC input module is now a 16-point input module — the previous 8-point part shown was not an actual catalog part. It is now shown as a device image matching the controller and its output module — a single-column 18-position RTB with terminals I00–I15 and two No-Connect positions, following the manufacturer drawing. Your existing input assignments (I:0/0–I:0/6) are unchanged. This module has no on-board common: its inputs return through the backplane to SA(−) at the controller, so the "input common" now correctly lands on the controller's SA− terminal (wire 201) instead of a DC-COM that does not exist on the module.

New

The controller now shows its two power inputs — MOD (system/backplane) and SA (sensor/actuator field) — as the manufacturer separates them. Both are fed from one 24 VDC supply on this build, with a teaching note that production panels often use separate MOD and SA supplies so a field fault cannot reset the controller.

New

A documented power architecture: an incoming main disconnect that isolates the whole cabinet, a 3-pole motor branch breaker, and a 1-phase control-power branch breaker — so the power hierarchy reads correctly (the motor breaker is not the cabinet's incoming protection). A documented load calculation confirms one power supply (24 VDC, 3 A) carries the whole cabinet — HMI, controller, I/O, safety relay, guard, contactor coil and sensors ≈ 1.69 A steady (56%) — calculated from the manufacturer and Schneider data sheets. The HMI is specified as the 7-inch Series B operator terminal the supply is sized for.

New

A dedicated green/yellow protective-earth terminal strip, TB-PE, joins TB1/TB2/TB3 at the enclosure boundary. It bonds the incoming supply PE, enclosure, door, power-supply PE, DIN rail/contactor and motor frame into one continuous protective-earth system — kept electrically distinct from TB3 (0 VDC). Protective earth, 0 VDC common and functional grounding are now clearly separated. The PE bonds are factory-prewired and shown for understanding, not student-numbered.

New

The three-phase turret drive motor is now visible in the field in its own TURRET DRIVE area beside the machine sensors, showing its U/V/W power and its frame protective-earth connection. Its 3-phase power path (main disconnect → motor breaker → contactor → overload → motor) stays factory pre-wired, shown but not part of your wiring task.

Improved

The terminal blocks now distribute power the way a real panel does. TB2 (+24 V), TB3 (0 V) and TB-PE are true feed-through blocks like the gray TB1 — field wiring lands on the field side of a terminal and panel wiring on the panel side, with a factory jumper combing the panel side of TB2/TB3 into a +24 V / 0 V bus. The 24 VDC supply therefore carries exactly one +24 V and one 0 V conductor to the blocks, and every device — including the safety-relay coil (A1/A2), the output-module V+ and the contactor-coil return — taps the bus instead of piling extra wires onto the supply's two terminals. Grading now checks the correct SIDE of each terminal, so a supply feed on the field side (or a field lead on the panel side) is caught.

Improved

The main disconnect, the motor branch breaker and the control-power branch breaker are now shown as device images (a fused disconnect, a magnetic-only motor-circuit protector, and a control-power breaker), and the turret motor as a 5 HP, 9-lead motor — replacing the earlier schematic cards. The motor breaker is sized for the motor's full-load current and coordinated with the existing overload relay.

New

The HMI & Safety Test panel is now a live operator-terminal screen — a Controls-Trainer display recreated in the browser (not a static picture) that reacts to your work in real time: RUN / STOP / FAULT status tiles, a "Station Ready" lamp, a 180° indexing-turret graphic, and per-point I/O LEDs — I:0/0 Cycle Start, I:0/1 Stop, I:0/2 Photoeye, I:0/3 Guard Aux, I:0/4 Turret Home, I:0/5 180° Prox, I:0/6 Safety Relay Status — all driven by the actual simulation. It annunciates HMI OFFLINE, SAFETY NOT COMMISSIONED, SAFETY OK — READY, SYSTEM RUNNING, E-STOP ACTIVE, GUARD OPEN, RESET REQUIRED and control faults. The E-Stop is shown correctly as a hardwired safety condition on the safety relay — never as a PLC input — and there is no conveyor (this is the 180° indexing turret). The safety circuit and validation are unchanged and remain authoritative; this is a visual/UI upgrade. The physical operator terminal on the cabinet stays a wireable device, and its screen now lights up once you complete its EtherNet/IP link.

Improved

Conductor colors now follow the shop wiring standard, traced by electrical NET/function (not by device cable color or terminal-block color): +24 VDC and DC control/signal conductors are solid blue; the 0 VDC common/return is white with a blue stripe; protective earth (PE) is green with a yellow stripe; AC line/power is black and AC control is red (the motor branch is factory-wired). Because it is net-based, a sensor's blue 0 V lead is drawn as a 0 V return (white/blue-stripe) even though its cable is blue, and its brown +24 lead is drawn as +24 V (blue). The 0 VDC common is a return, kept distinct from protective earth.

Improved

Each wiring stage now checks wire identification independently of the connections. The Safety and Control stages each verify that every required conductor is both landed on the correct terminals AND carries its correct wire number from drawing L3-001 — a complete connection with a missing or wrong number does not pass, and a wrong connection is never excused by entering the expected number. Feedback names the exact conductor (for example, "E-Stop 11 → Relay S11 is wire 503, you entered 501"). The system only enforces numbers that actually appear on the drawing, so a stage can never demand a number the schedule doesn't list.

Improved

The approved wire-routing/rendering, the union-find electrical validation, the duct network, RUN simulation and save/resume are unchanged — the electrical model was updated only where the verified hardware change required it (the input module common), and every existing exercise remains completable.

v1.46

Level 3 Panel Reorganized — Operator Station, Safety Devices, Machine Sensors + Bigger, Easier Terminals

Development build v5.95

Improved

The Level 3 field is now organized the way a real machine is: an OPERATOR STATION (the operator terminal plus the Reset, Cycle Start and Stop pushbuttons), SAFETY DEVICES (the E-Stop and the guard-locking switch), and MACHINE SENSORS (the photoeye and the two proximity sensors). Each stays a fully independent device — this is visual organization only.

Improved

The operator terminal moved out of the internal control enclosure and into the operator station, where an operator terminal actually lives. Its EtherNet/IP link back to the controller is unchanged.

Improved

Components are larger and easier to work with. Devices that had become small after the wire-duct redesign — especially the controller I/O modules and other terminal-dense parts — were enlarged so every terminal is clearly visible and comfortably clickable. Each terminal also has a generous invisible click/tap target so you won't miss a connection by a few pixels, sized to never select the wrong neighboring terminal. The board is larger and scrolls; nothing was shrunk to fit.

Improved

The PLC now reads as a real rack assembly — the controller and its input and output modules sit together as one abutting rack on a shared DIN rail, with the power supply as its own independently mounted device. Wire-number tags sit just off their terminals and are spaced so they stay readable and never overlap each other, even on the dense terminal strips and the safety relay.

Improved

Purely a layout and usability change. All wiring, wire numbers, the wire schedule, terminal-block boundary, duct routing, safety/control stages, PLC I/O, HMI behavior, RUN simulation, Step Back/Clear and save/resume are unchanged.

v1.45

Level 3 Wiring Board Now Routes Through Realistic Wire Ducts

Development build v5.94

New

Level 3 now looks like a real control panel. Devices are arranged on fixed rails (power and PLC on top, safety and motor control below, terminal blocks at the bottom), with the field devices shown outside the enclosure. Your conductors leave each terminal, drop into the nearest slotted wire duct, travel horizontally and vertically through the duct network, and land at the destination — instead of drawing straight diagonal lines across the board.

New

Related conductors bundle together in shared duct runs, and the terminal blocks (TB1/TB2/TB3) now clearly mark the transition between field/machine wiring and internal panel wiring — a core panel-building skill.

Improved

Wires now route behind the equipment and through the ducts rather than over the device faces. Step Back and Clear Wires work exactly as before — the wiring re-routes automatically, and the panel and ducts stay in place.

Improved

This is a visual/rendering change only. Your electrical connections are checked exactly as before — the physical routing and the electrical correctness are independent systems.

v1.44

Level 3 Safety Rebuilt Around an OSSD Guard-Locking Switch

Development build v5.93

Improved

Level 3's guard is now an OSSD guard-locking switch, shown with an M12 8-pin connector, instead of a simplified NC contact. Its two OSSD safety outputs land on the second input of the dual-input safety relay (Safety A to S32, Safety B to S42), and its auxiliary output reports door/lock status to the PLC. The guard therefore both forces a safety stop independent of the PLC and is monitored for HMI indication and cycle-start interlock.

Improved

The E-Stop and the guard are now monitored as two separate safety inputs (relay AND logic). Opening either one drops the motor contactor independently of the PLC program, and closing the guard does not auto-restart the turret — a safety reset and a fresh Cycle Start are required. A new functional test proves this on your own wiring.

Improved

Corrected the motor-branch descriptions: the contactor is factory-wired to the motor through the overload, not directly. The coil string runs through the overload 95-96 auxiliary, and relay status reaches the PLC through the D22R2's solid-state Y32 aux.

Improved

Terminal labels, hover tips, hints, the wire schedule, and validation were all updated to the manufacturer's terminal designations. The circuit is a training example and does not by itself certify a PL/SIL/Category rating for any given machine — that depends on the full machine risk assessment.

v1.43

Run the Machine by Pressing the Panel Buttons, Pilot Lights & Clearer Terminals

Development build v5.92

New

You can now run the machine by pressing the actual field devices. On Levels 3 and 5, click the Start, Stop, and reject devices right on the wiring board to run and stop the machine. They behave like true momentary pushbuttons — press Start and the machine keeps running through your ladder's seal-in, press Stop and it drops out — exactly like a real control panel, with no separate test panel.

New

Level 5 now has working pilot lights. A green light turns on while the conveyor is running and a red light turns on when a part is rejected. Both are driven by the outputs in your own PLC program, so they only light up if you assign, wire, and program them correctly.

New

Level 3's stack light now illuminates while the turret is running, driven by your program.

Improved

More wiring terminals show a label on hover. The Start and Stop pushbutton contacts (13/14 and 21/22) and the contactor coil terminals (A1/A2) now display their marking and purpose when you point at them, matching the rest of the board.

Fixed

Fixed missing device images on Level 5. The controller rack modules, the safety relay, and the dual-channel E-Stop photos now load correctly.

v1.42

Guided Level Progression, Save & Resume, and a Redesigned Level 3 & 5

Development build v5.90

New

Guided progression: finish a level to unlock the next one. Your homepage now shows each level as Passed, In progress, ready to Start, or Locked until you complete the one before it. Levels 1 and 2 stay open to try any time.

New

Save and Resume: a Save & Exit button on every lesson lets you stop whenever you like and pick up exactly where you left off. Lessons with saved work show a Continue button on the homepage.

Improved

Terminal magnifier and labels: hovering a wiring terminal now enlarges it and shows its marking, so tightly packed blocks like the PLC modules, power supply, and safety relay are far easier to read and wire accurately.

Improved

Levels 3 and 5 were rebuilt around a modern controller rack and a dual-channel safety relay. The safety circuit is now wired separately from the control circuit, and the HMI annunciates the emergency stop over EtherNet/IP, following common industrial practice.

v1.41

Hardwired E-Stop Behavior, Free Certificates & Accuracy Fixes

Development build v5.80

New

Several lessons added simulated hardwired E-Stop behavior that drops the contactor independently of the PLC program. On Level 1, for example, the E-Stop’s normally closed contact is wired in series with the contactor coil (PLC output to E-Stop 21, E-Stop 22 to coil A1), so pressing it drops the motor even while the program commands RUN; twist to release and restart.

New

Level 6 now wires the emergency stop into the VFD's hardwired Safe Torque Off (STO) inputs, and Level 7 returns every valve solenoid common through the E-Stop, so an emergency stop removes power from all the directional valve solenoids independent of the PLC.

Fixed

The Level 1 and Level 2 completion certificate now works. Finishing the free motor-starter lessons opens a printable certificate of completion (it previously led to a missing page).

Fixed

Level 6's VFD parameter examples were updated from older-generation drive numbering (such as A092/A093) to PowerFlex 525-style parameter numbers.

Fixed

On Level 7, the 5/2 valve exhaust ports (3 and 5) now each vent through their own muffler instead of being tubed to one another, the cylinder position sensors are now magnetic reed sensors instead of inductive proximity sensors, and the guard is now a proper normally-closed safety switch instead of a capacitive proximity sensor.

Improved

Level 4 troubleshooting is more realistic: an open PLC input common now leaves +24 V present at the input terminals (the module simply cannot sense it) — exactly how a technician tells an open common from a dead control fuse with a meter — and the hardwired E-Stop is now part of the circuit and can be one of the hidden faults.

Improved

Level 3's optional decoy devices (the interposing relay, stack light, and reset pushbutton) are now drawn as labeled device images instead of plain placeholder cards.

Improved

Accessibility: the homepage showcase no longer auto-advances for visitors whose device requests reduced motion, wiring status messages are now announced to screen readers, and keyboard focus is now clearly outlined across the site.

v1.40

Wiring Zoom & Desktop Terminal Magnify

Development build v5.74

Improved

On desktop, hovering the mouse over a wiring terminal now magnifies it into a large, clearly highlighted target — a big help on tightly spaced blocks like the PLC I/O row, where it was easy to click the wrong terminal. The magnify is centered on the terminal, so connected wires stay attached. This applies to every wiring board.

New

On phones and tablets, the wiring board now has a zoom control (minus / plus buttons, plus two-finger pinch) that spreads the device terminals apart so close terminals are easy to tap; drag with one finger to pan around the enlarged board. Available on Levels 1, 2, 3, and 5.

v1.39

Mobile Ladder & Wiring Usability

Development build v5.73

Fixed

On phones and tablets, the Ladder Logic Editor's editing controls — the per-instruction delete button, the drag handle, and the parallel-branch delete — could not be reached, because they only appeared on mouse hover. Tapping a rung to select it now reveals that rung's controls, so touch users can change instructions and remove contacts and branches.

Improved

The wiring board terminals now present larger touch targets on phones and tablets, making it easier to place wires with a fingertip. The tightly-spaced PLC and contactor terminal blocks stay compact so their tap zones do not overlap.

v1.38

Ladder-Logic Ladder Editor & Contactor Terminal Fix

Development build v5.72

Fixed

On Levels 1 and 2, the Contactor M1 terminals no longer lined up with the updated Schneider TeSys D photo, so the coil (A1/A2) and load (T1/T2/T3) terminals could not be clicked to place wires. The terminal hotspots are now realigned to the new photo, and the contactor's incoming power terminals (L1/L2/L3) and auxiliary contacts (13/14 NO, 21/22 NC) appear as clickable, labeled spares — matching Levels 3 and 5 — so nothing on the photo is a dead zone.

Improved

The Ladder Logic Editor on Levels 1, 2, 3, and 5 has been restyled to read like a ladder-logic editor: a clean white canvas with dark power rails, the rung wire running through the contacts, tag names shown as plain text above each instruction, and simple numbered rungs. The editing controls (the XIC/XIO type selector, delete buttons, and drag handles) now appear only when you hover an instruction or select a rung, so a finished program reads like a live PLC monitor instead of a web form.

Improved

In RUN mode, a true instruction now highlights green on the instruction itself — its contact symbol and tag — instead of filling the whole box, and the green no longer bleeds onto the rung wire between devices, matching how an online ladder editor shows power flow.

v1.37

New Contactor Photo (Levels 3 & 5)

Development build v5.71

New

Replaced the Contactor M1 image used on Levels 3 and 5 with a clearer, fully labeled image of a Schneider Electric TeSys D contactor. The old image's load terminals were printed "L1/L2/L3" even though the wiring logic always treated them as T1/T2/T3 — the new image shows T1/T2/T3 on both the overlay and the terminal block.

New

The new photo also shows the contactor's incoming power terminals (L1/L2/L3) and its auxiliary contacts (13/14 NO, 21/22 NC) for the first time — all now clickable (they're not part of this lesson's required wiring, same treatment as the guard switch and overload relay's spare contacts) so nothing on the photo looks like a dead zone.

v1.36

Level 6 Photo-Realistic PLC & VFD Terminal Strips

Development build v5.70

New

Level 6's PLC Digital Output and PLC Digital Input modules — previously two separate generic terminal cards — now render as a single compact-PLC image, matching every other level's PLC card. The VFD Control Terminals card now shows a VFD control terminal strip image instead of generic circles, with the unused terminals (spare inputs, AI2, AO1, and the extra relay contacts) still clickable so nothing looks like a dead zone.

Improved

Added a caption noting that the VFD's COM terminal is the shared digital common for both the RUN/RESET command wiring and the FAULT relay return, since that's not obvious from the photo alone.

Improved

Added a mobile "swipe right for more devices" hint, matching every other level's wiring board.

v1.35

Level 5 Photo-Realistic Wiring Board

Development build v5.69

New

Level 5's wiring board now uses the same photo-realistic device art as Levels 1, 2 & 3 — the 24 VDC supply, pushbuttons, guard switch, overload relay, photoeye, reject sensor, PLC, contactor, motor, and reject solenoid all render as device images with calibrated clickable terminals. The board lays out with the same flowing, wrapping layout as Level 3 so any combination of selected hardware fits cleanly. The Green/Red Pilot Lights and Time Delay Relay keep the original generic terminal card since no matching photo exists for those yet.

Improved

The conveyor motor is now required to be wired to the contactor (T1/T2/T3 on both), consistent with the same change already made on Levels 1, 2 & 3 — previously Level 5's motor had no load-side wiring at all.

Improved

The PLC input and output modules are separate selectable components in this lesson's hardware list, but they're one physical PLC on the real hardware — they now render as a single combined PLC image showing whichever side(s) you've selected, instead of two duplicate PLC cards.

Improved

Added a mobile "swipe right for more devices" hint, matching every other level's wiring board.

v1.34

Level 3 Photo-Realistic Wiring Board

Development build v5.68

New

Level 3's wiring board now uses the same photo-realistic device art as Levels 1 & 2 — the power supply, pushbuttons, photoeye, home/180° proximity sensors, PLC, contactor, motor, and overload relay all render as device images with calibrated clickable terminals, instead of generic labeled circles. Since Level 3's board only shows the components you actually selected in Step 1, the wiring layout now flows and wraps automatically instead of using a fixed grid, so any combination of selected hardware still lays out cleanly.

New

Added a photo for the required Guard Switch (guard-locking safety interlock), the one device that didn't already have matching art, along with an NC/NO caption (11-12 = NC safety, 21-22 = NO spare) matching the overload relay's labeling.

Improved

The turret motor is now required to be wired to the contactor (T1/T2/T3 on both), consistent with the same change just made on Levels 1 & 2 — previously Level 3's motor had no load-side wiring at all.

Fixed

Wires drawn across the board could visually cross over a terminal button on another device and intercept the click meant for that button, the same issue already fixed on Levels 1 & 2. Undo/Clear Wires remain the way to remove a wire.

Improved

The PLC input and output modules are separate selectable components in this lesson's hardware list, but they're one physical PLC on the real hardware — they now render as a single combined PLC image (matching Levels 1 & 2) showing whichever side(s) you've selected, instead of two duplicate PLC cards.

Improved

Added a mobile "swipe right for more devices" hint, matching every other level's wiring board.

v1.33

Motor Load Wiring Is Now Required (Levels 1 & 2)

Development build v5.67

Improved

The contactor's T1/T2/T3 load terminals and the motor's T1/T2/T3 terminals were previously decorative spares. Wiring the contactor to the motor (T1→T1, T2→T2, T3→T3) is now a required, graded connection, just like the control-circuit wiring.

Improved

The simulated motor will no longer show RUNNING from PLC logic alone — the load-side wiring must be complete too, matching how a real motor starter needs both a control circuit and power wiring before the motor actually turns.

Improved

Added a wiring caption under the Contactor and Motor cards ("T1–T2–T3 (load) → wire to motor T1–T2–T3") and hover tooltips on each terminal so the new requirement is clear at a glance, plus an updated Wiring Hint entry for Level 1 and a new progressive hint step for Level 2.

v1.32

Matched Start/Stop Pushbutton Card Sizing (Levels 1 & 2)

Development build v5.66

Fixed

The Start PB and Stop PB photos were cropped to slightly different proportions, making the Stop PB card noticeably taller than the Start PB card. Padded the Start PB photo to match, and re-calibrated its terminal positions, so both cards render at the same size.

v1.31

Overload Relay NC/NO Terminal Labeling (Levels 1 & 2)

Development build v5.65

Improved

The overload relay photo prints 95-96 and 97-98 with no visual difference between them, so there was no way to tell which pair is the Normally Closed contact used by the lesson just by looking. Added a "95–96 = NC (wire these) · 97–98 = NO (spare)" caption under the device, plus a hover tooltip on each terminal explaining what it is.

v1.30

Motor & Contactor Terminal Fixes (Levels 1 & 2)

Development build v5.64

Fixed

The contactor's load-side T1/T2/T3 terminals and the motor's T1/T2/T3 terminals are now clickable instead of dead zones on the photo. These are decorative (matching the printed terminal dots) and are not part of the graded circuit, same as the other spare terminals already on the board.

Improved

Added a small spinning fan badge to the motor card so a running motor has a real motion cue again, in addition to the green running glow — closer to how the old spinning "M" schematic symbol read at a glance.

Fixed

Removed the floating "M1" label that had started overlapping the contactor's printed T2 terminal once the load-side terminals were added; the card header already reads "Contactor M1", so the badge was redundant.

v1.29

Level 2 Photo-Realistic Wiring Board

Development build v5.63

New

Replaced the schematic wiring board in Level 2 (Assisted Motor Starter) with the same photo-realistic field device art used in Level 1: 24 VDC power supply, start/stop pushbuttons, overload relay, PLC I/O terminals, contactor, and motor.

Improved

Required wiring and ladder-logic grading are unchanged — only the artwork and layout are new.

Fixed

Fixed a CSS ordering bug that kept the new mobile "swipe right for more devices" hint invisible on Levels 1 and 7 even though the horizontal-scroll behavior itself worked; the hint now displays correctly on phones.

v1.28

Level 1 Photo-Realistic Wiring Board & Mobile Scroll Fix

Development build v5.62

New

Replaced the schematic wiring board in Level 1 (Motor Starter Lab) with photo-realistic field device art: 24 VDC power supply, start/stop pushbuttons, overload relay, PLC I/O terminals, contactor, and motor.

Improved

Required wiring, grading, and the RUN/Start/Stop/overload-trip behavior are unchanged — only the artwork and layout are new.

Fixed

Restored the site's horizontal-scroll wiring canvas on mobile for Level 1 (and Level 7, which had lost it in the recent photo-realistic redesign): device rows now scroll sideways instead of stacking every card down the page, with a swipe hint shown on phones.

Fixed

Tightened the PLC card's closely-spaced input/output terminal hit zones so clicking one terminal can no longer register a neighboring one.

v1.27

Level 7 Photo-Realistic Electrical Wiring Board

Development build v5.61

New

Replaced the schematic electrical wiring board in Level 7 with photo-realistic field device art: 24 VDC power supply, PLC I/O terminals, position/part/guard sensors, and valve solenoid coils.

Improved

Control wires now render in front of device photos with a light halo for legibility, and route with the same adaptive curve used by the pneumatic circuit board.

Improved

Wire coloring (brown/blue/black/red) and every required connection are unchanged — only the artwork and layout are new.

v1.26

Level 7 Photo-Realistic Pneumatic Circuit Board

Development build v5.60

New

Replaced the schematic pneumatic circuit board in Level 7 with photo-realistic field device art: FRL, 5/2 and 3/2 valves, meter-out flow controls, cylinders, and gripper.

Improved

Air tubing now renders in front of device photos with a light halo for legibility, using an adaptive curve that follows whichever axis two ports are most separated on.

Fixed

Added a version query string to the Level 7 stylesheet so future style updates take effect immediately instead of waiting on a stale cached copy.

v1.25

PLC-Style Live Ladder Monitoring

Development build v5.59

New

Expanded green TRUE-state ladder monitoring across every lesson with a PLC ladder view: Levels 1–5.

Improved

Removed RUN-mode dimming that was washing out live PLC monitor colors.

Improved

Level 4 troubleshooting now highlights the prebuilt ladder using the actual live machine and I/O state.

Improved

Level 5 ladder logic now displays live monitor states for the configured idle machine condition.

Fixed

Adjusted the wiring hint layout so it remains contained within the beginner wiring board.

v1.24

Level 1 Live Ladder Highlighting

Development build v5.58

Fixed

Corrected Level 1 RUN-mode monitoring so TRUE ladder contacts and energized coils visibly turn green.

Improved

Added stronger green symbols, tag fields, outlines, and power-flow stubs for active ladder instructions.

v1.23

Live Ladder Logic Monitor View

Development build v5.57

New

Added live green instruction highlighting in RUN mode for ladder logic with active PLC tag states.

Improved

True contacts and energized coils now display a PLC-style green monitor indication in Levels 1, 2, and 3.

Improved

Monitor highlighting automatically clears in PROGRAM mode and when an instruction becomes false.

v1.22

Level 1 Ladder Editor Delete Button Cleanup

Development build v5.56

Improved

Replaced the large "Delete rung" button in the shared beginner ladder editor with a compact red X button.

Improved

Updated the rung delete control styling for a cleaner, more professional-grade editing experience on mobile and desktop.

v1.21

Social Link Preview Improvements

Development build v5.55

Improved

Added a dedicated 1200 × 630 social-share image for Controls Trainer links.

Fixed

Updated Open Graph and Twitter/X metadata so shared links use a properly sized training preview instead of the homepage hero image.

v1.20

Interactive Training Showcase

Development builds v5.53–v5.54.3

New

Added a large homepage carousel showcasing real Controls Trainer lesson interfaces.

New

Added visual previews for motor starter training, inspection conveyor logic, VFD commissioning, and pneumatic automation.

Improved

Carousel now advances automatically every five seconds and supports previous/next controls, slide indicators, and mobile swipe.

Improved

Added smooth right-to-left slide transitions with a fixed 16:9 showcase frame for more polished motion.

v1.19

Public Development History

Development builds v5.52–v5.52.1

New

Added the public Updates & Changelog page.

Improved

Reconstructed the release history from the actual Controls Trainer development patches.

v1.18

Unified Advanced-Level Certificates

Development build v5.51

Improved

Levels 3–7 now use dedicated server-side certificate pages.

Improved

Certificates automatically use the learner name stored on the signed-in account.

Fixed

Removed incorrect certificate-level fallback behavior across advanced lessons.

Improved

Successful advanced-level completion now leads directly into the correct certificate flow.

v1.17

Level 6 Animation & Certificate Flow

Development builds v5.49–v5.50.1

New

Animated the Level 6 conveyor while the VFD is actually running.

Improved

Connected Level 6 acceptance testing directly to certificate completion.

Improved

Moved Level 6 certificate generation to a dedicated server-side route.

Fixed

Corrected Level 6 certificates displaying Level 1 information.

v1.16

Mobile Homepage Refinements

Development builds v5.46–v5.48

Improved

Increased Controls Trainer branding size on desktop and mobile.

Improved

Repositioned mobile hero copy and strengthened image-overlay readability.

Improved

Reduced excess mobile hero height so training content appears sooner.

v1.15

Level 4 Live Conveyor Visualization

Development build v5.45

New

Added moving belt, packages, and motor feedback to the Level 4 troubleshooting conveyor.

Improved

Animation responds to the actual contactor and machine state rather than playing independently.

v1.14

Advanced Ladder & Level 5 Workflow

Development builds v5.42–v5.44

Fixed

Corrected Level 5 ladder dropdowns closing immediately after being opened.

Improved

Moved Level 5 PLC I/O assignment into the proper workflow between wiring and programming.

Improved

I/O rows now begin blank so learners choose both the device and address.

Improved

Advanced lessons now require learners to add or select their own OTE outputs instead of receiving fully prebuilt rungs.

Improved

Replaced large rung-delete controls with a compact Studio-style red delete X.

v1.13

Ladder Editor Upgrade

Development build v5.41

New

Added drag-and-reorder behavior for ladder instructions.

Improved

Expanded the ladder programming workspace.

New

Added instruction conversion between XIC and XIO after placement.

New

Added manual OTE selection for advanced programming.

Improved

Renamed PLC scan display to Last Scan Time for clearer industrial terminology.

v1.12

Advanced Lesson Validation Audit

Development build v5.40

Fixed

Audited Levels 3–7 so stale earlier results cannot incorrectly satisfy final acceptance.

Fixed

Level 3 now verifies required sensors, physical terminals, I/O assignments, and turret ladder structure.

Fixed

Level 5 now validates complete sensor wiring, correct I/O mapping, conveyor logic, reject logic, and pilot-light logic.

Fixed

Level 6 now invalidates previous commissioning proof when configuration values are changed.

Fixed

Level 7 now rechecks hardware, I/O, pneumatic sequencing, and current acceptance conditions.

v1.11

PLC Scan & Starter Logic Accuracy

Development builds v5.34–v5.39

Fixed

Corrected stale PLC outputs after an output instruction is removed from a rung.

Fixed

Prevented an empty rung with only an OTE from energizing automatically.

Improved

Added clearer Level 1 and Level 2 completion messages for wiring, programming, PLC mode, and machine operation.

Fixed

Blocked incomplete starter logic from operating the training motor.

Fixed

Corrected seal-in behavior so the output image from the previous PLC scan is available during rung evaluation.

Improved

Parallel branches now begin blank so learners choose the proper seal-in contacts themselves.

v1.10

Certificates Added to the Training Platform

Development build v5.33

New

Added completion certificates as a visible Controls Trainer platform feature.

Improved

Updated homepage messaging to explain certificate completion to learners.

v1.9

Level 5 Complete Hardware Build

Development builds v5.32–v5.32.3

New

Completed the Level 5 automated inspection conveyor hardware set.

Improved

Removed fixed-device badges and made the hardware-selection experience more learner-driven.

Improved

Standardized Level 5 hardware card sizing and presentation.

New

Made every required and decoy Level 5 hardware device selectable instead of preselecting infrastructure.

v1.8

My Training Redesign & Performance

Development build v5.31

Improved

Redesigned My Training to match the main Controls Trainer visual experience.

Improved

Improved mobile layout and visibility of completed training levels.

Improved

Account pages load faster.

Improved

Preserved Full Access status and permanent Passed history.

v1.7

Homepage Platform Redesign

Development builds v5.29–v5.30.4

New

Introduced standardized lesson artwork and optimized web images.

Improved

Reworked homepage image scaling for mobile devices.

New

Added the integrated industrial automation hero presentation.

Improved

Redesigned the homepage into a polished training-platform layout.

New

Added feature icons and stronger training-platform messaging.

Improved

Added smooth hero image blending and improved mobile hero spacing.

v1.6

Level 7 Pneumatic Pick & Place

Development builds v5.28–v5.28.3

New

Added Level 7 Pneumatic Pick & Place Cell training.

New

Added hardware selection, PLC I/O, electrical wiring, pneumatic tubing, sequence logic, and acceptance testing.

Fixed

Corrected wiring and pneumatic path layering so connections remain visually usable.

Improved

Converted Level 7 into a hardware-driven build where selected components populate the work area.

Fixed

Improved mobile wiring hints in early training levels.

v1.5

Level 6 VFD Commissioning & Wiring Standards

Development builds v5.27–v5.27.13

New

Added Level 6 VFD Conveyor Commissioning with motor data, PLC I/O, control wiring, drive parameters, command logic, and acceptance testing.

Improved

Polished the Level 6 wiring workspace and added contextual commissioning hints.

Improved

Standardized Level 6 wiring presentation with earlier training levels.

Improved

Cleaned up Level 5 PLC modules, terminal labels, and device overlap.

Improved

Cleaned up the Level 3 wiring layout and PLC input-module alignment.

New

Established red as +24 V power and blue as 0 V/common across training wiring.

New

Added industrial three-wire sensor colors: brown supply, blue return, and black signal.

Fixed

Corrected Level 1, Level 2, and Level 3 wire colors to follow the new standard.

v1.4

Reliability & Mobile Polish

Development builds v5.25–v5.26

Improved

Sign-in, membership, checkout and lesson completion are more reliable.

Improved

Completed a broad mobile polish pass across the training interface.

v1.3

Guided Tutorials & Replay Controls

Development builds v5.24–v5.24.3

New

Added guided tutorial lightboxes to help learners understand the training workflow.

New

Added tutorial replay behavior for completed training levels.

Improved

Refined tutorial replay controls and removed duplicate homepage/account replay links.

v1.2

PLC Interface, Progress & Mobile Fixes

Development builds v5.21–v5.23.3

Improved

Reworked PLC controls and programming layout.

New

Introduced a more professional-grade ladder programming interface.

Fixed

Corrected instruction-palette text and programming controls.

New

Added permanent Passed indicators for completed lessons.

Improved

Updated the Passed treatment to a gold completion ribbon.

Fixed

Corrected Level 4 and Level 5 mobile layout/overlap issues.

v1.1

Controls Trainer Foundation

Development builds v5.16–v5.20

Improved

Stabilized the website, sign-in and training pages at launch.

Improved

Standardized operator-button colors with green Start and red Stop controls.

New

Added saved learner progress and permanent Passed status.

What appears here?

This public log focuses on improvements that matter to learners: new levels and features, interface improvements, training behavior, and important fixes. Small internal maintenance changes may not be listed individually.

Your next challenge · free to start

Put your skills to work.

Wire a motor starter in Level 1 or troubleshoot a stopped conveyor in Level 2. No account needed to start.

30-day giveaway: Pass both levels on your account to earn all 10 levels free for 30 days. Once per person.

Try Level 1 free →Try Level 2 free →
Website Design & Development by John Clore